MH
Mumbai City
P51900032067
RERA ID: P51900032067
Project Name: DOSTI EASTERN BAY - PHASE 3
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2027-09-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Wadala East, Vidyalankar College, Mumbai City-400037

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
CS 2A-116 SALT PAN DIVISION

Boundaries:
CS NO 2A-116 SALT PAN DIVISION
CS NO 2A-116 SALT PAN DIVISIONN CS NO 2A-116 SALT PAN DIVISION
WE
S
CS NO 2A- 116 SALT PAN DIVISION

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 1160 sq.mt.
Sanctioned Built-up Area: 36375 sq.mt.
Recreational Open Space: 5032 sq.mt.
No. of Buildings sanctioned: 2
No. of Floors sanctioned: 100
No. of basements: 6
No. of Plinths: 2
No. of Podiums: 8
No. of Stilts: 2
No. of Closed Parking: 550

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1RK 468 sq ft 1 0
2BHK 685 to 730 sq ft 244 124
3BHK 947 to 1124 sq ft 88 78
4BHK 1470 to 1555 sq ft 44 34
Project Developer:
DOSTI REALTY LTD
Organization Type: Company

Address: Dosti Group, 1St Floor, Lawrence And Mayo House, Dr D N Road, Fort, Near Khadi Bhandar, Abcd-400001, Ward Abcd, Mumbai City-400001

Office Phone: +91 22221 98500
Website URL: www.dostirealty.com


Member details:
Member Name Designation
RAJESH PREMJI SHAH Authorized Signatory
DEEPAK KISHAN GORADIA Managing Director
RAJUL VRAJLAL VORA Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
RAMNANI AND ASSOCIATES Architect
paras r vishwakarma Engineer
MANISH BARDIA AND COMPANY Chartered Accountant
J W CONSULTANTS Other Professional
MEP CONSULTING ENGINEERS Other Professional
HAFEEZ CONTRACTOR Other Professional
Talib & Shamsi Constructions Pvt. Ltd. Contractor
I E Electricals Pvt Ltd Contractor
Elegance Sanitation Contractor
Engineer Dream Ladder Construction LLP Contractor
Muskan Interior Contractor
Fujitec India Pvt Ltd Contractor


Projects in the state by this developer:
P51900032067 - DOSTI EASTERN BAY - PHASE 3 - Mumbai City
P51900030769 - DOSTI EASTERN BAY- PHASE 2 - Mumbai City
P51900025142 - DOSTI EASTERN BAY - PHASE 1 - Mumbai City
P51700010988 - Dosti Imperia - Dosti Majesta - Thane
Litigations

Active Litigations related to the project ? Yes

Cases
Court Name Case Number Case Type Petition Name Year Present Status
HIGH COURT OF BOMBAY 757 Civil Suit 2019 PRE ADMISSION STAGE
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Unveiling a New Landmark: DOSTI EASTERN BAY - Phase 3

DOSTI REALTY LTD., a renowned developer in the Mumbai real estate market, is poised to unveil its latest residential project, DOSTI EASTERN BAY - Phase 3, set to redefine urban living in the prestigious WADALA EAST locality. This new project, registered with MahaRERA under ID P51900032067, promises a luxurious and vibrant lifestyle with its meticulously planned amenities and prime location.

Situated on a 1160 sqmt plot, CS 2A-116 SALT PAN DIVISION, DOSTI EASTERN BAY - Phase 3 will comprise two towering structures, encompassing a total sanctioned FSI of 36375. The project is currently under construction, with a proposed completion date of September 30th, 2027. However, it is important to note that the project has been the subject of litigation, which potential buyers should be aware of.

The project boasts an array of modern amenities designed to cater to the diverse needs of its residents. These include a generous 5032 sqmt recreational open space, a 6-level basement, 2 plinth levels, 8 podium levels, and a total of 100 sanctioned floors. The project also features 2 stilts and a dedicated closed parking area for 550 vehicles.

DOSTI EASTERN BAY - Phase 3 is strategically located in WADALA EAST, a rapidly developing area known for its excellent connectivity, commercial hubs, and proximity to essential amenities. The project’s address, VIDYALANKAR COLLEGE, further underlines its prime location. The presence of established educational institutions, healthcare facilities, and retail options in the vicinity makes this project an attractive choice for families and professionals alike.

While the project is still in its early stages of development, DOSTI REALTY LTD. has established a reputation for delivering high-quality, innovative projects. The company’s commitment to quality and sustainability, coupled with the strategically chosen location and comprehensive amenities, make DOSTI EASTERN BAY - Phase 3 a promising addition to the Mumbai real estate landscape.

However, potential buyers should carefully review the project details, including the ongoing litigation, before making any investment decisions. The project’s website, www.dostirealty.com, and the developer’s contact number, 2222198500, provide further information and updates.

New documents listed below were uploaded to the Documents section:

  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 6 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1RK 43.48 1 0
2BHK 63.73 37 22
2BHK 63.97 37 22
2BHK 65.15 11 7
2BHK 65.78 1 0
2BHK 66.01 33 22
2BHK 66.33 44 14
2BHK 67.7 44 21
2BHK 67.88 37 16
3BHK 88.06 1 0
3BHK 93.77 33 32
3BHK 101.11 32 31
3BHK 101.23 11 8
3BHK 104.44 11 7
4BHK 136.66 33 27
4BHK 144.5 11 7

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 38
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 68
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 15
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
1 Overall Percentage of Completion of the work done For the entire Building /Wing 62.8
2 X number of Slabs of Super Structure 87
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 38
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 15
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
2 Overall Percentage of Completion of the work done For the entire Building /Wing 62

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 550 390 0

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Landscaping & Tree Planting : 40 PROVISION MADE FOR LAYOUT
Water Conservation, Rain water Harvesting : 60 PROVISION MADE FOR LAYOUT
Fire Protection And Fire Safety Requirements : 14 AS PER CFO
Electrical Meter Room, Sub-Station, Receiving Station : 40 NO RECEIVING STATION
Aggregate area of recreational Open Space : 20 PROVISION MADE FOR LAYOUT
Sewerage (Chamber, Lines, Septic Tank , STP) : 60 PROVISION MADE FOR LAYOUT
Storm Water Drains : 30 PROVISION MADE FOR LAYOUT

 

New documents listed below were uploaded to the Documents section:

  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 63.73 37 22
2BHK 63.97 37 22
2BHK 65.15 11 7
2BHK 66.01 33 22
2BHK 66.33 44 14
2BHK 67.7 44 21
2BHK 67.88 37 16
3BHK 101.11 32 31
3BHK 101.23 11 8
3BHK 104.44 11 7
3BHK 93.77 33 32
4BHK 136.66 33 27
4BHK 144.5 11 7

 

New documents listed below were uploaded to the Documents section:

  • 5 Disclosure of sold/ booked inventory

 

Sanctioned FSI of the project applied for registration (Sanctioned Built-up Area) field under Firm Details section updated with new value 36375.76

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 65.15 11 2
2BHK 66.01 33 18
2BHK 67.7 44 17
2BHK 67.88 37 15

 

New documents listed below were uploaded to the Documents section:

  • 4 Copy of Layout Approval (in case of layout)
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Copy of Layout Approval (in case of layout)
  • 9 Copy of Layout Approval (in case of layout)
  • 10 Copy of Layout Approval (in case of layout)
  • 11 Copy of Layout Approval (in case of layout)
  • 12 Copy of Layout Approval (in case of layout)
  • 13 Copy of Layout Approval (in case of layout)
  • 14 Copy of Layout Approval (in case of layout)
  • 3 Commencement Certificates / NA Order for plotted development
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Commencement Certificates / NA Order for plotted development
  • 15 Copy of Layout Approval (in case of layout)
  • 16 Copy of Layout Approval (in case of layout)
  • 17 Copy of Layout Approval (in case of layout)
  • 18 Copy of Layout Approval (in case of layout)
  • 19 Copy of Layout Approval (in case of layout)
  • 20 Copy of Layout Approval (in case of layout)
  • 21 Copy of Layout Approval (in case of layout)
  • 22 Copy of Layout Approval (in case of layout)
  • 23 Copy of Layout Approval (in case of layout)
  • 24 Copy of Layout Approval (in case of layout)
  • 25 Copy of Layout Approval (in case of layout)
  • 26 Copy of Layout Approval (in case of layout)
  • 27 Copy of Layout Approval (in case of layout)
  • 28 Copy of Layout Approval (in case of layout)
  • 29 Copy of Layout Approval (in case of layout)
  • 30 Copy of Layout Approval (in case of layout)
  • 31 Copy of Layout Approval (in case of layout)
  • 3 Building Plan Approval / NA Order for plotted development
  • 5 Copy of Layout Approval (in case of layout)
  • 6 Copy of Layout Approval (in case of layout)
  • 7 Copy of Layout Approval (in case of layout)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 15 PROVISION MADE FOR LAYOUT
Aggregate area of recreational Open Space : 5 PROVISION MADE FOR LAYOUT
Fire Protection And Fire Safety Requirements : 5 AS PER CFO
Water Conservation, Rain water Harvesting : 10 PROVISION MADE FOR LAYOUT
Electrical Meter Room, Sub-Station, Receiving Station : 20 NO RECEIVING STATION
Storm Water Drains : 20 PROVISION MADE FOR LAYOUT

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 87
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 33
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 7
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 15
1 Overall Percentage of Completion of the work done For the entire Building /Wing 60.2
2 X number of Slabs of Super Structure 83
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 7
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
2 Overall Percentage of Completion of the work done For the entire Building /Wing 58.2

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [10]
  • Building Plan Approval / NA Order for plotted development [2]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout) [3]
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory [4]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [7]
  • Proforma of Allotment letter