MH
Mumbai City
P51900030769
RERA ID: P51900030769
Project Name: DOSTI EASTERN BAY- PHASE 2
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2027-09-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Wadala East, Vidyalankar College, Fnorth-400037, Ward Fnorth, Mumbai City-400037

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
2A/116 OF SALT PAN DIVISION AND 4/356 OF MATUNGA DIVISION

Boundaries:
CS NO 2A 116 OF SALT PAN DIV4 356 OF MATUNGA
CS NO 2A 116 OF SALT PAN DIVISIONN CS NO 2A 116 of SALT PAN DIVISION
WE
S
CS NO 2A 116 OF SALT PAN DIV 4 356 OF MATUNGA

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 434 sq.mt.
Sanctioned Built-up Area: 12281 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 50
No. of basements: 3
No. of Plinths: 1
No. of Podiums: 4
No. of Stilts: 1
No. of Closed Parking: 177

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1RK 431 sq ft 1 0
2BHK 649 to 695 sq ft 169 159
Project Developer:
DOSTI REALTY LTD
Organization Type: Company

Address: Dosti Group, 1St Floor, Lawrence And Mayo House, Dr D N Road, Fort, Near Khadi Bhandar, Abcd-400001, Ward Abcd, Mumbai City-400001

Office Phone: +91 22221 98500
Website URL: www.dostirealty.com


Member details:
Member Name Designation
RAJESH PREMJI SHAH Authorized Signatory
DEEPAK KISHAN GORADIA Managing Director
RAJUL VRAJLAL VORA Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
RAMNANI AND ASSOCIATES Architect
PARAS R VISHWAKARMA Engineer
MANISH BARDIA AND COMPANY Chartered Accountant
J W CONSULTANTS LLP Other Professional
MEP CONSULTING ENGINEERS Other Professional
HAFEEZ CONTRACTOR Other Professional
Talib & Shamsi Constructions Pvt. Ltd. Contractor
I E Electricals Pvt Ltd Contractor
Elegance Sanitation Contractor
Bharat Wala Contractor
Muskan Interior Contractor
Fujitec India Pvt Ltd Contractor


Projects in the state by this developer:
P51900032067 - DOSTI EASTERN BAY - PHASE 3 - Mumbai City
P51900030769 - DOSTI EASTERN BAY- PHASE 2 - Mumbai City
P51900025142 - DOSTI EASTERN BAY - PHASE 1 - Mumbai City
P51700010988 - Dosti Imperia - Dosti Majesta - Thane
Litigations

Active Litigations related to the project ? Yes

Cases
Court Name Case Number Case Type Petition Name Year Present Status
HIGH COURT OF BOMBAY 757 Civil Suit 2019 PRE ADMISSION STAGE
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

An Introduction to Dosti Eastern Bay - Phase 2: A New Residential Development in Wadala East, Mumbai

Dosti Realty Ltd. is pleased to announce the launch of its new residential project, Dosti Eastern Bay - Phase 2, in the bustling locality of Wadala East, Mumbai. This project, registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) under ID P51900030769, promises to redefine modern living with its luxurious amenities and strategic location.

Located on a spacious plot of 434 sq. meters, encompassing Survey Numbers 2A/116 of Salt Pan Division and 4/356 of Matunga Division, Dosti Eastern Bay - Phase 2 boasts a single sanctioned building rising to 50 floors, offering a comprehensive range of residential options. With a proposed completion date of September 30th, 2027, this project promises a timely delivery of meticulously crafted homes.

The project’s strategic location in Wadala East offers residents convenient access to various essential amenities and well-established infrastructure. The nearby Vidya Lankrar College and the proximity to Ward FNorth contribute to the area’s vibrant atmosphere and social fabric.

Dosti Eastern Bay - Phase 2 is designed to provide a holistic living experience with an emphasis on resident well-being. The project features a generous allocation of space for parking, encompassing 177 closed parking spaces. The inclusion of multiple basements, a podium, and a stilt further enhance the project’s functionality and ensure a comfortable living environment.

However, it is important to note that the project is currently subject to litigation, which is a factor prospective buyers should carefully consider before making an investment decision. This information is publicly available through MahaRERA and should be thoroughly reviewed alongside the project details.

Despite the legal complexities, Dosti Eastern Bay - Phase 2 offers a compelling investment opportunity in a thriving location. With Dosti Realty Ltd.’s reputation for quality construction and customer satisfaction, this project promises to be a significant addition to the Mumbai real estate landscape.

This essay serves as an introductory overview of Dosti Eastern Bay - Phase 2. Prospective buyers are encouraged to contact Dosti Realty Ltd. directly for further information, including detailed specifications, pricing, and updates on the project’s legal status.

New documents listed below were uploaded to the Documents section:

  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 6 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1RK 40.08 1 0
2BHK 60.38 44 36
2BHK 61.31 44 43
2BHK 61.36 37 36
2BHK 64.64 44 44

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 77
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 79
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 97
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
1 Overall Percentage of Completion of the work done For the entire Building /Wing 79.3

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 177 161 0

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Aggregate area of recreational Open Space : 40 PROVISION MADE FOR LAYOUT
Fire Protection And Fire Safety Requirements : 78 AS PER CFO NOC
Water Conservation, Rain water Harvesting : 60 PROVISION MADE FOR LAYOUT
Sewerage (Chamber, Lines, Septic Tank , STP) : 60 PROVISION MADE FOR LAYOUT
Landscaping & Tree Planting : 50 PROVISION MADE FOR LAYOUT

 

New documents listed below were uploaded to the Documents section:

  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 60.38 44 36
2BHK 61.31 44 43
2BHK 61.36 37 36

 

New documents listed below were uploaded to the Documents section:

  • 5 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 60.38 44 29
2BHK 61.31 44 42
2BHK 64.64 44 44

 

New documents listed below were uploaded to the Documents section:

  • 16 Copy of Layout Approval (in case of layout)
  • 4 Commencement Certificates / NA Order for plotted development
  • 3 Commencement Certificates / NA Order for plotted development
  • 17 Copy of Layout Approval (in case of layout)
  • 18 Copy of Layout Approval (in case of layout)
  • 4 Building Plan Approval / NA Order for plotted development
  • 8 Copy of Layout Approval (in case of layout)
  • 9 Copy of Layout Approval (in case of layout)
  • 10 Copy of Layout Approval (in case of layout)
  • 11 Copy of Layout Approval (in case of layout)
  • 12 Copy of Layout Approval (in case of layout)
  • 13 Copy of Layout Approval (in case of layout)
  • 14 Copy of Layout Approval (in case of layout)
  • 15 Copy of Layout Approval (in case of layout)
  • 7 Copy of Layout Approval (in case of layout)
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 6 Copy of Layout Approval (in case of layout)
  • 5 Copy of Layout Approval (in case of layout)
  • 4 Copy of Layout Approval (in case of layout)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Copy of Layout Approval (in case of layout)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 55
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 69
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 82
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
1 Overall Percentage of Completion of the work done For the entire Building /Wing 73.6

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Electrical Meter Room, Sub-Station, Receiving Station : 80 NO RECEIVING STATION
Aggregate area of recreational Open Space : 20 PROVISION MADE FOR LAYOUT
Sewerage (Chamber, Lines, Septic Tank , STP) : 15 PROVISION MADE FOR LAYOUT
Storm Water Drains : 30 PROVISION MADE FOR LAYOUT
Water Conservation, Rain water Harvesting : 10 PROVISION MADE FOR LAYOUT
Fire Protection And Fire Safety Requirements : 66 AS PER CFO NOC

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [10]
  • Building Plan Approval / NA Order for plotted development [3]
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout) [2]
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory [4]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [8]
  • Proforma of Allotment letter