RERA ID: P51900025142
Project Name: DOSTI EASTERN BAY - PHASE 1
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2028-03-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Wadala East, Vidyalankar College Road, Fnorth-400037, Ward Fnorth, Mumbai City-400037

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
2A116 OF SALT PAN DIVISION AND 4356 OF MATUNGA DIVISION

Boundaries:
CS NO 2A BY 116 OF SALT PAN DIVISION
CS NO 2A BY 116 OF SALT PAN DIVISIONN CS NO 2A by 116 of SALT PAN DIVISION
WE
S
CS NO 2A BY 116 OF SALT PAN DIVISION

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 1088 sq.mt.
Sanctioned Built-up Area: 47304 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 2
No. of Floors sanctioned: 100
No. of basements: 3
No. of Plinths: 2
No. of Podiums: 8
No. of Stilts: 2
No. of Open Parking: 31
No. of Closed Parking: 592

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1RK 245 to 395 sq ft 2 2
2BHK 544 to 672 sq ft 288 285
3BHK 939 to 1014 sq ft 132 127
Project Developer:
DOSTI REALTY LTD
Organization Type: Company

Address: Dosti Group, 1St Floor, Lawrence And Mayo House, Dr D N Road, Fort, Near Khadi Bhandar, Abcd-400001, Ward Abcd, Mumbai City-400001

Office Phone: +91 22221 98500
Website URL: www.dostirealty.com


Member details:
Member Name Designation
RAJESH PREMJI SHAH Authorized Signatory
DEEPAK KISHAN GORADIA Managing Director
RAJUL VRAJLAL VORA Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
TALIB & SHAMSI CONSTRUCTIONS PVT LTD Contractor
RAMNANI & ASSOCIATES Architect
J W CONSULTANT LLP Other Professional
MEP CONSULTING ENGINEERS Other Professional
ARCHITECT HAFEEZ CONTRACTOR Other Professional
MANISH BARDIA & CO Chartered Accountant
PARAS R VISHWAKARMA Engineer
Talib & Shamsi Constructions Pvt. Ltd. Contractor
I E Electricals Pvt Ltd Contractor
Elegance Sanitation Contractor
Bharat Wala Contractor
Rakesh Interior Contractor
Fujitec India Pvt Ltd Contractor


Projects in the state by this developer:
P51900032067 - DOSTI EASTERN BAY - PHASE 3 - Mumbai City
P51900030769 - DOSTI EASTERN BAY- PHASE 2 - Mumbai City
P51900025142 - DOSTI EASTERN BAY - PHASE 1 - Mumbai City
P51700010988 - Dosti Imperia - Dosti Majesta - Thane
Litigations

Active Litigations related to the project ? Yes

Cases
Court Name Case Number Case Type Petition Name Year Present Status
HIGH COURT OF BOMBAY 757 Civil Suit 2019 PRE ADMISSION STAGE
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

DOSTI EASTERN BAY - PHASE 1: A New Residential Project in the Heart of Wadala East

DOSTI EASTERN BAY - PHASE 1, a new residential project by DOSTI REALTY LTD, is poised to redefine luxury living in Mumbai’s burgeoning Wadala East neighborhood. Located on plot 2A116 of Salt Pan Division and 4356 of Matunga Division, this ambitious project boasts a prime location on Vidyalanakar College Road, offering residents easy access to the city’s best amenities and attractions.

Registered with MahaRERA under ID P51900025142, DOSTI EASTERN BAY - PHASE 1 is currently under construction, with a projected completion date of March 30th, 2028. The project is facing litigation, a matter that potential buyers should carefully consider and research thoroughly.

Spanning a total plot area of 1088 square meters, the development comprises two buildings, each with 100 sanctioned floors, including three basements, two plinths, eight podiums, and two stilts. These towering structures will offer residents panoramic city views and a luxurious living experience. The project also incorporates a considerable number of parking spaces, including 31 open parking spaces and 592 closed parking spaces.

DOSTI REALTY LTD, a reputable real estate developer known for its commitment to quality and innovation, has meticulously planned DOSTI EASTERN BAY - PHASE 1. The project has been designed with a focus on maximizing living space and optimizing amenities. While the project currently lacks recreational open space as per the sanctioned plan, the developer’s website, www.dostirealty.com, promises a comprehensive suite of amenities for residents.

Despite the ongoing legal proceedings, DOSTI EASTERN BAY - PHASE 1 presents an attractive opportunity for homebuyers seeking a luxurious and well-connected lifestyle in Mumbai. With its prime location, well-planned design, and the reputation of DOSTI REALTY LTD, this project promises to be a landmark addition to the city’s skyline. However, it is crucial for potential buyers to conduct thorough due diligence, including understanding the details of the ongoing litigation, before making any investment decisions.

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 53
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 98
1 Overall Percentage of Completion of the work done For the entire Building /Wing 95.1
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 34
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 98
2 Overall Percentage of Completion of the work done For the entire Building /Wing 93.2

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1RK 22.82 1 1

 

New documents listed below were uploaded to the Documents section:

  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Treatment And Disposal Of Sewage And Sullage Water : 95 PROVISION MADE FOR STP
Solid Waste Management And Disposal : 90 PROVISION MADE FOR OWC
Landscaping & Tree Planting : 80 PROVISION MADE IN LAYOUT
Storm Water Drains : 90 PROVISION MADE IN LAYOUT
Sewerage (Chamber, Lines, Septic Tank , STP) : 95 PROVISION MADE IN LAYOUT
Aggregate area of recreational Open Space : 60 PROVISION MADE IN LAYOUT
Water Conservation, Rain water Harvesting : 90 PROVISION MADE IN LAYOUT
Fire Protection And Fire Safety Requirements : 100 AS PER CFO NOC

 

New documents listed below were uploaded to the Documents section:

  • 10 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1RK 22.82 1 0
1RK 36.77 1 1
2BHK 50.61 81 80
2BHK 61.49 37 37
2BHK 61.7 38 38
2BHK 61.75 88 86
2BHK 62.51 44 44
3BHK 87.31 44 40
3BHK 88.01 44 44
3BHK 94.26 44 43

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 98
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 24
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
1 Overall Percentage of Completion of the work done For the entire Building /Wing 91.7
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 93
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 14
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
2 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 592 548 0

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 60 PROVISION MADE IN LAYOUT
Landscaping & Tree Planting : 50 PROVISION MADE IN LAYOUT
Water Conservation, Rain water Harvesting : 60 PROVISION MADE IN LAYOUT
Fire Protection And Fire Safety Requirements : 95 AS PER CFO NOC
Electrical Meter Room, Sub-Station, Receiving Station : 100 NO METER ROOM AND NO RECEIVING STATION
Aggregate area of recreational Open Space : 40 PROVISION MADE IN LAYOUT

 

New documents listed below were uploaded to the Documents section:

  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1RK 36.77 1 1
3BHK 94.26 44 43

 

New documents listed below were uploaded to the Documents section:

  • 9 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 61.7 38 38
2BHK 61.75 88 86
3BHK 87.31 44 41

 

New documents listed below were uploaded to the Documents section:

  • 16 Copy of Layout Approval (in case of layout)
  • 15 Copy of Layout Approval (in case of layout)
  • 14 Copy of Layout Approval (in case of layout)
  • 13 Copy of Layout Approval (in case of layout)
  • 12 Copy of Layout Approval (in case of layout)
  • 11 Copy of Layout Approval (in case of layout)
  • 10 Copy of Layout Approval (in case of layout)
  • 9 Copy of Layout Approval (in case of layout)
  • 8 Copy of Layout Approval (in case of layout)
  • 7 Copy of Layout Approval (in case of layout)
  • 17 Copy of Layout Approval (in case of layout)
  • 18 Copy of Layout Approval (in case of layout)
  • 19 Copy of Layout Approval (in case of layout)
  • 6 Copy of Layout Approval (in case of layout)
  • 5 Copy of Layout Approval (in case of layout)
  • 4 Copy of Layout Approval (in case of layout)
  • 4 Commencement Certificates / NA Order for plotted development
  • 3 Commencement Certificates / NA Order for plotted development
  • 24 Copy of Layout Approval (in case of layout)
  • 23 Copy of Layout Approval (in case of layout)
  • 22 Copy of Layout Approval (in case of layout)
  • 21 Copy of Layout Approval (in case of layout)
  • 20 Copy of Layout Approval (in case of layout)
  • 5 Building Plan Approval / NA Order for plotted development
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Aggregate area of recreational Open Space : 20 PROVISION MADE IN LAYOUT
Storm Water Drains : 30 PROVISION MADE IN LAYOUT
Sewerage (Chamber, Lines, Septic Tank , STP) : 15 PROVISION MADE IN LAYOUT
Fire Protection And Fire Safety Requirements : 68 AS PER CFO NOC
Electrical Meter Room, Sub-Station, Receiving Station : 80 NO METER ROOM AND NO RECEIVING STATION
Water Conservation, Rain water Harvesting : 10 PROVISION MADE IN LAYOUT

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 94
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 89
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 99
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 60
1 Overall Percentage of Completion of the work done For the entire Building /Wing 84.2
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 89
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 87
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 98
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 55
2 Overall Percentage of Completion of the work done For the entire Building /Wing 82.9

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [13]
  • Building Plan Approval / NA Order for plotted development [4]
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout) [3]
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory [8]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) [5]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [6]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [10]
  • Other [3]
  • Proforma of Allotment letter