26 |
Excavation |
100 |
26 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
10 |
27 |
Excavation |
100 |
27 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
10 |
28 |
Excavation |
100 |
28 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
10 |
29 |
Excavation |
100 |
29 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
10 |
30 |
Excavation |
100 |
30 |
X number of Basement(s) and Plinth |
100 |
30 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
20 |
31 |
Excavation |
100 |
31 |
X number of Basement(s) and Plinth |
100 |
31 |
X number of Slabs of Super Structure |
100 |
31 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
31 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
31 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
31 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
31 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
31 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
32 |
Excavation |
100 |
32 |
X number of Basement(s) and Plinth |
100 |
32 |
X number of Slabs of Super Structure |
100 |
32 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
25 |
32 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
32 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
50 |
32 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
47.5 |
33 |
Excavation |
100 |
33 |
X number of Basement(s) and Plinth |
100 |
33 |
X number of Slabs of Super Structure |
100 |
33 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
25 |
33 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
33 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
42.5 |
34 |
Excavation |
100 |
34 |
X number of Basement(s) and Plinth |
100 |
34 |
X number of Slabs of Super Structure |
100 |
34 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
50 |
34 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
34 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
45 |
35 |
Excavation |
100 |
35 |
X number of Basement(s) and Plinth |
100 |
35 |
X number of Slabs of Super Structure |
100 |
35 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
75 |
35 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
35 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
35 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
60 |
35 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
63.5 |
36 |
Excavation |
100 |
36 |
X number of Basement(s) and Plinth |
100 |
36 |
X number of Slabs of Super Structure |
100 |
36 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
50 |
36 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
36 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
50 |
36 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
50 |
37 |
Excavation |
100 |
37 |
X number of Basement(s) and Plinth |
100 |
37 |
X number of Slabs of Super Structure |
100 |
37 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
30 |
37 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
33 |
38 |
Excavation |
100 |
38 |
X number of Basement(s) and Plinth |
100 |
38 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
20 |