RERA ID: P51600030879
Project Name: GANRAJ RESIDENCY CO-OP HOUSING SOCIETY LTD
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-08-01
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Jail Road, Nashik Road, Nashik, Shivaji Nagar, Jail Road, Nashik-422101

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
PLOT NO 20 SR NO 12/2/20 DASAK SHIWAR

Boundaries:
ADJ PLOT NO 19
9 METER WIDE ROADN ADJ SR NO 12 3B
WE
S
ADJ PLOT NO 21

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 432 sq.mt.
Sanctioned Built-up Area: 1067 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 6
No. of Plinths: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 428 to 638 sq ft 20 11
Project Developer:
GANRAJ RESIDENCY CO-OP HOUSING SOCIETY LTD
Organization Type: Societies

Address: Plot N0 20, Sr No 12/2/20 Dasak Shiwar, Jail Road, Shivaji Nagar, Nashik-422101

Office Phone: +91 95526 39266


Member details:
Member Name Designation
MANSUKH HARJI BHAGAT Authorized Signatory
MEET NARESH PATEL Secretory


Other Professionals involved:
Professional Name Professional Type
NATESH AND ASSOCIATES Chartered Accountant
VINOD MAKANI Architect
KISHOR CHOPDA Engineer


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing GANRAJ RESIDENCY: A New Milestone in Nashik

In the bustling city of Nashik, a new residential project is poised to redefine urban living: GANRAJ RESIDENCY. Registered under RERA ID P51600030879, this project is a testament to discerning design and impeccable craftsmanship.

Project Highlights

GANRAJ RESIDENCY stands tall as a one-of-a-kind residential development, offering a serene haven amidst the urban landscape. With a proposed completion date of August 2024, this project promises a timely delivery. The project boasts no litigations, ensuring peace of mind for its future residents.

Location and Connectivity

Perfectly situated in Jail Road, Nashik Road, GANRAJ RESIDENCY enjoys excellent connectivity. It is conveniently located near the Nashik Railway Station and is well-connected to major roadways and public transportation options. The project’s proximity to schools, hospitals, and shopping centers makes it an ideal destination for families and professionals alike.

Architectural Ingenuity

Designed with a keen eye for detail, GANRAJ RESIDENCY features a meticulously planned layout and elegant aesthetics. Its single tower boasts 6 sanctioned floors, offering a wide range of spacious 2BHK units. The apartments range in size from 428 to 638 square feet, providing ample space for comfortable living.

Amenities and Features

GANRAJ RESIDENCY offers a comprehensive suite of amenities that cater to the needs of modern homeowners. These include a well-equipped gymnasium, a children’s play area, and a lush garden. The project also boasts a 1-plinth level, ensuring privacy and exclusivity for its residents.

Investment Potential

As a new project in a rapidly developing area, GANRAJ RESIDENCY presents an exceptional investment opportunity. Its prime location, high-quality construction, and competitive pricing offer investors the potential for significant capital appreciation over time.

Conclusion

GANRAJ RESIDENCY is a residential masterpiece that redefines urban living in Nashik. With its exceptional design, prime location, and array of amenities, this project is poised to become a sought-after destination for those seeking a tranquil and fulfilling home in the heart of Maharashtra.

New documents listed below were uploaded to the Documents section:

  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Architect’s Certificate on Completion of Project (Form 4)
  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 100

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 13 11 100

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 39.79 2 1
2BHK 50.57 3 1
2BHK 50.87 5 3
2BHK 57.04 5 3
2BHK 59.29 5 3

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Supply : 100 RAIN WATER HARVESTING
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 CHAMBER

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 X number of Podiums 100
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
1 Overall Percentage of Completion of the work done For the entire Building /Wing 98

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Electrical Meter Room, Sub-Station, Receiving Station : 100 METER ROOM
Water Conservation, Rain water Harvesting : 100 COMPLETED
Landscaping & Tree Planting : 100 5 TREES

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • Building Plan Approval / NA Order for plotted development
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • Other [2]
  • Proforma of Allotment letter [2]
  • Status of Formation of Legal Entity (Society/Co Op etc.)