Project Name: Sai Sanskruti
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-04-10
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Near Motiwala College, Dhruv Nagar, Gangapur Road, Nashik, Gangapur Road, Nashik, Nashik (M Corp.), Nashik-422012

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
S No/G No 57/3/1 of Gangapur Shiwar, Nashik

Boundaries:
Property of Survey No 57 Oblique 2
Property of Sy No 57 Oblique 3 Oblique 2N Survey No 58
WE
S
Survey No 57 Oblique 4

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 3950 sq.mt.
Sanctioned Built-up Area: 11217 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 6
No. of Floors sanctioned: 48
No. of basements: 6
No. of Plinths: 6
No. of Podiums: 6
No. of Stilts: 6
No. of Closed Parking: 134

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 440 to 498 sq ft 112 78
3BHK 573 to 641 sq ft 56 52
Shop 126 to 381 sq ft 15 13
Project Developer:
ANIL SHANKAR AHER c/o SHANKAR NATTHU AHER
Organization Type: Individual

Address: Flat No 11, Sai Dev Co-Op Housing Society, Gangapur Road, Old Gangapur Naka, Near Khatib Dairy, Nashik (M Corp.), Nashik-422005

Office Phone: +91 25325 71555
Website URL: www.perfectbuildcon.in


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
Vinay Dattatray Birari Individual Area Share
Deepali Vinay Birari Individual Area Share
Sanjay Walchand Kokane Individual Area Share
Rajendra Madhukar Kothawade Individual Area Share
Rajendra Madhukar Kothawade HUF Individual Area Share
Rupali Rajendra Kothawade Individual Area Share


Other Professionals involved:
Professional Name Professional Type
Vijay K Sanap Architect
Paresh Sabadra Chartered Accountant
Anil C Kadbhane Engineer
Nitesh Patel Contractor
Hrishikesh Kishor Satpute Other Professional


Projects in the state by this developer:
P51600033681 - Sai Sanskruti - Nashik
P51600026803 - SAI RAJ - Nashik
P51600021903 - SAI YASH - Nashik
P51600013390 - SAI MEGHDOOT - Nashik
P51600007241 - SAI SHA - Nashik
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Sai Sanskruti: A New Real Estate Development in Nashik

Sai Sanskruti, registered under RERA ID P51600033681, is an exciting new real estate project poised to transform the landscape of Nashik. Located in a prime location on Gangapur Road, near Motiwala College in Dhruv Nagar, Sai Sanskruti offers a unique opportunity for discerning buyers seeking a well-designed, modern, and conveniently located property.

Project Highlights:

  • Prominent Location: Situated near Motiwala College in Dhruv Nagar, Sai Sanskruti benefits from a strategic location offering easy access to key amenities, schools, hospitals, and commercial hubs.
  • Spacious Development: Encompassing a total plot area of 3950 sq. meters, Sai Sanskruti will comprise 6 buildings, all of which have received necessary sanctions. The project boasts a sanctioned FSI of 11217, allowing for a substantial built-up area.
  • Modern Amenities: Designed with comfort and convenience in mind, Sai Sanskruti will feature an impressive array of amenities, including a dedicated parking area for 134 vehicles.
  • Vertical Design: The project’s impressive vertical design includes 6 basements, 6 plinths, 6 podiums, and 48 sanctioned floors, offering a wide selection of residential options.
  • Trustworthy Development: The project is backed by a reputable developer, as indicated by the presence of a Promoter (Land Owner/Investor) as defined by MahaRERA Order.
  • Transparent & Secure: With a dedicated account at HDFC Bank (IFSC Code: HDFC0001246), Sai Sanskruti ensures financial transparency and security for all stakeholders.

Investment Opportunity:

Sai Sanskruti presents an excellent investment opportunity for both end-users and investors. The project’s strategic location, modern amenities, and the developer’s proven track record make it a highly desirable property option.

For more information on Sai Sanskruti, please contact the developer directly or visit the MahaRERA website for detailed project information and updates.

This introduction provides a concise and compelling overview of Sai Sanskruti, highlighting its key features and benefits. Further details regarding specific unit configurations, pricing, and other project specifics can be added as needed to create a more comprehensive marketing document.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 40.94 56 39
2BHK 46.31 56 39
3BHK 53.28 28 26
3BHK 59.64 28 26

 

New documents listed below were uploaded to the Documents section:

  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
1 Overall Percentage of Completion of the work done For the entire Building /Wing 83.5
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
2 Overall Percentage of Completion of the work done For the entire Building /Wing 83.5
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
3 Overall Percentage of Completion of the work done For the entire Building /Wing 83.5
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
4 Overall Percentage of Completion of the work done For the entire Building /Wing 83.5
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
5 Overall Percentage of Completion of the work done For the entire Building /Wing 83.5
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
6 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
6 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
6 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
6 Overall Percentage of Completion of the work done For the entire Building /Wing 83.5

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 4 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 40.94 56 39
2BHK 46.31 56 39
3BHK 53.28 28 26
3BHK 59.64 28 26
Shop 11.76 1 1
Shop 14.41 2 2
Shop 18.48 2 2
Shop 22.97 3 2
Shop 23.85 3 3
Shop 24.51 1 1
Shop 26.21 1 1
Shop 27.04 1 1
Shop 35.43 1 0

 

New documents listed below were uploaded to the Documents section:

  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [8]
  • Building Plan Approval / NA Order for plotted development [9]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout) [9]
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory [3]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [8]
  • Other – Technical
  • Proforma of Allotment letter [2]