MH
Nashik
P51600032982
RERA ID: P51600032982
Project Name: Gajanan Park Phase 2 - Building C
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2026-12-31
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Saraf Nagar, Wadala Pathardi Road, Nashik-422002

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
1A,2,3,4,5 Sno -896/3

Boundaries:
Open Sapce
Open spaceN 9Mtr Adjoining Road
WE
S
9Mtr Adjoining Road

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 3790 sq.mt.
Sanctioned Built-up Area: 3487 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 8
No. of basements: 1
No. of Plinths: 1
No. of Stilts: 1
No. of Closed Parking: 35

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 614 sq ft 14 0
1RK 520 sq ft 14 0
2BHK 656 to 693 sq ft 21 0
Project Developer:
Jaiprasad constructions and developers LLP
Organization Type: Company

Address: 4, Jaiprasad Residency, Lane No 1, Old Pandit Colony, Pandit Colony, Nashik (M Corp.), Nashik-422002

Office Phone: +91 25323 18284


Member details:
Member Name Designation
Prasad ramchandra Saraf Authorized Signatory
Jayant Manohar mehendale Authorized Signatory
Ranjana rajaram Baste Director


Other Professionals involved:
Professional Name Professional Type
Ar Amol S Ghuge and Associates Architect
Sharad Ugale Engineer
R S Baste and Co Chartered Accountant


Projects in the state by this developer:
P51600052658 - Gajanan Park phase 3 - Building D - Nashik
P51600032982 - Gajanan Park Phase 2 - Building C - Nashik
P51600030546 - Gajanan park Phase 1 - Building A,B - Nashik
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Gajanan Park Phase 2 - Building C: A New Residential Development in Nashik

Gajanan Park Phase 2 - Building C, a new residential project by Jaiprasad Constructions and Developers LLP, promises to offer a comfortable and convenient lifestyle in the vibrant city of Nashik. This project, registered with MahaRERA under ID P51600032982, is located in the sought-after Saraf Nagar locality, providing easy access to key amenities and conveniences.

The project is nestled on a spacious plot encompassing 3790 sqmts, bordered by a 9-meter adjoining road to the east and south, and open spaces to the north and west. This strategic location provides residents with ample natural light and ventilation while ensuring a peaceful and serene environment. The project boasts a sanctioned built-up area of 3487 sqmts, offering a total of 49 meticulously designed residential units across various configurations.

Gajanan Park Phase 2 - Building C caters to a wide range of housing needs, offering 1BHK, 1RK, and 2BHK units with carpet areas ranging from 520 sq ft to 693 sq ft. The project incorporates a well-planned layout with a basement, plinth, stilt, and 8 sanctioned floors, maximizing space utilization while maintaining aesthetic appeal.

Key Features and Amenities:

  • Prime Location: Situated in Saraf Nagar, known for its connectivity and convenient access to essential amenities.
  • Spacious Units: Offering 1BHK, 1RK, and 2BHK units with varying sizes to suit individual needs.
  • Modern Amenities: The project is designed with a focus on modern living and includes ample parking space for residents.
  • Safe and Secure Environment: The project prioritizes safety and security with comprehensive measures in place.

Project Status and Completion:

Gajanan Park Phase 2 - Building C is a new project currently under construction, with an estimated completion date of December 31st, 2026. The project is free from any legal disputes, ensuring a transparent and hassle-free investment opportunity.

A Perfect Blend of Comfort and Convenience:

Gajanan Park Phase 2 - Building C is designed to provide residents with a comfortable and convenient living experience, offering a perfect blend of modern amenities and a peaceful living environment. The project’s strategic location, well-planned layout, and thoughtful design make it an ideal choice for individuals and families seeking a quality living space in Nashik.

For further information and inquiries, please contact Jaiprasad Constructions and Developers LLP at their office number: 2532318284.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 57.07 14 0
1RK 48.33 14 0
2BHK 61.03 14 0
2BHK 64.43 7 0

 

New documents listed below were uploaded to the Documents section:

  • 1 Architect’s Certificate on Completion of Project (Form 4)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [5]
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [2]
  • Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • Proforma of Allotment letter [2]
  • Status of Formation of Legal Entity (Society/Co Op etc.)