P51900033034
RERA ID: P51900033034
Project Name: Swayam
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-12-31
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Mahim West, Lady Jamshedji Road, Gnorth-400016, Ward Gnorth, Mumbai City-400016

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
104

Boundaries:
Lt P N Kotnis Marg
FP No 105N Lady Jamshedji Road
WE
S
FP No 103

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 686 sq.mt.
Sanctioned Built-up Area: 1248 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 22
No. of basements: 1
No. of Plinths: 1
No. of Stilts: 1
No. of Closed Parking: 43

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 386 to 407 sq ft 22 17
2BHK 541 sq ft 2 2
Shop 2009 sq ft 1 0
Project Developer:
Gala Habitats LLP
Organization Type: Partnership

Address: Unit No 2, A Wing Baba Nagar, St. Peters Road, Bandra West, Off Hill Road, Andheri, Mumbai Suburban-400050

Office Phone: +91 22264 04220


Member details:
Member Name Designation
Rajendra Gala Shah Authorized Signatory
Jaywantiben Shah Partner


Other Professionals involved:
Professional Name Professional Type
Rajesh Kumar Pande Chartered Accountant
The Design Studio Architect
Sanjay Lala Engineer
M/s Frames Other Professional


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Swayam: A Modern Architectural Gem in Mahim West

Gala Habitats LLP, a reputable partnership firm, proudly presents “Swayam,” a new residential project located in the sought-after Mahim West area of Mumbai. This project, registered under MahaRERA with ID P51900033034, promises to redefine luxury living with its contemporary design and thoughtful amenities.

Swayam occupies a prime plot spanning 686 sq. meters, situated on Lady Jamshedji Road, with strategic boundaries encompassing FP No. 103, 105 and Lt P N Kotnis Marg. The project is marked by its unique architectural design, boasting a single building with 22 sanctioned floors, including a basement, plinth, stilt, and closed parking for 43 vehicles.

This ambitious project offers an impressive sanctioned FSI of 1248, allowing for an optimal utilization of space. The proposed FSI, while not yet sanctioned, is an additional 88 sq. meters, showcasing the potential for even greater living spaces. The total permissible FSI stands at 1337, ensuring that Swayam will be a benchmark for modern living in the area.

While the project is still under construction, the proposed date of completion is December 31st, 2025. This timeline, combined with the absence of any litigations, signifies a commitment to transparency and timely delivery.

Swayam is more than just a building; it is a testament to quality, innovation, and comfort. The project is designed to cater to discerning individuals who value a modern, urban lifestyle. With its prime location and strategic amenities, Swayam is set to become an iconic landmark in Mahim West.

For further details and to explore the possibilities of making Swayam your future home, please contact Gala Habitats LLP at 2226404220.

New documents listed below were uploaded to the Documents section:

  • 11 Disclosure of sold/ booked inventory
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 78
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 65
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
1 Overall Percentage of Completion of the work done For the entire Building /Wing 51.3

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Electrical Meter Room, Sub-Station, Receiving Station : 30 Before Occupation
Water Conservation, Rain water Harvesting : 30 Before Completion
Fire Protection And Fire Safety Requirements : 10 Before Completion

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 35.89 17 16
1BHK 36.66 4 0
1BHK 37.86 1 1
2BHK 50.31 2 2
Shop 186.67 1 0

 

New documents listed below were uploaded to the Documents section:

  • 2 b Details of encumbrances concerned to Legal
  • 3 b Details of encumbrances concerned to Legal
  • 8 CERSAI details
  • 4 a Details of encumbrances concerned to Finance
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 3 a Details of encumbrances concerned to Finance

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 43 20 35

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 35.89 17 16

 

New documents listed below were uploaded to the Documents section:

  • 10 Disclosure of sold/ booked inventory
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 60
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 2
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 45
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
1 Overall Percentage of Completion of the work done For the entire Building /Wing 45.2

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Conservation, Rain water Harvesting : 10 Before Completion
Electrical Meter Room, Sub-Station, Receiving Station : 0 Before Occupation
Sewerage (Chamber, Lines, Septic Tank , STP) : 10 No STP Proposed

 

New documents listed below were uploaded to the Documents section:

  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

New documents listed below were uploaded to the Documents section:

  • 3 Declaration about Commencement Certificate
  • 3 Commencement Certificates / NA Order for plotted development

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 52
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
1 Overall Percentage of Completion of the work done For the entire Building /Wing 41.2

 

New documents listed below were uploaded to the Documents section:

  • 9 Disclosure of sold/ booked inventory
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [8]
  • Building Plan Approval / NA Order for plotted development [2]
  • CERSAI details [7]
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout) [3]
  • Copy of the legal title report
  • Declaration about Commencement Certificate [2]
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of Interest in Other Real Estate Organizations [2]
  • Disclosure of sold/ booked inventory [8]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [8]
  • Proforma of Allotment letter [2]
  • a Details of encumbrances concerned to Finance
  • b Details of encumbrances concerned to Legal