MH
Mumbai City
P51900030729
RERA ID: P51900030729
Project Name: TwentyFive South -Tower C
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2030-12-31
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Prabhadevi, Yadav Patel Lane, Gnorth-400017, Ward Gnorth, Mumbai City-400025

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
F.P.No 1211 of TPS-IV, Mahim in G/North ward

Boundaries:
Adjoining F P No 1215
Adjoining South TowerN Adjoining North Tower
WE
S
Adjoining F P No 1217

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 594 sq.mt.
Sanctioned Built-up Area: 181 sq.mt.
Recreational Open Space: 6010 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 49
No. of basements: 1
No. of Plinths: 1
No. of Podiums: 8
No. of Stilts: 1
No. of Closed Parking: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
4BHK 3755 to 3782 sq ft 23 19
Others 6228 sq ft 5 2
Project Developer:
TWENTY FIVE SOUTH REALITY LIMITED
Organization Type: Company

Address: Hindustan Mills Compound, Kashinath Dhuri Marg, Patil Wadi, Prabhadevi, Off. Veer Sawarkar Road, Mumbai City-400025

Office Phone: +91 22395 78555


Member details:
Member Name Designation
SUNIL CHANDRAKANT SHAH Director
Praphul Devram Shinde Director
Vandana Paresh Dhanki Director
Sachin Anant Sawant Director


Other Professionals involved:
Professional Name Professional Type
Hubtown Limited Other Professional


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing TwentyFive South - Tower C: A New Residential Landmark in Prabhadevi, Mumbai

TwentyFive South - Tower C is a brand new residential project under development in the heart of Prabhadevi, Mumbai. This project, registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) under ID P51900030729, is set to redefine luxurious living in the city.

Situated at F.P.No 1211 of TPS-IV, Mahim in G/North ward, Tower C occupies a prime location within the TwentyFive South development. The project boasts an impressive 594 sq. meters of land area and is designed as a single tower with 49 sanctioned floors, offering residents breathtaking views of the city.

A Focus on Modern Living:

TwentyFive South - Tower C is meticulously planned to cater to the modern lifestyle. The project boasts a host of amenities, including:

  • A spacious basement: Providing ample storage and parking facilities.
  • A dedicated plinth and podium levels: Enhancing the building’s structural integrity and creating space for elegant lobbies and common areas.
  • Generous open spaces: The project emphasizes open spaces with a total sanctioned recreational open space of 6010 sq. meters, ensuring ample room for leisure and relaxation.
  • Advanced security measures: For the safety and well-being of residents.
  • High-quality construction: Using superior materials and construction techniques to ensure longevity and durability.

A Strategic Location:

The project’s strategic location in Prabhadevi offers unparalleled connectivity. It is conveniently located near:

  • Yadav Patel Lane: A bustling commercial hub with numerous amenities within easy reach.
  • Prabhadevi: A popular residential area known for its excellent infrastructure and vibrant social life.
  • Veer Savarkar Road: Providing quick access to various parts of Mumbai.

A Reliable Developer:

TwentyFive South Realty Limited, a well-established company, is behind this ambitious project. Their commitment to quality, transparency, and timely delivery is reflected in their meticulous planning and execution.

Investment Opportunity:

TwentyFive South - Tower C presents an exceptional opportunity for discerning buyers looking for a premium residential address in Mumbai. With its strategic location, modern amenities, and the promise of a comfortable and luxurious lifestyle, this project is poised to become a landmark in the city’s skyline.

Note: The provided details are based on the information shared. For specific inquiries regarding the project, including pricing, floor plans, and booking details, please contact TwentyFive South Realty Limited directly.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
4BHK 348.88 18 14
4BHK 351.37 3 3
6BHK Duplex 578.61 5 2

 

New documents listed below were uploaded to the Documents section:

  • 24 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 25 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 17
1 Overall Percentage of Completion of the work done For the entire Building /Wing 41.7

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
4BHK 348.88 18 14
4BHK 351.37 3 3
4BHK 351.4 2 2
6BHK Duplex 578.61 5 2

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 11
1 Overall Percentage of Completion of the work done For the entire Building /Wing 41.1

 

New documents listed below were uploaded to the Documents section:

  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Podiums 100
1 X number of Slabs of Super Structure 5
1 Overall Percentage of Completion of the work done For the entire Building /Wing 40.5

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
4BHK 348.88 23 9
6BHK Duplex 578.61 5 0

 

New documents listed below were uploaded to the Documents section:

  • 12 Building Plan Approval / NA Order for plotted development
  • 13 Building Plan Approval / NA Order for plotted development
  • 14 Building Plan Approval / NA Order for plotted development
  • 15 Building Plan Approval / NA Order for plotted development
  • 18 Building Plan Approval / NA Order for plotted development
  • 17 Building Plan Approval / NA Order for plotted development
  • 16 Building Plan Approval / NA Order for plotted development

 

New documents listed below were uploaded to the Documents section:

  • 1 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
4BHK 348.88 21 13
4BHK 351.4 2 2

 

New documents listed below were uploaded to the Documents section:

  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 CERSAI details
  • 23 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 22 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [12]
  • Building Plan Approval / NA Order for plotted development [11]
  • Commencement Certificates / NA Order for plotted development [5]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances [3]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [18]
  • Proforma of Allotment letter [4]