RERA ID: P51900024338
Project Name: ARYAVRAT PROJECT
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-12-31
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2023-12-30).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Dadar West, Sk Bole Road, Gnorth-400028, Ward Gnorth, Mumbai City-400028

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
FP NO 240 TPS IV MAHIM DIVISION

Boundaries:
FP NO 227 TPS IV MAHIM DIVISION
FP NO 242 TPS IV MAHIM DIVISIONN FP NO 239 TPS IV MAHIM DIVISION
WE
S
SK BOLE ROAD

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 3145 sq.mt.
Sanctioned Built-up Area: 0 sq.mt.
Recreational Open Space: 255 sq.mt.
No. of Buildings sanctioned: 2
No. of Floors sanctioned: 37
No. of basements: 4
No. of Open Parking: 4

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 217 to 473 sq ft 18 10
2BHK 499 to 924 sq ft 40 36
3BHK 754 to 1178 sq ft 19 0
4BHK 1607 sq ft 9 0
Project Developer:
M/S Chintamani Land and Housing LLP
Organization Type: Partnership

Address: 60/62, Mirza Street, Mumbai, Mumbai City-400003

Office Phone: +91 22234 45348
Website URL: www.chintamaniestates.com


Member details:
Member Name Designation
Rajiv Anant Shah Partner
Kumar Girdharlal Shah Partner
Kumar Girdharlal Shah Authorized Signatory
Anant Girdharlal Shah Partner


Other Professionals involved:
Professional Name Professional Type
IRANI ARCHIRECTS Architect
Chandrakant Pandeshwar Engineer
D J Shah and Associates Chartered Accountant
ENCOM INFRASTRUCTURE Contractor
ENCOM CONSTEC Contractor
A K CONSTRUCTION Contractor
ECO MEP CONSULTANTS Other Professional


Litigations

Active Litigations related to the project ? Yes

Cases
Court Name Case Number Case Type Petition Name Year Present Status
Bombay High Court 2562 Civil Suit 2019 on board
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Aryavrat: An Exclusive Residential Development in the Heart of Mumbai

Nestled amidst the vibrant cityscape of Mumbai, Aryavrat is an extraordinary residential project that embodies contemporary living and sophisticated elegance. With its prime location in the sought-after neighborhood of Dadar West, this development offers an unmatched blend of convenience, luxury, and tranquility.

Overview

Aryavrat, under the aegis of M/S Chintamani Land and Housing LLP, is a meticulously designed residential project. Boasting a sprawling 3145 square meters of land area, the development comprises two captivating towers that soar 37 stories high.

Location and Connectivity

Aryavrat is strategically situated on SK Bole Road, providing seamless access to major transportation hubs and arterial roads. The Bandra-Worli Sea Link and Mumbai International Airport are just a short drive away, ensuring effortless commuting and connectivity.

Distinctive Amenities

Aryavrat offers an array of world-class amenities to cater to the discerning needs of modern urban dwellers. Residents can indulge in a state-of-the-art gymnasium, a serene swimming pool, a tranquil meditation area, and a vibrant community hall for hosting events and gatherings.

Luxurious Residences

The project features a diverse range of exquisitely appointed residences, ranging from cozy 1BHKs to spacious 4BHKs. Each unit is meticulously crafted with high-quality materials and thoughtful design, ensuring optimal space utilization and breathtaking views of the city skyline.

Investment Opportunity

Aryavrat presents an exceptional investment opportunity with its prime location, premium amenities, and exclusive residential offerings. The project is poised to appreciate in value over time, making it an ideal choice for astute investors seeking a secure and profitable investment.

Project Details

  • RERA ID: P51900024338
  • Proposed Date of Completion: December 2023
  • Extended Date of Completion: December 2024
  • Project Type: Residential
  • Total Plot Area: 3145 square meters
  • Number of Towers: 2
  • Number of Floors: 37
  • Number of Units: 86 (18 1BHKs, 40 2BHKs, 19 3BHKs, 9 4BHKs)

New documents listed below were uploaded to the Documents section:

  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 80

 

New documents listed below were uploaded to the Documents section:

  • 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2024-12-31

 

New documents listed below were uploaded to the Documents section:

  • 2 Proforma of Agreement for sale
  • 1 Proforma of Agreement for sale

 

New documents listed below were uploaded to the Documents section:

  • 1 Disclosure of sold/ booked inventory

 

New documents listed below were uploaded to the Documents section:

  • 2 Details of encumbrances

 

Number of Sanctioned Floors field under Building/Plot Details section updated with new value 37

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 37.16 2 2
1BHK 41.81 7 7
2BHK 46.45 12 12
2BHK 51.1 4 4
2BHK 56.67 18 18
2BHK 60.39 1 1
2BHK 64.38 1 1

 

New documents listed below were uploaded to the Documents section:

  • 23 Building Plan Approval / NA Order for plotted development

 

New documents listed below were uploaded to the Documents section:

  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 95
1 X number of Slabs of Super Structure 97
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 15
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 97
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 95
1 Overall Percentage of Completion of the work done For the entire Building /Wing 68.9
2 X number of Slabs of Super Structure 70
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 65
2 Overall Percentage of Completion of the work done For the entire Building /Wing 43.5

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) [3]
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [16]
  • Building Plan Approval / NA Order for plotted development [22]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) [5]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) [2]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [13]
  • Other [3]
  • Proforma of Allotment letter