P51900022063
RERA ID: P51900022063
Project Name: ‘The Mansion’ By ABIL
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-03-30
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2024-03-30).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Girgaum, N S Patkar Marg, Mumbai City-400007

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
1519

Boundaries:
Partly CS No 1525
Partly CS No 1525 and Partly CS No 1522N Partly CS No 1 of 1519
WE
S
Partly CS No 1 of 1519 and Partly CS No 1520

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 1061 sq.mt.
Sanctioned Built-up Area: 4200 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 31
No. of basements: 1
No. of Plinths: 1
No. of Podiums: 9
No. of Closed Parking: 52

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Others 272 to 1889 sq ft 33 4
Project Developer:
Arindam Developers LLP
Organization Type: Partnership

Address: 33Rd Floor, St Regis, 462 Senapati Bapat Marg, Lower Parel, Phoenix Mills Compound, Mumbai City-400013

Office Phone: +91 22248 88888
Website URL: www.abilgroup.com


Member details:
Member Name Designation
Amit Avinash Bhosale Partner
Avinash Nivrutti Bhosale Partner
Akshay Abhay Bhosale Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
Capacite Infraprojects Ltd Contractor
Umeshchandra K Powar Architect
Supriya Abhijit Mundada Chartered Accountant
Vijay Terse Engineer
Nilam Surve Contractor
Anjali Ghanekar Other Professional


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Navroz Mansion: A New Landmark in Girgaum, Mumbai

Nestled in the heart of Mumbai’s vibrant Girgaum neighborhood, Navroz Mansion by ABIL is a new residential project promising luxurious living in a prime location. With its RERA ID of P51900022063, the project is a testament to transparency and adherence to regulatory standards.

Located on Plot No. 1519, Navroz Mansion boasts a strategic position within Girgaum, bordered by various CS numbers for optimal accessibility and natural light. The project occupies a total plot area of 1061 sq. meters and is set to rise to a height of 24 floors, including a basement, plinth, and 9 podium levels, offering expansive views of the city.

The project is developed by Arindam Developers LLP, a reputable partnership firm with a proven track record in the real estate sector. Their commitment to quality is evident in their choice of materials and meticulous planning, reflected in the sanctioned FSI of 4200 for the project.

Navroz Mansion is poised to become a landmark destination in Girgaum, offering residents an exclusive and comfortable lifestyle. The project promises modern amenities like closed parking for 52 vehicles, strategically planned to ensure convenience for residents.

The developer, ABIL, is known for its commitment to delivering projects on time. While the proposed date of completion is March 30th, 2024, a slightly extended deadline of March 30th, 2025, provides ample time for completion. This transparency in timelines reflects the developer’s dedication to fulfilling their promises.

For potential investors, Navroz Mansion represents an opportunity to invest in a prime location with a proven developer. The project’s strategic location in Girgaum, coupled with its well-planned amenities and adherence to RERA regulations, makes it an attractive prospect for those seeking a luxurious and comfortable lifestyle in the heart of Mumbai.

Please note that the project name has been changed. It will now be known as: “The Mansion” By ABIL

 

Number of Sanctioned Floors field under Building/Plot Details section updated with new value 31

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Fire Protection And Fire Safety Requirements : 80 as per local guidelines NBC 2005 & engg local std
Water Conservation, Rain water Harvesting : 50 individual undergrnd rainwater tank of 35 CUM
Sewerage (Chamber, Lines, Septic Tank , STP) : 75 Daily 85% domestic & 95% flushing water supply STP
Storm Water Drains : 50 Designed for peak rainfall intensity of 100mmperhr

 

New documents listed below were uploaded to the Documents section:

  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Room 25.36 1 0
1 Room 31.12 6 0
1 Room 33.11 6 0
1 Room 46.34 1 0
3 Rooms Hall 134.82 1 0
UNIT NO 2002 31.74 1 0
UNIT NO. 1603 41.83 1 0
UNIT NO. 1702 31.74 1 0
UNIT NO. 1702 2002 31.74 2 0
UNIT NO. 1703 41.83 1 0
UNIT NO. 2003 2103 41.83 2 0
UNIT NO. 2102 2502 31.74 2 1
UNIT NO. 2203 2303 41.83 2 1
UNIT NO. 2301 175.56 1 1
UNIT NO. 2404 46.42 1 1
UNIT NO. 2802 2902 31.74 2 0
UNIT NO. 2803 2903 41.83 2 0

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 58
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
1 Overall Percentage of Completion of the work done For the entire Building /Wing 70.2

 

Please note that the project name has been changed. It will now be known as: Navroz Mansion by ABIL

 

New documents listed below were uploaded to the Documents section:

  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2025-03-30

 

New documents listed below were uploaded to the Documents section:

  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

New documents listed below were uploaded to the Documents section:

  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 2 Declaration in FORM B

 

New documents listed below were uploaded to the Documents section:

  • 4 Commencement Certificates / NA Order for plotted development

 

New documents listed below were uploaded to the Documents section:

  • 7 Disclosure of sold/ booked inventory

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 25
1 Overall Percentage of Completion of the work done For the entire Building /Wing 66.9

 

New documents listed below were uploaded to the Documents section:

  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [16]
  • Building Plan Approval / NA Order for plotted development
  • Commencement Certificates / NA Order for plotted development [3]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory [6]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [16]
  • Other – Legal
  • Proforma of Allotment letter [2]