MH
Mumbai City
P51900017699
RERA ID: P51900017699
Project Name: Hubtown Harmony Retail
Project Type: Commercial
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2023-12-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Matunga East, Bhaudaji Marg, , Mumbai City-400019

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
328/10

Boundaries:
Adjoining Central Railway
Adjoining Central RailwayN Adjoining CS No 336 337
WE
S
Adjoining 12 m wide Road

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 918 sq.mt.
Sanctioned Built-up Area: 606 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 1
No. of Stilts: 1
No. of Closed Parking: 10

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Shop 660 to 1158 sq ft 7 4
Project Developer:
Heet Builders Private Limited
Organization Type: Company

Address: 72 1St Floor, Jr. Shetty Building, Nakoda Street, Pydhonie, Mumbai City-400003

Office Phone: +91 22627 80900


Member details:
Member Name Designation
Kamal Matalia Authorized Signatory
Sunil Chandrakant Shah Director


Other Professionals involved:
Professional Name Professional Type
Naren Kuwadekar & Associates Architect
S.D. Arch Architect
M/s. Aman Construction Contractor
M/s. Meher Foundations & Civil Engineers Pvt. Ltd. Contractor
Rajivan Paramban Engineer
Global Engineering Services (Mr.Vivek Garg ) Other Professional
Hubtown Limited Other Professional


Projects in the state by this developer:
P51900017709 - Hubtown Harmony B Wing - Mumbai City
P51900017699 - Hubtown Harmony Retail - Mumbai City
P51900017558 - Hubtown Harmony A Wing - Mumbai City
P51900000175 - Heavan C Wing - Mumbai City
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Hubtown Harmony Retail: A Prime Commercial Opportunity in Matunga East

Hubtown Harmony Retail, a new commercial project in the bustling locality of Matunga East, Mumbai, offers an exciting investment opportunity for discerning entrepreneurs and businesses. Developed by Heet Builders Private Limited, this project boasts a prime location and a thoughtfully designed layout, making it an ideal choice for retail ventures.

A Strategic Location:

Located at Plot No. 328/10 in Matunga East, the project enjoys excellent connectivity. It is strategically positioned adjacent to a 12m wide road, ensuring easy access for customers. The project’s proximity to the Central Railway line offers further convenience, making it readily accessible for commuters.

Project Highlights:

  • RERA Approved: With a RERA ID of P51900017699, the project adheres to the highest regulatory standards, ensuring transparency and investor confidence.
  • Prime Commercial Space: The project offers a total built-up area of 606 sq.mts, encompassing 7 retail shops ranging in size from 660 to 1158 sq. ft. This allows businesses to choose a space that suits their specific requirements.
  • Convenient Amenities: The project includes 10 closed parking spaces, ensuring convenience for customers and staff.
  • Well-designed Structure: The project comprises a single building with one stilt floor, offering a well-planned layout for optimal utilization of space.
  • Completion Timeline: The project is scheduled for completion by December 30th, 2023, ensuring a timely handover to investors.

A Renowned Developer:

Heet Builders Private Limited, a reputable developer with a proven track record, brings their expertise to Hubtown Harmony Retail. Their commitment to quality construction and timely delivery assures investors of a reliable and secure investment.

Investing in a Vibrant Location:

Matunga East, renowned for its diverse cultural mix and bustling commercial activity, offers a thriving market for retail ventures. This makes Hubtown Harmony Retail an attractive proposition for businesses seeking to establish a foothold in this vibrant area.

Hubtown Harmony Retail presents a compelling opportunity for businesses looking to capitalize on the dynamic commercial landscape of Matunga East. With its prime location, well-planned design, and experienced developer, this project promises a rewarding investment experience.

New documents listed below were uploaded to the Documents section:

  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Solid Waste Management And Disposal : 100 Layout Amenity
Treatment And Disposal Of Sewage And Sullage Water : 100 Layout Amenity
Street Lighting : 90 Layout Amenity
Storm Water Drains : 100 Layout Amenity
Landscaping & Tree Planting : 100 Layout Amenity
Internal Roads & Footpaths : 95 Layout Amenity
Electrical Meter Room, Sub-Station, Receiving Station : 100 Building/Layout Amenity
Sewerage (Chamber, Lines, Septic Tank , STP) : 90 Building/Layout Amenity

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 90
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 79

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Internal Roads & Footpaths : 90 Layout Amenity

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
Shop 61.4 1 1
Shop 61.8 1 0
Shop 63.6 1 1
Shop 64.47 1 0
Shop 76.49 1 0
Shop 91.64 1 1
Shop 107.59 1 1

 

New documents listed below were uploaded to the Documents section:

  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

New documents listed below were uploaded to the Documents section:

  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Building Plan Approval (IOD) [10]
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project) [10]
  • Commencement Certificates / NA Order for plotted development [4]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [8]
  • Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • Proforma of Allotment letter