MH
Pune
P52100026255
RERA ID: P52100026255
Project Name: Metro Life Optima Residences
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-09-27
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2023-09-30).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Next To Indira College Of Commerce And Science, New Pune Mumbai Highway, Tathwade, Mulshi, Pune-411033

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
S. No. 91/2, Plot C

Boundaries:
S No 99 - P
S No 99 - PN 12 Mtr Wide Sanctioned DP Road
WE
S
S No 94 - P

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 5500 sq.mt.
Sanctioned Built-up Area: 11532 sq.mt.
Recreational Open Space: 468 sq.mt.
No. of Buildings sanctioned: 4
No. of Floors sanctioned: 45
No. of basements: 4
No. of Plinths: 4
No. of Podiums: 4
No. of Stilts: 4
No. of Open Parking: 45

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 447 to 536 sq ft 138 100
Shop 291 to 1252 sq ft 61 31
Project Developer:
RAMA SYNERGY SPACES
Organization Type: Partnership

Address: 10Th Floor, Rama Equator, Morwadi, Pimpri, Near Pcmc, Pimpri Chinchawad (M Corp.), Haveli, Pune-411018

Office Phone: +91 20274 73001
Website URL: www.ramagroupindia.com


Member details:
Member Name Designation
RAM UDHARAM PANJABI Partner
MANOJ RAMCHAND PANJABI Partner
RAJKUMAR RAM PANJABI Partner
NARESH RAMCHAND PANJABI Partner
JITENDRA SUNDERDAS PANJABI Partner
MOTI UDHARAM PANJABI Partner
RONAK MOTI PANJABI Partner
GOVIND UDHARAM PANJABI Partner
PIYUSH GOVIND PANJABI Partner
MOTI UDHARAM PANJABI Authorized Signatory
JITENDRA SUNDERDAS PANJABI Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
Vk: Architecture (Vk a) Architect
Amit Bhatt Architects (ABA) Architect
JW Consultants Engineer
CA Madhusudan Jhanwar Chartered Accountant
L. B. Laddha & Co Chartered Accountant
Mukunda Bhunje Other Professional
Pushkaraj Consultancy Other Professional
Abhiyanta Consultants Other Professional


Projects in the state by this developer:
P52100052394 - METRO LIFE ULTIMA RESIDENCES PHASE II - Pune
P52100049419 - Fusion Towers Phase IV - Pune
P52100049215 - FUSION TOWERS PHASE III - Pune
P52100028977 - Celestial City Phase II Building I, J, K - Pune
P52100026255 - Metro Life Optima Residences - Pune
P52100025451 - MELANGE RESIDENCES - PHASE IV - Pune
P52100023984 - Metro Life Maxima Residences Phase II - Pune
P52100022487 - Celestial City Phase II Building A, E, H - Pune
P52100022178 - METRO LIFE MAXIMA RESIDENCES PHASE I - Pune
P52100022156 - Metro Life Bizz Bay - Pune
…and 5 more
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Metro Life Optima Residences: A Premium Residential Oasis in Tathwade

Amidst the burgeoning metropolis of Pune, RAMA SYNERGY SPACES presents Metro Life Optima Residences, a landmark residential development poised to elevate the urban living experience. Registered with RERA ID: P52100026255, this state-of-the-art project embodies excellence in construction and design.

Prime Location and Connectivity

Nestled in the rapidly developing Tathwade neighborhood, Metro Life Optima Residences enjoys an unparalleled location. Its proximity to the New Pune Mumbai Highway and its adjacency to Indira College of Commerce and Science provide easy accessibility to all corners of the city.

Spacious and Well-Appointed Units

The project offers a diverse range of 2BHK apartments and retail shops, catering to the needs of homebuyers and investors alike. Ranging in size from 441 to 1252 square feet, each unit is meticulously crafted with spacious layouts and modern amenities.

Extensive Recreational Amenities

Metro Life Optima Residences boasts an array of recreational amenities designed to enhance the well-being and leisure of its residents. The project features a sprawling 468 square meters of open space, providing ample room for relaxation and recreation.

Construction and Completion Timeline

With a proposed completion date of September 2023, Metro Life Optima Residences is poised to redefine the residential landscape in Pune. The project’s ongoing construction is being closely monitored to ensure adherence to the highest quality standards.

About the Developer

RAMASYN ERGY SPACES, the project’s developer, has a proven track record of delivering exceptional residential and commercial developments throughout the region. This partnership firm has earned a reputation for its commitment to innovation, sustainability, and customer satisfaction.

Financial Credentials

Metro Life Optima Residences is backed by the financial stability of KOTAK MAHINDRA BANK. The project’s financial transparency and adherence to regulatory guidelines provide investors with peace of mind.

Conclusion

Metro Life Optima Residences is not just a residential development; it is a promise of a vibrant and fulfilling lifestyle. Its prime location, spacious units, extensive amenities, and reputable developer make it an unparalleled investment opportunity in the thriving city of Pune. As construction progresses towards completion, this exceptional project is set to become a beacon of urban living, offering its residents a lifetime of comfort, convenience, and exclusivity.

New documents listed below were uploaded to the Documents section:

  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 41.58 6 2
2BHK 43.29 6 4
2BHK 43.92 17 17
2BHK 44.89 3 2
2BHK 46 1 0
2BHK 49.4 24 19
Shop 40.6 4 1
Shop 41.02 4 4
Shop 42.72 4 4
Shop 44.3 6 6
Shop 44.5 3 1
Shop 45.32 6 6
Shop 46.09 3 1

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 41.02 10 0
2BHK 42.72 10 0
2BHK 43.92 20 0
2BHK 44.3 9 0
2BHK 45.32 9 0
2BHK 47.46 7 5
2BHK 47.55 14 13
2BHK 47.91 30 17
2BHK 48.95 4 2
2BHK 49.05 20 17
2BHK 49.4 24 19
2BHK 49.85 6 2
Shop 27.07 3 0
Shop 27.52 1 0
Shop 27.74 2 0
Shop 27.82 2 0
Shop 31.22 2 0
Shop 32.37 1 0
Shop 33.27 1 0
Shop 33.7 2 2
Shop 33.94 7 5
Shop 34.5 1 1
Shop 37.35 1 0
Shop 37.36 1 0
Shop 40.6 4 1
Shop 46 1 0
Shop 49.99 1 0
Shop 65.9 1 0
Shop 81.78 1 0
Shop 91.43 1 0
Shop 103.47 1 0
Shop 106.96 1 0
Shop 116.33 1 0

 

New documents listed below were uploaded to the Documents section:

  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 3 a Details of encumbrances concerned to Finance
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 1 b Details of encumbrances concerned to Legal
  • 4 a Details of encumbrances concerned to Finance
  • 2 b Details of encumbrances concerned to Legal

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Basement(s) and Plinth 90
1 Stilt Floor 90
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 93
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
1 Overall Percentage of Completion of the work done For the entire Building /Wing 63.3
2 X number of Basement(s) and Plinth 90
2 Stilt Floor 88
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 93
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 18
2 Overall Percentage of Completion of the work done For the entire Building /Wing 60.9
3 X number of Basement(s) and Plinth 90
3 Stilt Floor 90
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
3 Overall Percentage of Completion of the work done For the entire Building /Wing 61
4 X number of Basement(s) and Plinth 95
4 Stilt Floor 90
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 95
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 25
4 Overall Percentage of Completion of the work done For the entire Building /Wing 72.5

 

New documents listed below were uploaded to the Documents section:

  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 7 Disclosure of sold/ booked inventory
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 47.46 7 5
2BHK 47.55 14 13
2BHK 49.4 8 6
Shop 33.94 7 5

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 85
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
1 Overall Percentage of Completion of the work done For the entire Building /Wing 53.5
2 Stilt Floor 85
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 35
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
2 Overall Percentage of Completion of the work done For the entire Building /Wing 53.5
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
3 Overall Percentage of Completion of the work done For the entire Building /Wing 54.5
4 X number of Basement(s) and Plinth 85
4 Stilt Floor 85
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
4 Overall Percentage of Completion of the work done For the entire Building /Wing 68

 

New documents listed below were uploaded to the Documents section:

  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 6 Disclosure of sold/ booked inventory
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
1 Overall Percentage of Completion of the work done For the entire Building /Wing 51
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
2 Overall Percentage of Completion of the work done For the entire Building /Wing 49.5
3 X number of Basement(s) and Plinth 85
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 85
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 20
3 Overall Percentage of Completion of the work done For the entire Building /Wing 52
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 85
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
4 Overall Percentage of Completion of the work done For the entire Building /Wing 60.5

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [9]
  • Building Plan Approval / NA Order for plotted development [8]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B [2]
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory [5]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [4]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) [3]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [8]
  • Proforma of Allotment letter