RERA ID: P52100023984
Project Name: Metro Life Maxima Residences Phase II
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-12-24
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2023-12-30).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Next To Indira College Of Commerce And Science, New Pune Mumbai Highway, Tathwade, Mulshi, Pune-411033

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
S No 91/3 to 91/7, 91/7/1 to 91/7/7 Plot B2

Boundaries:
Part of Plot B2 - Future Development
12 M Wide RoadN Part of Plot B2 - Phase I
WE
S
Plot B1

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 5282 sq.mt.
Sanctioned Built-up Area: 8466 sq.mt.
Recreational Open Space: 1656 sq.mt.
No. of Buildings sanctioned: 2
No. of Floors sanctioned: 24
No. of basements: 2
No. of Plinths: 2
No. of Podiums: 2
No. of Stilts: 1
No. of Open Parking: 19

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 550 to 637 sq ft 202 188
3BHK 626 to 636 sq ft 54 51
Shop 272 to 789 sq ft 19 4
Project Developer:
RAMA SYNERGY SPACES
Organization Type: Partnership

Address: 10Th Floor, Rama Equator, Morwadi, Pimpri, Near Pcmc, Pimpri Chinchawad (M Corp.), Haveli, Pune-411018

Office Phone: +91 20274 73001
Website URL: www.ramagroupindia.com


Member details:
Member Name Designation
RAM UDHARAM PANJABI Partner
MANOJ RAMCHAND PANJABI Partner
RAJKUMAR RAM PANJABI Partner
NARESH RAMCHAND PANJABI Partner
JITENDRA SUNDERDAS PANJABI Partner
MOTI UDHARAM PANJABI Partner
RONAK MOTI PANJABI Partner
GOVIND UDHARAM PANJABI Partner
PIYUSH GOVIND PANJABI Partner
MOTI UDHARAM PANJABI Authorized Signatory
JITENDRA SUNDERDAS PANJABI Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
Vk: Architecture (Vk a) Architect
JW Consultants LLP Engineer
CA Madhusudan Jhanwar Chartered Accountant
L. B. Laddha & Co Chartered Accountant
Amit Bhatt Architects (ABA) Other Professional
Pushkaraj Consultancy Other Professional
Poonam Yadav Other Professional
Maddhav Limaye Consulting LLP Contractor
Abhiyanta Electrical Consultants & Engineers Other Professional


Projects in the state by this developer:
P52100052394 - METRO LIFE ULTIMA RESIDENCES PHASE II - Pune
P52100049419 - Fusion Towers Phase IV - Pune
P52100049215 - FUSION TOWERS PHASE III - Pune
P52100028977 - Celestial City Phase II Building I, J, K - Pune
P52100026255 - Metro Life Optima Residences - Pune
P52100025451 - MELANGE RESIDENCES - PHASE IV - Pune
P52100023984 - Metro Life Maxima Residences Phase II - Pune
P52100022487 - Celestial City Phase II Building A, E, H - Pune
P52100022178 - METRO LIFE MAXIMA RESIDENCES PHASE I - Pune
P52100022156 - Metro Life Bizz Bay - Pune
…and 5 more
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Metro Life Maxima Residences Phase II: A Haven of Comfort and Convenience

Nestled amidst the picturesque landscapes of Tathwade, Maharashtra, Metro Life Maxima Residences Phase II is a captivating residential project that seamlessly blends modern aesthetics with everyday comfort. With its imminent completion in 2023, this new project promises a transformative living experience for discerning homebuyers.

Project Highlights

  • RERA Approved: Metro Life Maxima Residences Phase II stands as a testament to transparency and compliance, having been meticulously approved by the Maharashtra Real Estate Regulatory Authority (MahaRERA).
  • Prime Location: Situated conveniently adjacent to Indira College of Commerce and Science on the New Pune Mumbai Highway, the project enjoys excellent connectivity and access to essential amenities.
  • Spacious Living Spaces: The project offers a diverse range of unit types, including 2BHK and 3BHK apartments, as well as spacious shops, catering to the needs of every individual and family.
  • Ample Parking: Residents can rest assured of ample parking space, with the project boasting 19 designated open parking slots for both four-wheelers and two-wheelers.
  • World-Class Amenities: Metro Life Maxima Residences Phase II is not just a place to live; it’s an immersive experience. The project features a host of amenities designed to enhance your comfort and well-being, including two basements, two plinths, and two podiums.

About the Developer

RAM Synergy Spaces, the esteemed developer behind this project, has a legacy of excellence in the real estate industry. With a reputation for innovation and attention to detail, they consistently deliver projects that exceed expectations. Their partnership with Kotak Mahindra Bank provides added assurance of financial stability and project integrity.

Conclusion

Metro Life Maxima Residences Phase II is more than just a residential project; it’s an invitation to a life of comfort, convenience, and effortless elegance. With its prime location, spacious living spaces, and abundance of amenities, this project is poised to become a sought-after address for homebuyers seeking a harmonious balance of urban convenience and tranquility.

New documents listed below were uploaded to the Documents section:

  • 7 Disclosure of sold/ booked inventory
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 56.17 17 16
2BHK 57.5 1 1
2BHK 58.3 12 12
Shop 47.9 1 0

 

New documents listed below were uploaded to the Documents section:

  • 4 a Details of encumbrances concerned to Finance
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 b Details of encumbrances concerned to Legal
  • 3 a Details of encumbrances concerned to Finance
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 2 b Details of encumbrances concerned to Legal

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 51.12 2 0
2BHK 51.4 2 0
2BHK 51.45 4 3
2BHK 51.55 5 5
2BHK 51.62 20 20
2BHK 53.13 4 4
2BHK 53.23 4 4
2BHK 54.39 5 5
2BHK 55.31 4 4
2BHK 56.08 5 5
2BHK 56.09 12 11
2BHK 56.17 17 15
2BHK 56.37 1 1
2BHK 56.48 6 6
2BHK 56.85 4 3
2BHK 56.94 4 3
2BHK 57.04 12 12
2BHK 57.11 4 4
2BHK 57.16 4 3
2BHK 57.25 1 1
2BHK 57.34 1 1
2BHK 57.35 5 5
2BHK 57.5 1 1
2BHK 58.02 14 14
2BHK 58.06 14 14
2BHK 58.12 5 5
2BHK 58.19 2 0
2BHK 58.3 12 12
2BHK 58.82 2 0
2BHK 58.88 11 11
2BHK 58.89 4 4
2BHK 58.98 8 8
2BHK 59.04 1 1
2BHK 59.22 2 2
3BHK 58.22 10 9
3BHK 58.35 11 11
3BHK 58.75 5 5
3BHK 58.76 1 1
3BHK 58.93 10 10
3BHK 59.06 3 1
3BHK 59.07 10 10
3BHK 59.14 4 4
Shop 25.33 1 1
Shop 26.83 1 1
Shop 30.23 1 1
Shop 33.49 1 1
Shop 35.6 1 0
Shop 37.53 1 0
Shop 37.66 1 0
Shop 38.3 1 0
Shop 38.31 1 0
Shop 38.65 1 0
Shop 41.84 1 0
Shop 45.64 1 0
Shop 47.9 1 0
Shop 65.53 1 0
Shop 68.46 1 0
Shop 69.62 1 0
Shop 70.89 1 0
Shop 72.28 1 0
Shop 73.31 1 0

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 70 No septic tank & STP as per PCMC norms & NOC
Storm Water Drains : 70 As per PCMC Norms
Fire Protection And Fire Safety Requirements : 60 As per fire NOC awarded
Internal Roads & Footpaths : 60 As per sanction drawing

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 95
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 20
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 95
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
1 Overall Percentage of Completion of the work done For the entire Building /Wing 74
2 X number of Basement(s) and Plinth 95
2 Stilt Floor 95
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 10
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 97
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 45
2 Overall Percentage of Completion of the work done For the entire Building /Wing 72.2

 

New documents listed below were uploaded to the Documents section:

  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
3BHK 58.76 1 1

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Aggregate area of recreational Open Space : 20 1656.00 sq mtrs (common for all phases)
Electrical Meter Room, Sub-Station, Receiving Station : 75 As per statutory requirements
Water Conservation, Rain water Harvesting : 70 As per PCMC norms
Sewerage (Chamber, Lines, Septic Tank , STP) : 65 No septic tank & STP as per PCMC norms & NOC
Storm Water Drains : 65 As per PCMC Norms
Treatment And Disposal Of Sewage And Sullage Water : 70 STP treated water as per PCMC norms&drainage NOC
Community Buildings : 75 club house common for all phases

 

New documents listed below were uploaded to the Documents section:

  • 6 Disclosure of sold/ booked inventory
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 90
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 25
1 Overall Percentage of Completion of the work done For the entire Building /Wing 67
2 X number of Basement(s) and Plinth 85
2 Stilt Floor 85
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 60
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 25
2 Overall Percentage of Completion of the work done For the entire Building /Wing 60.5

 

New documents listed below were uploaded to the Documents section:

  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 56.09 12 11
2BHK 56.17 17 15

 

New documents listed below were uploaded to the Documents section:

  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Treatment And Disposal Of Sewage And Sullage Water : 65 STP treated water as per PCMC norms&drainage NOC
Community Buildings : 70 club house common for all phases
Storm Water Drains : 50 As per PCMC Norms
Sewerage (Chamber, Lines, Septic Tank , STP) : 50 No septic tank & STP as per PCMC norms & NOC
Aggregate area of recreational Open Space : 10 1656.00 sq mtrs (common for all phases)
Electrical Meter Room, Sub-Station, Receiving Station : 70 As per statutory requirements
Fire Protection And Fire Safety Requirements : 50 As per fire NOC awarded
Water Conservation, Rain water Harvesting : 60 As per PCMC norms

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 92
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 65
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
1 Overall Percentage of Completion of the work done For the entire Building /Wing 62.2
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 35
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
2 Overall Percentage of Completion of the work done For the entire Building /Wing 52

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [8]
  • Building Plan Approval / NA Order for plotted development [24]
  • Commencement Certificates / NA Order for plotted development [3]
  • Copy of Layout Approval (in case of layout) [3]
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B [4]
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory [4]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [3]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [2]
  • Proforma of Allotment letter