MH
Palghar
P99000004423
RERA ID: P99000004423
Project Name: Navkar City Phase II Part 2
Project Type: Others
Project Status: On-Going Project *
* Projects that were already under development in May 2017, when RERA was implemented.
2024-12-29
Extended Date of Completion
The project missed completion date 2 time(s) earlier (2023-12-30, 2018-12-31).
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Naigaon, Naigaon East, Vasai-Virar City (M Corp), Vasai, Palghar-401208

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
Survey No 332 Hissa No 7 and 8 Survey No 333 Hissa No 1 and 2

Boundaries:
20 mtr Wide Road
Survey No 335 Hissa Ni 1 and C Type BldgN Survey No 332 Hissa No 5
WE
S
Survey No 331

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 6404 sq.mt.
Sanctioned Built-up Area: 5411 sq.mt.
Recreational Open Space: 572 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 21
No. of Plinths: 3
No. of Stilts: 3
No. of Open Parking: 24
No. of Closed Parking: 3

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 304 to 502 sq ft 30 30
2BHK 466 to 681 sq ft 72 70
Project Developer:
Navkar Estate and Homes Pvt Ltd
Organization Type: Company

Address: Survey No.332/7, Navkar City, Don Bosco High School Road, Naigaon-East, Near Don Bosco School, Vasai-Virar City (M Corp), Vasai, Palghar-401208

Office Phone: +91 88796 88487


Member details:
Member Name Designation
Laxman Bhikaji Khedkar Managing Director
Suresh Bhavarlal Jain Authorized Signatory
Naresh Chandmal Jain Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
Rajesh RC Architect
Himesh Gupta and Asscociats Architect
CSE Consultant Engineer
Prashant Other Professional
Sheetal Environs Pvt Ltd Other Professional
Rahul Engineers Pvt Ltd Other Professional
New Arch Other Professional


Projects in the state by this developer:
P99000011999 - NAVKAR CITY PHASE I PART 1 - Palghar
P99000011641 - Navkar City Phase III Part 1 - Palghar
P99000009437 - NAVKAR CITY PHASE II PART I - Palghar
P99000007525 - Navkar Tower Part 1 - Palghar
P99000005905 - Navkar City Phase II Part-4 - Palghar
P99000004423 - Navkar City Phase II Part 2 - Palghar
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Navkar City Phase II Part 2, a project currently under development, is a promising residential complex located in the vibrant locality of Naigaon, Vasai. Developed by Navkar Estate and Homes Pvt Ltd, this project offers a unique opportunity to own a spacious and well-designed home in a rapidly growing area.

Project Highlights:

  • RERA Registration: The project is registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) with the ID P99000004423, ensuring transparency and consumer protection.
  • Prime Location: Situated in Naigaon-East, close to Don Bosco School, the project enjoys easy access to key amenities and social infrastructure.
  • Spacious & Well-Designed Homes: The project comprises three buildings, spread across a total plot area of 6404 sq.mts. Each building offers a variety of apartment configurations, catering to diverse family needs.
  • Amenities: Residents will benefit from a range of amenities including open parking spaces (24), closed parking spaces (3), and multiple recreational open spaces.
  • Excellent Connectivity: The project is well connected to the rest of Mumbai Metropolitan Region through road and public transport networks.

Project Details:

  • Project Status: Ongoing Project
  • Revised Proposed Date of Completion: December 30, 2023
  • Extended Date of Completion: December 29, 2024
  • Sanctioned Built-up Area: 5411 sq.mts
  • Total Number of Buildings: 3
  • Number of Floors: 21 (excluding stilts)
  • Total Number of Stilts: 3

Investment Opportunity:

Navkar City Phase II Part 2 presents an excellent investment opportunity for individuals seeking a comfortable and well-equipped home in a thriving neighborhood. With its strategic location, modern amenities, and a reputed developer, the project is poised to offer a rewarding investment experience.

Further Information:

For detailed information about apartment configurations, pricing, and other project specifics, interested individuals are encouraged to contact Navkar Estate and Homes Pvt Ltd directly at 8879688487.

New documents listed below were uploaded to the Documents section:

  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 28.29 12 12
1BHK 28.52 6 6
1BHK 28.67 4 4
2BHK 43.72 7 6
2BHK 60.19 5 4

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 98
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 98
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 98
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 98
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 98
1 Overall Percentage of Completion of the work done For the entire Building /Wing 88.8
2 X number of Slabs of Super Structure 98
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 98
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 98
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 98
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 98
2 Overall Percentage of Completion of the work done For the entire Building /Wing 88.8
3 X number of Slabs of Super Structure 98
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 98
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 98
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 98
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 98
3 Overall Percentage of Completion of the work done For the entire Building /Wing 88.8

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 27.25 12 12
1BHK 27.96 14 14
1BHK 44.05 4 4
1BHK 44.18 2 2
1BHK 46.67 2 2
2BHK 43.33 1 1
2BHK 43.39 5 5
2BHK 43.43 6 6
2BHK 43.72 7 7
2BHK 43.87 7 7
2BHK 44.18 27 27
2BHK 56.21 1 1
2BHK 60.19 5 5
2BHK 60.32 1 1
2BHK 60.34 1 1
2BHK 60.44 1 1
2BHK 60.47 2 2
2BHK 60.8 1 1
2BHK 62.68 1 1
2BHK 62.71 4 4
2BHK 62.83 1 1
2BHK 63.27 1 1

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 98 Work In Progress
Storm Water Drains : 98 Work In Progress
Community Buildings : 98 Work In Progress
Street Lighting : 95 Work In Progress
Landscaping & Tree Planting : 98 Work In Progress
Electrical Meter Room, Sub-Station, Receiving Station : 95 Work In Progress
Fire Protection And Fire Safety Requirements : 95 Work In Progress
Water Conservation, Rain water Harvesting : 95 Work In Progress
Internal Roads & Footpaths : 98 Work In Progress
Outdoor Playing Area with Playing Equipment : 80 Work In Progress
Open Gymnasium : 100 Work In Progress
Multipurpose Court : 95 Work In Progress
Land Development Filling and Levelling : 80 Work Complited
Compound Wall and Main Gate Layout : 35 Work In Progress
Water Supply : 98 Work In Progress
Open Parking : 95 Work In Progress
Aggregate area of recreational Open Space : 95 Work In Progress
Swimming Pool : 95 Work In Progress

 

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2024-12-29

 

New documents listed below were uploaded to the Documents section:

  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 1 Disclosure of sold/ booked inventory
  • 3 Disclosure of sold/ booked inventory
  • 1 CERSAI details
  • 2 CERSAI details
  • 2 Disclosure of sold/ booked inventory
  • 1 Disclosure of Interest in Other Real Estate Organizations
  • 3 Disclosure of Interest in Other Real Estate Organizations
  • 2 Disclosure of Interest in Other Real Estate Organizations
  • 2 Declaration in FORM B
  • 5 Building Plan Approval (IOD)
  • 7 Building Plan Approval (IOD)
  • 6 Building Plan Approval (IOD)
  • 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 4 Building Plan Approval (IOD)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Building Plan Approval (IOD) [3]
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project) [16]
  • Certificates of CA (Form 5) [6]
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project) [22]
  • Commencement Certificates / NA Order for plotted development [7]
  • Copy of Layout Approval (in case of layout) [3]
  • Copy of the legal title report [4]
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • Other [5]
  • Proforma of Agreement for sale
  • Proforma of Allotment letter [6]
  • Status of Formation of Legal Entity (Society/Co Op etc.)