RERA ID: P99000015865
Project Name: NIRVANA ECO HOMES
Project Type: Residential
Project Status: On-Going Project *
* Projects that were already under development in May 2017, when RERA was implemented.
2024-12-30
Revised Proposed Date of Completion
The project missed completion date 1 time(s) earlier (2023-12-31).
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Palghar, High Tec Ind.-401404

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
268

Boundaries:
GUT 189
12 ROADN GUT 270
WE
S
12 M DP ROAD

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 4499 sq.mt.
Sanctioned Built-up Area: 8725 sq.mt.
Recreational Open Space: 1038 sq.mt.
No. of Buildings sanctioned: 4
No. of Floors sanctioned: 18
No. of Plinths: 4
No. of Stilts: 3
No. of Open Parking: 3
No. of Closed Parking: 6

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 0 to 314 sq ft 106 47
1RK 0 to 241 sq ft 14 12
2BHK 0 to 386 sq ft 20 10
Others 847 sq ft 1 0
Shop 154 to 163 sq ft 8 0
Project Developer:
BALAJI CONSTRUCTION CO.
Organization Type: Partnership

Address: Gut No 268, Nirvana Eco Homes, High Tec Ind. Road, Palghar, High Tec Ind.-401404

Office Phone: +91 91814 999240


Member details:
Member Name Designation
MUKESH SHETTY Authorized Signatory
VIRENDRA SOLANKI Partner
NISHEETH TAUNK Partner
MOHD FAROOQUE JATU Partner


Other Professionals involved:
Professional Name Professional Type
SQUAREONE ARCHITECT Architect


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Nirvana Eco Homes: An Opportunity for Sustainable Living in Palghar

Nestled in the tranquil locale of Palghar, Maharashtra, Nirvana Eco Homes offers a unique opportunity for comfortable and sustainable living. Developed by Balaji Construction Co., this on-going residential project boasts a harmonious blend of modern amenities and environmentally conscious design.

A Project with a Vision:

The project, registered with RERA under ID P99000015865, spans across a 4499 sq. m. plot of land in Palghar. Comprised of four buildings, each with 18 sanctioned floors and three stilts, the project promises a spacious living experience. The project initially aimed for completion by December 31st, 2023, but has been revised to December 30th, 2024.

A Spectrum of Options:

Nirvana Eco Homes offers a variety of unit options, catering to diverse needs. From compact 1RK units spanning 241 sq. ft. to spacious 2BHK units reaching 386 sq. ft., the project features 106 1BHK units, 14 1RK units, 20 2BHK units, and a single unit offering 847 sq. ft. of living space. Additionally, 8 shop units ranging from 154 to 163 sq. ft. are available, presenting potential for commercial ventures.

Sustainable Living at its Core:

The project emphasizes sustainability, reflected in the design and amenities. With a generous 1038 sq. m. of recreational open space, residents can enjoy a serene and eco-friendly lifestyle. The project also features 3 open parking spaces and 6 closed parking options for convenience and security.

Investing in a Promising Future:

Nirvana Eco Homes presents an opportunity to invest in a well-planned and sustainably-minded residential project in a rapidly developing area. Located in the Palghar Taluka, the project benefits from the region’s burgeoning growth and proximity to key amenities.

Project Highlights:

  • RERA Registration: P99000015865
  • Project Type: Residential
  • Location: Palghar, Maharashtra
  • Developer: Balaji Construction Co.
  • Unit Options: 1RK, 1BHK, 2BHK, Shops
  • Amenities: Open and Closed Parking, Recreational Open Space

With its diverse unit options, focus on sustainability, and strategically chosen location, Nirvana Eco Homes promises a comfortable and rewarding living experience.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 0 0 0
1BHK 25.7 10 5
1RK 0 0 0
1RK 21.2 4 2
2BHK 0 0 0
HALL 78.7 1 0

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Electrical Meter Room, Sub-Station, Receiving Station : 30 ELECTRIC WORK AS PER MSEDCL
Sewerage (Chamber, Lines, Septic Tank , STP) : 40 SEPTIC TANK
Landscaping & Tree Planting : 75 .

 

New documents listed below were uploaded to the Documents section:

  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)

 

New documents listed below were uploaded to the Documents section:

  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 25.7 6 5
1BHK 25.7 4 0
1BHK 26.45 16 3
1BHK 29.18 20 10
2BHK 35.89 17 9

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Building Plan Approval (IOD) [8]
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project) [7]
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout) [2]
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Proforma of Allotment letter