MH
Nanded
P51100047425
RERA ID: P51100047425
Project Name: GVC SHAGUN CITY V
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-12-31
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Kautha, Gvc Shagun City, Nanded Waghala (M Corp.), Nanded-431603

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
GUT NO 174 S NO 50

Boundaries:
LAND OF SHAGUN BUILDCON IN GUT 174
LAND GUT NO 176 AND 212N LAND GUT NO 228
WE
S
LAND OF BALIRAM KALE IN GUT 174

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 3157 sq.mt.
Sanctioned Built-up Area: 2386 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 17
No. of Floors sanctioned: 34
No. of Plinths: 17
No. of Open Parking: 30

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
4BHK 1233 to 1248 sq ft 4 0
Bungalow 1273 to 1468 sq ft 13 0
Project Developer:
SHAGUN BUILDCON
Organization Type: Partnership

Address: 2-12-74, First Floor Above Gvc Electronics, Subhash Road, Vazirabad, Near Hanuman Temple, Nanded Waghala (M Corp.), Nanded-431601

Office Phone: +91 24622 40004


Member details:
Member Name Designation
GANGAPRASAD RAMESHWAR TOSHNIWAL Partner
PRADEEP GAJANANRAO CHADAWAR Partner
DURGAPASAD RAMESHWAR TOSHNIWAL Partner
PAWAN PADEEP CHADAWAR Partner


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
SHIVAJIRAO GANGARAMJI KALE Individual Revenue Share
DAMAJI GANGARAM KALE Individual Revenue Share
BALAJI GANGARAM KALE Individual Revenue Share


Other Professionals involved:
Professional Name Professional Type
SOURABH S KARANDIKAR Architect
SANDESH PATIL Engineer
CA MAYUR AGARWAL Chartered Accountant


Projects in the state by this developer:
P51100047816 - GVC SHAGUN CITY IV - Nanded
P51100047425 - GVC SHAGUN CITY V - Nanded
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

A New Horizon in Nanded: Introducing GVC Shagun City V

GVC Shagun City V, a brand new residential project by Shagun Buildcon, is set to redefine luxury living in Nanded, Maharashtra. This ambitious development, registered with MahaRERA under ID P51100047425, promises a unique blend of modern comfort and spacious living in a prime location.

The project, located in the Kautha locality of Nanded Waghala (M Corp.), encompasses a total area of 3157 square meters and comprises 17 buildings. Each building boasts a maximum of three floors, offering a total of 34 floors across the entire project. With a sanctioned FSI of 2386, GVC Shagun City V provides ample space for residents to enjoy their living spaces.

The project offers a variety of housing options, catering to diverse needs. Residents can choose from 4BHK apartments ranging from 1233 to 1248 square feet, or opt for the spacious bungalows, ranging from 1273 to 1468 square feet. With 4 apartments and 13 bungalows, there’s a perfect choice for every family.

Beyond the individual units, GVC Shagun City V prioritizes community living. The project offers 30 open parking spaces, ensuring ample parking for residents and visitors alike. The project, while currently under construction, is expected to be completed by December 31st, 2025.

Shagun Buildcon, a reputable partnership firm with a track record in the real estate industry, brings their expertise to this project. Their commitment to quality construction and customer satisfaction is evident in their meticulous planning and execution of GVC Shagun City V.

For those seeking a comfortable, spacious, and well-planned living environment in Nanded, GVC Shagun City V offers a compelling opportunity. Its strategic location, diverse unit options, and developer’s reputation make this project a worthy consideration for discerning homebuyers.

New documents listed below were uploaded to the Documents section:

  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
1 Overall Percentage of Completion of the work done For the entire Building /Wing 62
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
2 Overall Percentage of Completion of the work done For the entire Building /Wing 62
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
3 Overall Percentage of Completion of the work done For the entire Building /Wing 62
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
4 Overall Percentage of Completion of the work done For the entire Building /Wing 62
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
5 Overall Percentage of Completion of the work done For the entire Building /Wing 62
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
6 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
6 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
6 Overall Percentage of Completion of the work done For the entire Building /Wing 62
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
7 Overall Percentage of Completion of the work done For the entire Building /Wing 62
8 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
8 Overall Percentage of Completion of the work done For the entire Building /Wing 62
9 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
9 Overall Percentage of Completion of the work done For the entire Building /Wing 62
10 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
10 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
10 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
10 Overall Percentage of Completion of the work done For the entire Building /Wing 62
11 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
11 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
11 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
11 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 62
12 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
12 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
12 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
12 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
12 Overall Percentage of Completion of the work done For the entire Building /Wing 62
13 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
13 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
13 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
13 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
13 Overall Percentage of Completion of the work done For the entire Building /Wing 62
14 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
14 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
14 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
14 Overall Percentage of Completion of the work done For the entire Building /Wing 62
15 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
15 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
15 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
15 Overall Percentage of Completion of the work done For the entire Building /Wing 62
16 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
16 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
16 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
16 Overall Percentage of Completion of the work done For the entire Building /Wing 62
17 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
17 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
17 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
17 Overall Percentage of Completion of the work done For the entire Building /Wing 62

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Basement(s) and Plinth 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
1 Overall Percentage of Completion of the work done For the entire Building /Wing 53
2 Excavation 100
2 X number of Basement(s) and Plinth 100
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
2 Overall Percentage of Completion of the work done For the entire Building /Wing 53
3 Excavation 100
3 X number of Basement(s) and Plinth 100
3 X number of Slabs of Super Structure 100
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
3 Overall Percentage of Completion of the work done For the entire Building /Wing 53
4 Excavation 100
4 X number of Basement(s) and Plinth 100
4 X number of Slabs of Super Structure 100
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
4 Overall Percentage of Completion of the work done For the entire Building /Wing 53
5 Excavation 100
5 X number of Basement(s) and Plinth 100
5 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
5 Overall Percentage of Completion of the work done For the entire Building /Wing 53
6 Excavation 100
6 X number of Basement(s) and Plinth 100
6 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
6 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
6 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
6 Overall Percentage of Completion of the work done For the entire Building /Wing 53
7 Excavation 100
7 X number of Basement(s) and Plinth 100
7 X number of Slabs of Super Structure 100
7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
7 Overall Percentage of Completion of the work done For the entire Building /Wing 53
8 Excavation 100
8 X number of Basement(s) and Plinth 100
8 X number of Slabs of Super Structure 100
8 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
8 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
8 Overall Percentage of Completion of the work done For the entire Building /Wing 53
9 Excavation 100
9 X number of Basement(s) and Plinth 100
9 X number of Slabs of Super Structure 100
9 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
9 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
9 Overall Percentage of Completion of the work done For the entire Building /Wing 53
10 Excavation 100
10 X number of Basement(s) and Plinth 100
10 X number of Slabs of Super Structure 100
10 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
10 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
10 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
10 Overall Percentage of Completion of the work done For the entire Building /Wing 44
11 Excavation 100
11 X number of Basement(s) and Plinth 100
11 X number of Slabs of Super Structure 100
11 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
11 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
11 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
11 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
11 Overall Percentage of Completion of the work done For the entire Building /Wing 44
12 Excavation 100
12 X number of Basement(s) and Plinth 100
12 X number of Slabs of Super Structure 100
12 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
12 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
12 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
12 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
12 Overall Percentage of Completion of the work done For the entire Building /Wing 44
13 Excavation 100
13 X number of Basement(s) and Plinth 100
13 X number of Slabs of Super Structure 100
13 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
13 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
13 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
13 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
13 Overall Percentage of Completion of the work done For the entire Building /Wing 44
14 Excavation 100
14 X number of Basement(s) and Plinth 100
14 X number of Slabs of Super Structure 100
14 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
14 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
14 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
14 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
14 Overall Percentage of Completion of the work done For the entire Building /Wing 53
15 Excavation 100
15 X number of Basement(s) and Plinth 100
15 X number of Slabs of Super Structure 100
15 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
15 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
15 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
15 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
15 Overall Percentage of Completion of the work done For the entire Building /Wing 53
16 Excavation 100
16 X number of Basement(s) and Plinth 100
16 X number of Slabs of Super Structure 100
16 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
16 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
16 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
16 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
16 Overall Percentage of Completion of the work done For the entire Building /Wing 53
17 Excavation 100
17 X number of Basement(s) and Plinth 100
17 X number of Slabs of Super Structure 100
17 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
17 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
17 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
17 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
17 Overall Percentage of Completion of the work done For the entire Building /Wing 53

 

New documents listed below were uploaded to the Documents section:

  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Building Plan Approval / NA Order for plotted development [14]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Deviation Report with respect to Allotment letter
  • Deviation Report with respect to model copy of Agreement
  • Proforma of Agreement for sale [2]
  • Proforma of Allotment letter [2]
  • a Details of encumbrances concerned to Finance
  • b Details of encumbrances concerned to Legal