RERA ID: P51500034803
Project Name: SIMPLICITY PHASE - I
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-03-31
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2024-03-31).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Fattepur, Jalna Road, Aurangabad-431002

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
GUT NO 14 PART FATTEPUR

Boundaries:
GUT NO 15
COMPOUND WALL AND GUT NO 25N ELECTRICITY TRANSFORMER HOUSE and ROAD
WE
S
ROAD AND INTERNAL GARDEN

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 1622 sq.mt.
Sanctioned Built-up Area: 2184 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 6
No. of Floors sanctioned: 24
No. of Plinths: 6
No. of Stilts: 6
No. of Closed Parking: 6

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 308 sq ft 36 0
1RK 213 sq ft 34 0
Project Developer:
Shreeram Traders and Developers
Organization Type: Others (Prop Prafulkumar Purshottam Agrawal)

Address: Gut No. 62 And 65, Plot No. 3, Cidco Waluj, Golwadi, Near Hotel Prabhu, , Aurangabad-431001

Office Phone: +91 24024 90860


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
ASCENT VENTURES Partnership Revenue Share
RAMNIRANJAN CHATURBHUJ AGRAWAL Individual Revenue Share
VINOD LILADHAR AGRAWAL Individual Revenue Share
MANISH RAMNIRANJAN AGRAWAL Individual Revenue Share


Other Professionals involved:
Professional Name Professional Type
Prasad Kulkarni Architect
n G Karkhane Engineer
LOYA AND MUNDADA Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Simplicity Phase - I: Affordable Housing in Aurangabad

Simplicity Phase - I, a new residential project registered with MahaRERA (ID: P51500034803), offers a unique opportunity for homebuyers seeking affordable and comfortable living in the heart of Aurangabad, Maharashtra. Developed by Shreeram Traders and Developers, this project is designed to cater to the needs of individuals and families seeking convenient and well-planned living spaces.

Located in Fattepur, along the bustling Jalna Road, the project enjoys a strategic location with easy access to essential amenities. The project site, encompassing a total area of 1622 sq. mtrs, is marked by Gut No 14 Part Fattepur and is bordered by key landmarks like the electricity transformer house, a road, Gut No 25, Gut No 15, and an internal garden.

Simplicity Phase - I is set to comprise six buildings with a total of 24 sanctioned floors and 6 stilts. The project offers a range of affordable housing options, including 36 units of 1BHK (308 sq ft) and 34 units of 1RK (213 sq ft). The project is scheduled for completion by March 31st, 2024, offering prospective buyers a timely investment opportunity.

Furthermore, the project offers a number of amenities designed to enhance the quality of living for residents. These include closed parking spaces, ensuring the security and convenience of residents. The project also incorporates six plinth levels, adding to the overall structural stability and aesthetic appeal.

Simplicity Phase - I stands out as an attractive proposition for several reasons. Firstly, the project offers affordable housing options in a prime location, addressing the needs of a large segment of the population. Secondly, the project is backed by a reputable developer, Shreeram Traders and Developers, known for their commitment to quality and timely delivery. Finally, the project boasts a range of amenities, contributing to a comfortable and enjoyable living experience.

With its strategic location, affordable housing options, and commitment to quality, Simplicity Phase - I promises to be a landmark project, transforming the landscape of affordable housing in Aurangabad. Prospective homebuyers are encouraged to explore this unique opportunity and secure their dream home in this promising new development.

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 28.64 36 0
1RK 19.79 34 0

 

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2025-03-31

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90
2 Stilt Floor 100
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 90
3 Stilt Floor 100
3 X number of Slabs of Super Structure 100
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 90
4 Stilt Floor 100
4 X number of Slabs of Super Structure 100
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
4 Overall Percentage of Completion of the work done For the entire Building /Wing 90
5 Stilt Floor 100
5 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
5 Overall Percentage of Completion of the work done For the entire Building /Wing 90
6 Stilt Floor 100
6 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
6 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
6 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
6 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
6 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

New documents listed below were uploaded to the Documents section:

  • 2 Declaration in FORM B
  • 1 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 3 Declaration in FORM B
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [2]
  • Building Plan Approval / NA Order for plotted development [2]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Other [4]
  • Proforma of Allotment letter [2]