MH
Aurangabad
P51500050642
RERA ID: P51500050642
Project Name: Suvidhi Signature
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2027-12-31
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Chikalthana Industrial Area, Midc Road, Aurangabad (M Corp.), Aurangabad-431006

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
Plot No P-86 in MIDC, Chikalthana Industrial Area

Boundaries:
Plot No E 37
MIDC RoadN Plot No E 36A
WE
S
Plot No E 36A

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 6030 sq.mt.
Sanctioned Built-up Area: 9010 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 2
No. of Floors sanctioned: 11
No. of basements: 2
No. of Plinths: 1
No. of Stilts: 1
No. of Closed Parking: 94

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
3BHK 1184 to 1396 sq ft 18 2
4BHK 1546 to 1574 sq ft 8 1
Office 218 to 532 sq ft 87 27
Shop 145 to 526 sq ft 25 5
Showroom 306 to 1196 sq ft 15 5
Project Developer:
Sunder Ajanta Hospitality
Organization Type: Partnership

Address: A-205 Suvidhi Venture A Wing, Space Olympia Building, Sutgirni Chowk, Garkheda, Aurangabad (M Corp.), Aurangabad-431005

Office Phone: +91 98230 22950


Member details:
Member Name Designation
Manoj Kanhayalal Runwal Authorized Signatory
Anita Manoj Runwal Partner
Sachin Subhashchandra Bohara Partner
Leena Sachin Bohara Partner
Deven Shivshankar Mishra Authorized Signatory
Vikas Kantilal Sahuji Partner
Mahendra Manakchand Zambad Partner
Nitin Balkrishna Deshmukh Partner
Divya Gaurav Tapdiya Partner
Rahul Tansukh Zambad Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
AKW Associates Architect
Core Consultants Engineer
Prasanna P Kala and Associates Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Suvidhi Signature: A New Landmark in Aurangabad’s Industrial Hub

Suvidhi Signature, a new real estate project registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) under ID P51500050642, is poised to transform the landscape of Chikalthana Industrial Area in Aurangabad. Developed by Sunder Ajanta Hospitality, a reputable partnership firm, this project offers a diverse range of commercial and residential units, catering to the needs of both businesses and individuals seeking a prime location within the bustling industrial hub.

Located on Plot No. P-86 in MIDC, Chikalthana Industrial Area, Suvidhi Signature enjoys a strategic position within the heart of the industrial belt. The project’s proximity to MIDC Road ensures excellent connectivity, while the surrounding plots (E 36A, E 37) further enhance its accessibility.

The project encompasses a total plot area of 6030 sqmts and comprises two buildings with a sanctioned FSI of 9010. The project offers a range of unit sizes catering to various needs, including 3BHK and 4BHK residential apartments, offices, shops, showrooms, and commercial spaces. These units are designed with modern amenities and layouts, offering a comfortable and functional living and working environment.

Key Project Highlights:

  • Strategic Location: Situated in the heart of Chikalthana Industrial Area, providing excellent connectivity and access to businesses and amenities.
  • Diverse Unit Options: A wide range of unit sizes and types cater to both residential and commercial needs.
  • Modern Design and Amenities: Units are designed with modern amenities and layouts, ensuring a comfortable and functional living and working environment.
  • Two Buildings with Multiple Floors: The project encompasses two buildings with a total of 11 sanctioned floors, offering ample space and a sense of community.
  • Ample Parking: The project provides 94 closed parking spaces, ensuring convenience and security for residents and visitors.
  • Transparency and Regulatory Compliance: Registered with MahaRERA, the project adheres to all regulatory guidelines and provides transparency to investors.

Suvidhi Signature is not just a real estate project; it is an opportunity to invest in a thriving industrial area with the potential for high returns. Whether you’re looking for a spacious and well-designed residential apartment or a strategically located commercial space, Suvidhi Signature offers a unique opportunity to own a piece of Aurangabad’s industrial heart.

Project Details:

  • Project Name: Suvidhi Signature
  • Project Type: Others
  • Project Status: New Project
  • Proposed Date of Completion: December 31, 2027
  • Total Plot/Project Area: 6030 sqmts
  • Total Number of Buildings: 2
  • Sanctioned FSI: 9010
  • Built-up Area as per Proposed FSI: 4000 sqmts
  • Permissible Total FSI: 13010
  • Bank: The Akola Urban Co-op Bank Ltd
  • IFSC Code: TAUB0001028

For further information or to learn more about Suvidhi Signature, please contact:

Sunder Ajanta Hospitality

  • Office Number: 9823022950
  • Address: A-205 Suvidhi Venture A Wing, Space Olympia Building, Sutgirni Chowk, Garkheda, Aurangabad, Maharashtra, 431005.

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 85
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 45
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 65
1 Overall Percentage of Completion of the work done For the entire Building /Wing 73.5
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 35
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 65
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 25
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
2 Overall Percentage of Completion of the work done For the entire Building /Wing 64

 

New documents listed below were uploaded to the Documents section:

  • 5 Disclosure of sold/ booked inventory
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
3BHK 110 7 0
3BHK 126.3 1 0

 

New documents listed below were uploaded to the Documents section:

  • 4 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
3BHK 110 7 0
3BHK 112.05 7 1
3BHK 126.3 1 0
3BHK 127.88 1 1
3BHK T 127.56 1 0
3BHK T 129.7 1 0
4BHK 143.72 4 0
4BHK 146.29 4 1
Office space 20.34 12 4
Office space 21.62 23 5
Office space 25.9 4 3
Office space 25.97 8 3
Office space 27.28 4 3
Office space 31.1 3 0
Office space 41.04 3 0
Office space 41.06 3 0
Office space 43.33 6 1
Office space 43.58 3 0
Office space 43.9 3 3
Office space 45.79 4 2
Office space 49.41 4 1
Office space 49.48 7 2
Shop 13.5 4 0
Shop 13.95 4 0
Shop 19.2 2 1
Shop 19.31 4 2
Shop 24.64 1 0
Shop 24.7 1 0
Shop 25.43 1 0
Shop 25.79 1 0
Shop 26.11 1 1
Shop 26.49 3 1
Shop 29.49 1 0
Shop 35.24 1 0
Shop 48.94 1 0
Showroom 28.52 6 3
Showroom 34.03 1 1
Showroom 34.13 1 1
Showroom 97.5 2 0
Showroom 98.78 1 0
Showroom 102.97 1 0
Showroom 108.44 1 0
Showroom 111.17 2 0

 

New documents listed below were uploaded to the Documents section:

  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 75
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 25
1 Overall Percentage of Completion of the work done For the entire Building /Wing 53.5
2 Stilt Floor 100
2 X number of Slabs of Super Structure 70
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 35
2 Overall Percentage of Completion of the work done For the entire Building /Wing 43

 

New documents listed below were uploaded to the Documents section:

  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 3 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
3BHK 112.05 7 1
3BHK 127.88 1 1
4BHK 146.29 4 1
Office space 20.34 12 4
Office space 21.62 23 5
Office space 25.9 4 3
Office space 25.97 8 3
Office space 27.28 4 3
Office space 43.33 6 1
Office space 43.9 3 3
Office space 45.79 4 2
Office space 49.41 4 1
Office space 49.48 7 2
Shop 19.2 2 1
Shop 19.31 4 2
Shop 26.11 1 1
Shop 26.49 3 1
Showroom 28.52 6 3
Showroom 34.03 1 1
Showroom 34.13 1 1

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 15 Work in progress
Internal Roads & Footpaths : 10 Work in progress

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [3]
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Deviation Report with respect to Allotment letter
  • Deviation Report with respect to model copy of Agreement
  • Disclosure of Interest in Other Real Estate Organizations [2]
  • Disclosure of sold/ booked inventory [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) [2]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [3]
  • Other – Technical [4]
  • Proforma of Agreement for sale
  • Proforma of Allotment letter
  • a Details of encumbrances concerned to Finance [2]
  • b Details of encumbrances concerned to Legal [2]