MH
Aurangabad
P51500032664
RERA ID: P51500032664
Project Name: TITANIUM TRADE CENTER/ TITANIUM RESIDENCY
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2026-10-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Midc Area, Shendra Aurangabad, Shendra Kamangar, Aurangabad-431154

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
PLOT NO P 23 FIVE STAR MIDC SHENDRA AURANGABAD

Boundaries:
PLOT NO A102 A103 A104 A105
PLOT P 22N 30 MTR WIDE ROAD
WE
S
PLOT NO P14 P15 OPEN SPACE

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 10699 sq.mt.
Sanctioned Built-up Area: 16048 sq.mt.
Recreational Open Space: 7395 sq.mt.
No. of Buildings sanctioned: 5
No. of Floors sanctioned: 35
No. of Plinths: 5
No. of Open Parking: 113
No. of Closed Parking: 56

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 536 to 545 sq ft 112 0
Others 122 to 332 sq ft 10 0
Shop 83 to 229 sq ft 368 0
Project Developer:
TITANIUM PRO REALTY LLP
Organization Type: Partnership

Address: Shop No 202, Metrix, Kalda Cornor, Near Milk Diary, Cts No 15854/B/1, Aurangabad (M Corp.), Aurangabad-431001

Office Phone: +91 24023 38288


Member details:
Member Name Designation
SATISH JUGALKISHOR TOTALA Partner
GOPAL KISHANCHAND TANWANI Partner
KAPIL AMRUTLAL MOTWANI Partner
GIRISH SEVAKRAM TOLWANI Partner
PAWAN AMRUTLAL MOTWANI Authorized Signatory
MAHESH SUBHASH SOKIYA Authorized Signatory
AMIT VIJAYKUMAR PATNI Authorized Signatory
GIRDHARILAL LEKHRAJ TANWANI Partner


Other Professionals involved:
Professional Name Professional Type
Ar. Yogesh Zavar Architect
SHRINIVAS LKARANJIKAR Engineer
SACHIN TOTALA AND CO Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Titanium Trade Center/Titanium Residency: A Modern Hub in Aurangabad

Titanium Trade Center/Titanium Residency, a new real estate project in the vibrant city of Aurangabad, promises a dynamic mix of commercial and residential spaces. With a RERA ID of P51500032664, this project, developed by Titanium Pro Realty LLP, is poised to transform the cityscape, offering a unique blend of contemporary living and thriving business opportunities.

Situated strategically in the MIDC Area of Shendra Kamangar, the project boasts a prime location, nestled between a 30-meter wide road and Plot P22 to the west, Plot NO A102 A103 A104 A105 to the north, and Plot NO P14 P15 Open Space to the south. Spanning over 10699 sq. meters, the project encompasses 5 buildings, each rising to 35 floors, offering a total sanctioned built-up area of 16048 sq. meters.

Titanium Trade Center/Titanium Residency prioritizes a balanced lifestyle, featuring a substantial 7395 sq. meters of open recreational space, ensuring a serene and invigorating environment for residents. The project offers a diverse range of unit options, catering to various needs. This includes 112 spacious 2BHK units ranging from 536 to 545 sq. ft., along with 274 offices ranging from 83 to 229 sq. ft., 10 units categorized as “Others” with sizes from 122 to 332 sq. ft., and 94 shops with areas ranging from 87 to 210 sq. ft.

The project also boasts a significant number of parking options, with 113 open parking spaces for both 4-wheelers and 2-wheelers, in addition to 56 closed parking spaces. This caters to the convenience of both residents and office occupants, ensuring seamless access and comfortable parking within the complex.

Titanium Pro Realty LLP, a partnership firm, is behind this ambitious project. Their commitment to quality and timely completion is evident in their meticulous planning and adherence to RERA guidelines. With a projected completion date of October 30th, 2026, Titanium Trade Center/Titanium Residency is set to redefine the landscape of Aurangabad, offering a modern, vibrant, and well-connected space for work, living, and leisure.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
OFFICE SPACE SHOP 12 8 0
OFFICE SPACE SHOP 16.2 4 0
OFFICE SPACE SHOP 17.4 4 0
OFFICE SPACE SHOP 17.7 2 0
OFFICE SPACE SHOP 19.6 28 0
SHOP 12 4 0
SHOP 16.2 2 0
SHOP 19.6 14 0

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 Stilt Floor 70
1 X number of Slabs of Super Structure 70
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 70
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 70
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 35
1 Overall Percentage of Completion of the work done For the entire Building /Wing 65.5
2 Excavation 100
2 X number of Basement(s) and Plinth 100
2 Stilt Floor 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 55
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 75
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 83
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 22
2 Overall Percentage of Completion of the work done For the entire Building /Wing 63.5
3 Excavation 100
3 X number of Basement(s) and Plinth 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 20

 

New documents listed below were uploaded to the Documents section:

  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [2]
  • Building Plan Approval / NA Order for plotted development [11]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report [2]
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [2]
  • Proforma of Allotment letter