MH
Aurangabad
P51500032929
RERA ID: P51500032929
Project Name: Ramkrishna Park
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-12-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Honaji Nagar Harsool, Jatwada Road, Aurangabad (M Corp.), Aurangabad-431001

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
Plot No 4 and free land Gut No 220/1 Honaji Nagar Harsool

Boundaries:
Open Land
Open Plot in Same LayoutN Radhakrishna Nagari
WE
S
Approach Road

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 2313 sq.mt.
Sanctioned Built-up Area: 2429 sq.mt.
Recreational Open Space: 275 sq.mt.
No. of Buildings sanctioned: 5
No. of Floors sanctioned: 15
No. of Plinths: 5

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Bungalow 920 to 1219 sq ft 21 20
Project Developer:
Atkare Sons
Organization Type: Others (AOP)

Address: Office No 4/5, Plot No G-8, Town Centre, Cidco, Aurangabad (M Corp.), Aurangabad-431001




Other Professionals involved:
Professional Name Professional Type
Avinash Pawar Architect
Sameer Sunil Chandvadkar Engineer
Narendra Navandar & Co Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Ramkrishna Park: A New Residential Project in Aurangabad

Ramkrishna Park, a new residential project in the bustling city of Aurangabad, promises a comfortable and convenient lifestyle for its residents. Developed by Atkare Sons, an AOP (Association of Persons), the project is registered with MahaRERA under ID P51500032929, ensuring transparency and adherence to regulatory standards.

Located in Honaji Nagar Harsool, a well-established locality in Aurangabad, Ramkrishna Park enjoys a prime position on Jatwada Road. The project boasts a total plot area of 2313 sqmts and is designed to accommodate 5 buildings, each rising to 15 floors. The project’s strategic location provides easy access to essential amenities, including schools, hospitals, shopping centers, and recreational spaces.

Ramkrishna Park prioritizes its residents’ well-being with a dedicated recreational open space of 275 sqmts, offering a much-needed respite from the urban hustle. The project’s FSI (Floor Space Index) is 2429, resulting in a substantial built-up area that accommodates a variety of apartment configurations to meet diverse needs.

The developers, Atkare Sons, are committed to delivering a high-quality project within the proposed completion date of December 30, 2024. The project is backed by Union Bank of India, providing financial stability and peace of mind for prospective buyers.

Ramkrishna Park offers a unique opportunity to own a well-designed and spacious home in a prime location within Aurangabad. With its carefully planned amenities, modern construction, and commitment to quality, the project is poised to become a sought-after residential destination.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
Bungalow 85.5 1 0
Bungalow 87 1 1

 

New documents listed below were uploaded to the Documents section:

  • 1 Architect’s Certificate on Completion of Project (Form 4)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
Bungalow 85.5 1 0
Bungalow 87 1 1
Bungalow 89.55 1 1
Bungalow 98.95 1 1
Bungalow 105.85 7 7
Bungalow 110.35 8 8
Bungalow 111.7 1 1
Bungalow 113.3 1 1

 

New documents listed below were uploaded to the Documents section:

  • 2 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 3 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 4 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 5 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 6 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 7 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 8 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 90
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 90
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
4 Overall Percentage of Completion of the work done For the entire Building /Wing 90
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
5 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

New documents listed below were uploaded to the Documents section:

  • 8 Disclosure of sold/ booked inventory
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 7 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
1 Overall Percentage of Completion of the work done For the entire Building /Wing 86.5

 

New documents listed below were uploaded to the Documents section:

  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
Bungalow 105.85 7 7
Bungalow 110.35 8 8
Bungalow 111.7 1 1
Bungalow 113.3 1 1
Bungalow 87 1 1
Bungalow 89.55 1 1
Bungalow 98.95 1 1

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Internal Roads & Footpaths : 80 Work in progress
Water Conservation, Rain water Harvesting : 80 Work in progress
Water Supply : 80 Work in progress
Sewerage (Chamber, Lines, Septic Tank , STP) : 90 Work in progress
Street Lighting : 80 Work in progress

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
1 Overall Percentage of Completion of the work done For the entire Building /Wing 85.5
2 Excavation 100
2 X number of Basement(s) and Plinth 100
2 Stilt Floor 100
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
2 Overall Percentage of Completion of the work done For the entire Building /Wing 85.5
3 Excavation 100
3 X number of Basement(s) and Plinth 100
3 Stilt Floor 100
3 X number of Slabs of Super Structure 100
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
3 Overall Percentage of Completion of the work done For the entire Building /Wing 85.5
4 Excavation 100
4 X number of Basement(s) and Plinth 100
4 Stilt Floor 100
4 X number of Slabs of Super Structure 100
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
4 Overall Percentage of Completion of the work done For the entire Building /Wing 85.5
5 Excavation 100
5 X number of Basement(s) and Plinth 100
5 Stilt Floor 100
5 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
5 Overall Percentage of Completion of the work done For the entire Building /Wing 85.5

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [9]
  • Building Plan Approval / NA Order for plotted development [7]
  • CERSAI details [3]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory [7]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) [3]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) [4]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [8]
  • Proforma of Allotment letter [2]