MH
Aurangabad
P51500018801
RERA ID: P51500018801
Project Name: SURYATEJ
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2026-12-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Mitmita, Old Mumbai Highway, Aurangabad (M Corp.), Aurangabad-431005

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
GUT NO 107

Boundaries:
OPEN SPACE
9 MTR DP ROADN NALA
WE
S
60 MTR ROAD

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 3646 sq.mt.
Sanctioned Built-up Area: 4562 sq.mt.
Recreational Open Space: 365 sq.mt.
No. of Buildings sanctioned: 5
No. of Floors sanctioned: 25
No. of Stilts: 5
No. of Closed Parking: 78

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 566 sq ft 78 32
Shop 231 to 350 sq ft 4 2
Project Developer:
SHRIRAJ LABH DEVELOPER
Organization Type: Partnership

Address: 218, Labh Chambers, Station Road, Vedant Nagar, Opp Mtdc, Aurangabad (M Corp.), Aurangabad-431005

Office Phone: +91 24023 54293


Member details:
Member Name Designation
JAYSHREE TUKARAM MAMIDWAR Partner
MADHURI MAHESH LABHSHETWAR Partner
JAYSHREE TUKARAM MAMIDWAR Authorized Signatory


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
OM SAI CONSTRUCTIONS Partnership Area Share
VIJAY RADHAKISHAN VYWAHARE Individual Area Share
SANJAY GULABRAO BHADANE Individual Area Share
PRAKASH NARAYAN BADVE Individual Area Share


Other Professionals involved:
Professional Name Professional Type
GANESH MHAROLKAR Architect
CORE CONSULTANTS Engineer
CA SACHIN JAISWAL Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Embark on a Transformative Residential Journey: Introducing SURYATEJ

Nestled amidst the vibrant city of Aurangabad, SURYATEJ is a captivating residential project that embodies modern living and unparalleled convenience. Registered with RERA ID P51500018801, this new project is meticulously planned to elevate the lifestyle of its residents.

Prime Location and Connectivity:

Situated on Old Mumbai Highway in the coveted locality of MITMITA, SURYATEJ offers seamless connectivity to the city’s major landmarks. Its proximity to 9 MTR DP ROAD and 60 MTR ROAD ensures effortless commuting to educational institutions, shopping malls, hospitals, and entertainment hubs.

Tranquil Surroundings and Ample Open Spaces:

The thoughtfully designed layout of SURYATEJ features a spacious plot area of 3646 square meters, providing ample breathing space for its residents. Lush green open spaces and a recreational area spanning 365 square meters create a serene and rejuvenating environment.

State-of-the-Art Amenities:

SURYATEJ is adorned with a host of amenities that enhance the living experience. Residents can indulge in various activities and conveniences, including:

  • 78 closed parking spaces for secure vehicle storage
  • 25 floors with 5 stilts, offering a wide range of floor options
  • Essential services such as a power backup and dedicated security system

Living Spaces Tailored to Your Needs:

SURYATEJ offers a diverse range of living spaces to cater to different preferences and family sizes. The project features:

  • 78 spacious 2BHK apartments with an area of 566 square feet each
  • 4 meticulously designed shops ranging from 231 to 350 square feet

Exceptional Partnership and Financial Security:

The project is spearheaded by SHRIRAJ LABH DEVELOPER, a renowned partnership with a proven track record in the real estate industry. The financial security of the project is further strengthened by the involvement of SBI, a leading banking institution.

With its strategic location, modern amenities, and commitment to quality, SURYATEJ is poised to become a landmark in contemporary residential living. This project offers an unparalleled opportunity to invest in your dream home, where comfort, convenience, and tranquility converge.

New documents listed below were uploaded to the Documents section:

  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • 1 Proforma of Agreement for sale
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 1 b Details of encumbrances concerned to Legal
  • 1 Other – Finance
  • 1 Deviation Report with respect to Allotment letter
  • 1 Deviation Report with respect to model copy of Agreement
  • 1 Declaration about Commencement Certificate
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • 2 a Details of encumbrances concerned to Finance
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 1 CERSAI details
  • 1 Disclosure of Interest in Other Real Estate Organizations
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)

 

There are additions/modifications under Professionals section

Professional Name Professional Type
CA SACHIN JAISWAL Chartered Accountant

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2 BHK 52.66 78 32
SHOP 21.49 2 1
SHOP 32.52 2 1

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90
2 Excavation 100
2 X number of Basement(s) and Plinth 100
2 Stilt Floor 100
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 90
3 Excavation 100
3 X number of Basement(s) and Plinth 100
3 Stilt Floor 100
3 X number of Slabs of Super Structure 100
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 90
4 Excavation 100
4 X number of Basement(s) and Plinth 100
4 Stilt Floor 100
4 X number of Slabs of Super Structure 100
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
4 Overall Percentage of Completion of the work done For the entire Building /Wing 90
5 Excavation 100
5 X number of Basement(s) and Plinth 100
5 Stilt Floor 100
5 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
5 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Conservation, Rain water Harvesting : 100
Aggregate area of recreational Open Space : 100
Sewerage (Chamber, Lines, Septic Tank , STP) : 100
Landscaping & Tree Planting : 100

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 78 32 100

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Building Plan Approval (IOD)
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Form 2A
  • Other
  • Proforma of Allotment letter