MH
Aurangabad
P51500005118
RERA ID: P51500005118
Project Name: Mulay I Square
Project Type: Commercial
Project Status: On-Going Project *
* Projects that were already under development in May 2017, when RERA was implemented.
2026-03-31
Extended Date of Completion
The project missed completion date 2 time(s) earlier (2023-03-30, 2016-05-04).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
K Sector, Near Endurance Plant, Jogeshwari Road, , Gangapur, Aurangabad-431133

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
K 232 K233

Boundaries:
25 MW MIDC Road
60 MW MIDC RoadN Plot No K230 K231
WE
S
Plot No K235 K236 K237

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 5216 sq.mt.
Sanctioned Built-up Area: 14850 sq.mt.
Recreational Open Space: 18119 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 8
No. of basements: 1
No. of Plinths: 3
No. of Closed Parking: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Shop 243 to 2049 sq ft 179 10
Project Developer:
Gangamai Industries and constructions Limited AND Nirman Constructions JV
Organization Type: Partnership

Address: Second Floor, Tapadia Terraces, Adalat Road, Front Of District Court, Aurangabad (M Corp.), Aurangabad-431001

Office Phone: +91 24023 38732


Member details:
Member Name Designation
Ajeet Madhukar Mulay Authorized Signatory
Ranjeet Padmakar Mulay Authorized Signatory
Gangamai Industries and Construction Limited Partner
Nirmangold Structures Private Limited Partner


Other Professionals involved:
Professional Name Professional Type
NirmanGold Structures Pvt Ltd Contractor
Sudhir P Kulkarni Architect
Kaustubh Vijaykumar Mande Engineer
Mohammed Ismail Plan Well Consultants Engineer
R O Heda & Co Chartered Accountant
Nikhil N Loya Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Mulay I Square: A Commercial Landmark in the Heart of Aurangabad

Nestled in the vibrant city of Aurangabad, Mulay I Square is a prestigious commercial project that caters to the growing business needs of this dynamic region. With its prime location, exceptional amenities, and meticulously designed units, this project is poised to become the preferred destination for discerning investors and businesses alike.

Registered with RERA under ID P51500005118, Mulay I Square boasts a sprawling plot area of 5216 square meters, strategically situated on K Sector, Near Endurance Plant. Bounded by Plot Nos. K230 and K231 to the east, 60 MW MIDC Road to the west, 25 MW MIDC Road to the north, and Plot Nos. K235, K236, and K237 to the south, the project enjoys excellent connectivity and visibility.

Envisioned as a commercial hub, Mulay I Square comprises three meticulously planned buildings with eight sanctioned floors each. The project’s ample recreational open space of 18119 square meters provides a serene and comfortable environment for businesses and visitors alike.

The project has been developed by the esteemed joint venture of Gangamai Industries and constructions Limited and Nirman Constructions JV, renowned for their commitment to quality and innovation in the real estate sector. The firm’s expertise is evident in every aspect of Mulay I Square, from the premium materials used in construction to the thoughtful design that maximizes functionality and aesthetics.

Mulay I Square offers a wide range of units to cater to diverse business requirements. The project houses 179 commercial shops ranging in size from 243 square feet to 2049 square feet. Each unit is designed to provide ample natural light and ventilation, creating a conducive and inspiring work environment.

The project’s amenities are a testament to its commitment to providing a comprehensive and convenient business experience. Mulay I Square boasts a secure closed parking area, ensuring the safety and convenience of occupants. The project’s modern infrastructure, including high-speed elevators and advanced security systems, further enhances its appeal to businesses seeking a reliable and efficient workplace.

With its completion revised to 2023-03-30 and an extended date of completion set for 2026-03-31, Mulay I Square is poised to emerge as a landmark commercial destination in Aurangabad. Its prime location, exceptional amenities, and thoughtfully designed units make it an ideal investment for businesses looking to establish a thriving presence in this dynamic city.

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2026-03-31

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Electrical Meter Room, Sub-Station, Receiving Station : 20 Ongoing
Internal Roads & Footpaths : 20 Ongoing
Water Conservation, Rain water Harvesting : 20 Ongoing
Energy management : 20 Ongoing
Fire Protection And Fire Safety Requirements : 20 Ongoing
Water Supply : 20 Ongoing
Storm Water Drains : 20 Ongoing
Sewerage (Chamber, Lines, Septic Tank , STP) : 20 Ongoing
Landscaping & Tree Planting : 20 Ongoing
Street Lighting : 50 Ongoing
Treatment And Disposal Of Sewage And Sullage Water : 20 Ongoing
Solid Waste Management And Disposal : 20 Ongoing

 

New documents listed below were uploaded to the Documents section:

  • 1 Declaration about Commencement Certificate
  • 1 Deviation Report with respect to model copy of Agreement
  • 1 Proforma of Agreement for sale
  • 2 Proforma of Allotment letter
  • 1 Deviation Report with respect to Allotment letter
  • 1 b Details of encumbrances concerned to Legal
  • 1 CERSAI details
  • 1 Disclosure of Interest in Other Real Estate Organizations
  • 1 Disclosure of sold/ booked inventory
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 2 a Details of encumbrances concerned to Finance
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 3 Declaration in FORM B

 

There are additions/modifications under Professionals section

Professional Name Professional Type
Nikhil N Loya Chartered Accountant
R O Heda & Co Chartered Accountant
Kaustubh Vijaykumar Mande Engineer

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 96
1 Overall Percentage of Completion of the work done For the entire Building /Wing 50.2
2 X number of Basement(s) and Plinth 100
2 X number of Slabs of Super Structure 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 20
3 X number of Basement(s) and Plinth 100
3 X number of Slabs of Super Structure 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 20

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Building Plan Approval (IOD)
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • Certificates of CA (Form 5)
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project) [2]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B [2]
  • Details of encumbrances
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Other
  • Proforma of Allotment letter