1 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
1 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
1 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
1 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
2 |
Excavation |
60 |
2 |
X number of Basement(s) and Plinth |
60 |
2 |
X number of Slabs of Super Structure |
50 |
2 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
50 |
2 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
50 |
2 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
50 |
2 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
50 |
2 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
50 |
2 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
42 |
3 |
Excavation |
60 |
3 |
X number of Basement(s) and Plinth |
60 |
3 |
X number of Slabs of Super Structure |
60 |
3 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
60 |
3 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
60 |
3 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
60 |
3 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
60 |
3 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
60 |
3 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
48 |
4 |
Excavation |
45 |
4 |
X number of Basement(s) and Plinth |
45 |
4 |
X number of Slabs of Super Structure |
35 |
4 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
35 |
4 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
35 |
4 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
35 |
4 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
35 |
4 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
35 |
4 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
30 |
5 |
Excavation |
75 |
5 |
X number of Basement(s) and Plinth |
75 |
5 |
X number of Slabs of Super Structure |
80 |
5 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
80 |
5 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
80 |
5 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
80 |
5 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
80 |
5 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
85 |
5 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
63.5 |