MH
Wardha
P50400046904
RERA ID: P50400046904
Project Name: DHP TOWN
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2026-03-31
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Gram Panchayat Nalwadi, Nalwadi, Wardha (M Cl), Wardha-442001

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
FIELD SURVEY NO. 96/1, OUT OF PLOT NO AMENITY 1 MOUZA NO 73 PH NO.22

Boundaries:
SURVEY NO 58 AND 59
9 MTRS LAYOUT ROADN FIELD SURVEY NO 56
WE
S
9 MTRS LAYOUT ROAD

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 2141 sq.mt.
Sanctioned Built-up Area: 5385 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 7
No. of Plinths: 1
No. of Stilts: 1
No. of Closed Parking: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 649 to 654 sq ft 42 0
3BHK 891 sq ft 14 0
Project Developer:
DHP INFRAVENTURES
Organization Type: Partnership

Address: 0, Swami, Samarth Nagar, Muraka Layout, Wardha (M Cl), Wardha-442001

Office Phone: +91 84216 33517


Member details:
Member Name Designation
FIROZ FARUK HUSAIN Partner
VINOD PURUSHOTTAM DHOBALE Partner
KESHAVBHAI JADAVBHAI PAGHADAL Partner


Other Professionals involved:
Professional Name Professional Type
Lokesh Kadu Architect
RAJU DHOBLE Engineer
ANKIT TALREJA Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

DHP Town: A New Residential Project in Wardha, Maharashtra

DHP Town, a new residential project by DHP INFRAVENTURES, is set to rise in the serene locality of GRAM PANCHAYAT NALWADI, Wardha, Maharashtra. This project, registered with MahaRERA under ID P50400046904, promises to provide a comfortable and convenient living experience to its residents.

A Well-Planned Development:

DHP Town is meticulously planned across a total area of 2141 square meters. The project comprises a single building with seven floors above a single stilt floor, offering a total sanctioned built-up area of 5385 square meters. This well-designed layout ensures efficient utilization of space, maximizing the benefits for residents.

Convenient Location and Amenities:

Situated in the tranquil village of Wardha (M Cl), DHP Town enjoys a prime location in NALWADI, easily accessible via the 9 MTRS LAYOUT ROAD. The project’s proximity to essential amenities like schools, hospitals, and markets ensures a comfortable and convenient lifestyle for residents.

Spacious and Functional Units:

DHP Town offers a range of apartment options catering to diverse needs. The project features 42 units of 2BHK apartments, each spanning between 649 and 654 square feet, and 14 units of 3BHK apartments measuring 891 square feet. These thoughtfully designed apartments provide ample space for families and individuals seeking comfortable and functional living spaces.

A Promising Investment Opportunity:

With its strategic location, well-planned layout, and convenient amenities, DHP Town presents an attractive investment opportunity. The project’s anticipated completion date is March 31st, 2026, providing potential investors with a promising return on their investment.

Transparency and Reliability:

DHP INFRAVENTURES, a partnership firm committed to quality and transparency, ensures the project adheres to all regulations and guidelines set by MahaRERA. With no reported litigations and a transparent financial model, DHP Town offers a secure and reliable investment option.

Conclusion:

DHP Town offers a unique blend of comfortable living, strategic location, and a commitment to quality. The project promises to redefine modern living in Wardha, providing a serene and convenient environment for its residents. With its attractive amenities, spacious apartments, and a transparent development process, DHP Town is an investment opportunity worth considering for those seeking a comfortable and secure living experience.

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 15
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 75
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 42
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
1 Overall Percentage of Completion of the work done For the entire Building /Wing 61.7

 

New documents listed below were uploaded to the Documents section:

  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Supply : 18 BOREWELL/ CORPORATION
Electrical Meter Room, Sub-Station, Receiving Station : 12 METER PANEL BOARD SHALL BE PROVIDED
Sewerage (Chamber, Lines, Septic Tank , STP) : 35 AS PER SANCIONED PLAN
Storm Water Drains : 15 AS PER SANCTIONED PLAN

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Electrical Meter Room, Sub-Station, Receiving Station : 10 METER PANEL BOARD SHALL BE PROVIDED
Water Supply : 12 BOREWELL/ CORPORATION
Storm Water Drains : 10 AS PER SANCTIONED PLAN
Sewerage (Chamber, Lines, Septic Tank , STP) : 20 AS PER SANCIONED PLAN

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 62
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 10
1 Overall Percentage of Completion of the work done For the entire Building /Wing 53.2

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 52
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 2
1 Overall Percentage of Completion of the work done For the entire Building /Wing 50.4

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Electrical Meter Room, Sub-Station, Receiving Station : 5 METER PANEL BOARD SHALL BE PROVIDED
Water Supply : 5 BOREWELL/ CORPORATION
Sewerage (Chamber, Lines, Septic Tank , STP) : 10 AS PER SANCIONED PLAN
Storm Water Drains : 7 AS PER SANCTIONED PLAN

 

New documents listed below were uploaded to the Documents section:

  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [5]
  • Building Plan Approval / NA Order for plotted development [2]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Deviation Report with respect to Allotment letter
  • Deviation Report with respect to model copy of Agreement
  • Disclosure of sold/ booked inventory [5]
  • Proforma of Allotment letter [2]
  • a Details of encumbrances concerned to Finance
  • b Details of encumbrances concerned to Legal