MH
Solapur
P52600033486
RERA ID: P52600033486
Project Name: Harikrupa residency
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-12-31
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Lokhande Vasti, Pune Pandharpur Highway, Wakhari, Pandharpur, Solapur-413304

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
410/2/B/1

Boundaries:
Gat no 410 1A 1D
Gat no 410 2 2B 2AN Gat No 410 2 3
WE
S
Gat no 410 2 B 2

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 8100 sq.mt.
Sanctioned Built-up Area: 600 sq.mt.
Recreational Open Space: 832 sq.mt.
No. of Buildings sanctioned: 35
No. of Floors sanctioned: 60
No. of Plinths: 35
No. of Open Parking: 35

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 435 to 438 sq ft 12 8
2BHK 665 to 904 sq ft 19 11
3BHK 958 sq ft 2 2
Project Developer:
Shri Samarth Construction
Organization Type: Partnership

Address: 18, Uday, Link Road, Unnati Residency, Behind Mangalwedhekar Nagar, Isbavi, Pandharpur, Solapur-413304

Office Phone: +91 21862 23567


Member details:
Member Name Designation
amit arvind shirgaonkar Partner
shashikant jaysing sutar Partner
sachin Uday Pandharpurkar Partner


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
Anuradha Balkrishna Warudkar Individual Area Share


Other Professionals involved:
Professional Name Professional Type
Khamitkar & Associates Architect
sanjeev s kothadiya & associates Chartered Accountant
Parvez Shabbir Shaikh Engineer
SK Consultants & Engineers Engineer
Rutuja Narsingh & Associates Chartered Accountant
RERA Easy Other Professional


Projects in the state by this developer:
P52600050906 - Harikrupa Heights - Solapur
P52600033486 - Harikrupa residency - Solapur
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

A New Chapter in Residential Living: Introducing Harikrupa Residency

Harikrupa Residency, a new residential project nestled in the serene village of Wakhari, Pandharpur, offers an unparalleled opportunity for a tranquil and modern lifestyle. Developed by Shri Samarth Construction, a renowned partnership firm with a proven track record, the project promises to deliver comfortable and well-designed homes within a thriving community.

Location and Accessibility:

Strategically located on the Pune-Pandharpur highway, Harikrupa Residency offers easy access to essential amenities and services. The project is situated in the Lokhande Vasti locality, known for its peaceful ambience and close proximity to the bustling town of Pandharpur.

Project Overview:

Spanning across a sprawling 8100 sq. meters, Harikrupa Residency features a total of 35 proposed buildings, of which 10 have been sanctioned for construction. The project boasts an impressive 832 sq. meters of dedicated recreational open space, ensuring a serene and green environment for residents. With a sanctioned FSI of 600, the project promises well-planned and efficient utilization of space, maximizing comfort and functionality.

Amenities and Features:

Harikrupa Residency provides a range of amenities designed to enhance the living experience, including:

  • Spacious and Well-Designed Apartments: The project offers a variety of apartment sizes to cater to diverse needs.
  • Recreational Open Space: The project provides ample space for relaxation and recreation, fostering a sense of community and well-being.
  • Open Parking: With 35 designated parking spaces, residents can enjoy the convenience of secure and ample parking.
  • Quality Construction: Developed by Shri Samarth Construction, the project promises robust construction and high-quality materials.

Investment Opportunity:

Harikrupa Residency presents an excellent investment opportunity for those seeking a well-planned and affordable residential project in a promising location. With its strategic location, modern amenities, and commitment to quality, the project offers a desirable living experience and the potential for strong capital appreciation.

Project Details:

  • RERA ID: P52600033486
  • Project Name: Harikrupa Residency
  • Project Status: New Project
  • Proposed Date of Completion: 31st December 2025
  • Project Type: Residential

For more information and to explore this exciting investment opportunity, please contact Shri Samarth Construction at 2186223567.

Note: This essay provides a brief overview of the project. It is important to consult the official RERA website and the developer for detailed information and updates regarding the project.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 62.88 9 7

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
15 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
15 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
15 Overall Percentage of Completion of the work done For the entire Building /Wing 70

 

New documents listed below were uploaded to the Documents section:

  • 1 Architect’s Certificate on Completion of Project (Form 4)

 

Firm Details section updated for field(s) as below:

Field updated New value
Number of Sanctioned Building out of Above Proposed Count Applied for this Registration 35
Proposed But Not Sanctioned Buildings Count 0

 

New documents listed below were uploaded to the Documents section:

  • 3 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 2 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 40.42 6 2
1BHK 40.74 6 6
2BHK 61.8 1 0
2BHK 62.88 9 7
2BHK 62.92 4 1
2BHK 67.86 2 0
2BHK 73.68 1 1
2BHK 77.31 1 1
2BHK 84.03 1 1
3BHK 89.01 2 2

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Street Lighting : 100 Completed
Internal Roads & Footpaths : 60 w.b.m roads
Water Conservation, Rain water Harvesting : 100 Completed
Water Supply : 100 Completed
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 Completed

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 80
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 80
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 80
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
4 Overall Percentage of Completion of the work done For the entire Building /Wing 80
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
5 Overall Percentage of Completion of the work done For the entire Building /Wing 80
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
6 Overall Percentage of Completion of the work done For the entire Building /Wing 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
7 Overall Percentage of Completion of the work done For the entire Building /Wing 80
8 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Overall Percentage of Completion of the work done For the entire Building /Wing 80
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
9 Overall Percentage of Completion of the work done For the entire Building /Wing 70
10 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
10 Overall Percentage of Completion of the work done For the entire Building /Wing 80
11 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
12 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
12 Overall Percentage of Completion of the work done For the entire Building /Wing 80
13 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
13 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
13 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
13 Overall Percentage of Completion of the work done For the entire Building /Wing 80
14 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
14 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
14 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
14 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
14 Overall Percentage of Completion of the work done For the entire Building /Wing 80
16 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
16 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
16 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
16 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
16 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
16 Overall Percentage of Completion of the work done For the entire Building /Wing 80
17 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
17 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
17 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
17 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
17 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
17 Overall Percentage of Completion of the work done For the entire Building /Wing 80
18 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
18 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
18 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
18 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
18 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
18 Overall Percentage of Completion of the work done For the entire Building /Wing 80
19 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
19 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
19 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
19 Overall Percentage of Completion of the work done For the entire Building /Wing 80
20 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
20 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
20 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
20 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
20 Overall Percentage of Completion of the work done For the entire Building /Wing 80
21 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
21 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
21 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
21 Overall Percentage of Completion of the work done For the entire Building /Wing 80
22 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
22 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
22 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
22 Overall Percentage of Completion of the work done For the entire Building /Wing 80
23 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
23 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
23 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
23 Overall Percentage of Completion of the work done For the entire Building /Wing 80
24 X number of Slabs of Super Structure 100
24 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
24 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
24 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
24 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
24 Overall Percentage of Completion of the work done For the entire Building /Wing 80
25 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
25 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
25 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
25 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
25 Overall Percentage of Completion of the work done For the entire Building /Wing 80
26 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
26 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
26 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
26 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
26 Overall Percentage of Completion of the work done For the entire Building /Wing 80
27 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
27 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
27 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
27 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
27 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
27 Overall Percentage of Completion of the work done For the entire Building /Wing 80
28 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
28 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
28 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
28 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
28 Overall Percentage of Completion of the work done For the entire Building /Wing 80
29 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
29 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
29 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
29 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
29 Overall Percentage of Completion of the work done For the entire Building /Wing 80
30 X number of Slabs of Super Structure 100
30 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
30 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
30 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
30 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
30 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
30 Overall Percentage of Completion of the work done For the entire Building /Wing 80
31 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
31 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
31 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
31 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
31 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
31 Overall Percentage of Completion of the work done For the entire Building /Wing 80
32 X number of Slabs of Super Structure 100
32 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
32 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
32 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
32 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
32 Overall Percentage of Completion of the work done For the entire Building /Wing 80
33 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
33 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
33 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
33 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
33 Overall Percentage of Completion of the work done For the entire Building /Wing 80
34 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
34 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
34 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
34 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
34 Overall Percentage of Completion of the work done For the entire Building /Wing 80
35 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
35 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
35 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
35 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
35 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
35 Overall Percentage of Completion of the work done For the entire Building /Wing 80

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 40.42 6 2
1BHK 40.74 6 6
2BHK 62.88 11 9
2BHK 84.03 1 1

 

New documents listed below were uploaded to the Documents section:

  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) [2]
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) [3]
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [8]
  • Building Plan Approval / NA Order for plotted development [35]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development [35]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report [3]
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) [2]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [8]
  • Other [10]
  • Proforma of Allotment letter [2]