1 |
Excavation |
100 |
1 |
X number of Basement(s) and Plinth |
100 |
1 |
X number of Slabs of Super Structure |
100 |
1 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
1 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
1 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
1 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
1 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
1 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
2 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
2 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
2 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
2 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
2 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
2 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
3 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
3 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
3 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
3 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
3 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
3 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
4 |
Excavation |
100 |
4 |
X number of Basement(s) and Plinth |
100 |
4 |
X number of Slabs of Super Structure |
100 |
4 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
4 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
4 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
4 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
4 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
4 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
5 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
5 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
5 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
5 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
5 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
5 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
6 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
6 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
6 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
6 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
6 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
6 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
7 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
7 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
7 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
7 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
7 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
7 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
8 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
8 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
8 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
8 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
8 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
8 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
9 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
9 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
9 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
9 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
9 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
9 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
10 |
X number of Basement(s) and Plinth |
100 |
10 |
X number of Slabs of Super Structure |
100 |
10 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
10 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
10 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
10 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
10 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
10 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
11 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
11 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
11 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
11 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
11 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
11 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
12 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
12 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
12 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
12 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
12 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
12 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
13 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
13 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
13 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
13 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
13 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
13 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
14 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
14 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
14 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
14 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
14 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
14 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
15 |
Excavation |
100 |
15 |
X number of Basement(s) and Plinth |
100 |
15 |
X number of Slabs of Super Structure |
100 |
15 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
15 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
15 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
15 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
15 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
15 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
16 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
16 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
16 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
16 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
16 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
16 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
17 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
17 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
17 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
17 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
17 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
17 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
18 |
X number of Basement(s) and Plinth |
100 |
18 |
X number of Slabs of Super Structure |
100 |
18 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
18 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
18 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
18 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
18 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
18 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
19 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
19 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
19 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
19 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
19 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
19 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
20 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
20 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
20 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
20 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
20 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
20 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
21 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
21 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
21 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
21 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
21 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
21 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
22 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
22 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
22 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
22 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
22 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
22 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
23 |
X number of Basement(s) and Plinth |
100 |
23 |
X number of Slabs of Super Structure |
100 |
23 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
23 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
23 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
23 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
23 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
23 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
24 |
X number of Basement(s) and Plinth |
100 |
24 |
X number of Slabs of Super Structure |
100 |
24 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
24 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
24 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
24 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
24 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
24 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
25 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
25 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
25 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
25 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
25 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
25 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
26 |
Excavation |
100 |
26 |
X number of Basement(s) and Plinth |
100 |
26 |
X number of Slabs of Super Structure |
100 |
26 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
26 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
26 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
26 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
26 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
26 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
27 |
Excavation |
100 |
27 |
X number of Basement(s) and Plinth |
100 |
27 |
X number of Slabs of Super Structure |
100 |
27 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
27 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
27 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
27 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
27 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
27 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
28 |
Excavation |
100 |
28 |
X number of Basement(s) and Plinth |
100 |
28 |
X number of Slabs of Super Structure |
100 |
28 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
28 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
28 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
28 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
28 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
28 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
29 |
Excavation |
100 |
29 |
X number of Basement(s) and Plinth |
100 |
29 |
X number of Slabs of Super Structure |
100 |
29 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
29 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
29 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
29 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
29 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
29 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
30 |
Excavation |
100 |
30 |
X number of Basement(s) and Plinth |
100 |
30 |
X number of Slabs of Super Structure |
100 |
30 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
30 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
30 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
30 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
30 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
30 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
31 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
31 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
31 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
31 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
31 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
31 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
32 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
32 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
32 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
32 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
32 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
32 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
33 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
33 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
33 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
33 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
33 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
33 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
34 |
Excavation |
100 |
34 |
X number of Basement(s) and Plinth |
100 |
34 |
X number of Slabs of Super Structure |
100 |
34 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
34 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
34 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
34 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
34 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
34 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
35 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
35 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
35 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
35 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
35 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
35 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
36 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
36 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
36 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
36 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
36 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
36 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
37 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
37 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
37 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
37 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
37 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
37 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
38 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
38 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
38 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
38 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
38 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
38 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
39 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
39 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
39 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
39 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
39 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
39 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
40 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
40 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
40 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
40 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
40 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
40 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
41 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
41 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
41 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
41 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
41 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
41 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
42 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
42 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
42 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
42 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
42 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
42 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
43 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
43 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
43 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
43 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
43 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
43 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
44 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
44 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
44 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
44 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
44 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
44 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
45 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
45 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
45 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
45 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
45 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
45 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
46 |
X number of Slabs of Super Structure |
100 |
46 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
46 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
46 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
46 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
46 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
46 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
47 |
X number of Slabs of Super Structure |
100 |
47 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
47 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
47 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
47 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
47 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
47 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
48 |
X number of Slabs of Super Structure |
100 |
48 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
48 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
48 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
48 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
48 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
48 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
49 |
X number of Slabs of Super Structure |
100 |
49 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
49 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
49 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
49 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
49 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
49 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
50 |
X number of Slabs of Super Structure |
100 |
50 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
50 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
50 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
50 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
50 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
50 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
51 |
X number of Slabs of Super Structure |
100 |
51 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
51 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
51 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
51 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
51 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
51 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
52 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
52 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
52 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
52 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
52 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
52 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
53 |
Excavation |
100 |
53 |
X number of Basement(s) and Plinth |
100 |
53 |
X number of Slabs of Super Structure |
100 |
53 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
53 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
53 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
53 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
53 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
53 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
54 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
54 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
54 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
54 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
54 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
54 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
55 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
55 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
55 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
55 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
55 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
55 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
56 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
56 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
56 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
56 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
56 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
56 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
57 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
57 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
57 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
57 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
57 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
57 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
58 |
X number of Slabs of Super Structure |
100 |
58 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
58 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
58 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
58 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
58 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
58 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
59 |
Excavation |
100 |
59 |
X number of Basement(s) and Plinth |
100 |
59 |
X number of Slabs of Super Structure |
100 |
59 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
59 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
59 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
59 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
59 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
59 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
60 |
X number of Slabs of Super Structure |
100 |
60 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
60 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
60 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
60 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
60 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
60 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
61 |
X number of Slabs of Super Structure |
100 |
61 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
61 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
61 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
61 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
61 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
61 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
62 |
X number of Slabs of Super Structure |
100 |
62 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
62 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
62 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
62 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
62 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
62 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
63 |
X number of Slabs of Super Structure |
100 |
63 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
63 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
63 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
63 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
63 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
63 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
64 |
X number of Slabs of Super Structure |
100 |
64 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
64 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
64 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
64 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
64 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
64 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
65 |
X number of Slabs of Super Structure |
100 |
65 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
65 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
65 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
65 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
65 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
65 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
66 |
X number of Slabs of Super Structure |
100 |
66 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
66 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
66 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
66 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
66 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
66 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
67 |
X number of Slabs of Super Structure |
100 |
67 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
67 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
67 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
67 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
67 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
67 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
68 |
X number of Slabs of Super Structure |
100 |
68 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
68 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
68 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
68 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
68 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
68 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
69 |
X number of Slabs of Super Structure |
100 |
69 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
69 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
69 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
69 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
69 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
69 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
72 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
72 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
72 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
72 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
72 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
72 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
73 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
73 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
73 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
73 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
73 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
73 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
74 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
74 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
74 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
74 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
74 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
74 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
75 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
75 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
75 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
75 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
75 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
75 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
76 |
X number of Slabs of Super Structure |
100 |
76 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
76 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
76 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
76 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
76 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
76 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
77 |
X number of Slabs of Super Structure |
100 |
77 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
77 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
77 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
77 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
77 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
77 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
78 |
X number of Slabs of Super Structure |
100 |
78 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
78 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
78 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
78 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
78 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
78 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
79 |
Excavation |
100 |
79 |
X number of Basement(s) and Plinth |
100 |
79 |
X number of Slabs of Super Structure |
100 |
79 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
79 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
79 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
79 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
79 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
79 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
80 |
Excavation |
100 |
80 |
X number of Basement(s) and Plinth |
100 |
80 |
X number of Slabs of Super Structure |
100 |
80 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
80 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
80 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
80 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
80 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
80 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
81 |
Excavation |
100 |
81 |
X number of Basement(s) and Plinth |
100 |
81 |
X number of Slabs of Super Structure |
100 |
81 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
81 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
81 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
81 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
81 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
81 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
82 |
Excavation |
100 |
82 |
X number of Basement(s) and Plinth |
100 |
82 |
X number of Slabs of Super Structure |
100 |
82 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
82 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
82 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
82 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
82 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
82 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
83 |
Excavation |
100 |
83 |
X number of Basement(s) and Plinth |
100 |
83 |
X number of Slabs of Super Structure |
100 |
83 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
83 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
83 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
83 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
83 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
83 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
84 |
Excavation |
100 |
84 |
X number of Basement(s) and Plinth |
100 |
84 |
X number of Slabs of Super Structure |
100 |
84 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
84 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
84 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
84 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
84 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
84 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
85 |
Excavation |
100 |
85 |
X number of Basement(s) and Plinth |
100 |
85 |
X number of Slabs of Super Structure |
100 |
85 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
85 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
85 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
85 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
85 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
85 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
86 |
Excavation |
100 |
86 |
X number of Basement(s) and Plinth |
100 |
86 |
X number of Slabs of Super Structure |
100 |
86 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
86 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
86 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
86 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
86 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
86 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
87 |
Excavation |
100 |
87 |
X number of Basement(s) and Plinth |
100 |
87 |
X number of Slabs of Super Structure |
100 |
87 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
87 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
87 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
87 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
87 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
87 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
88 |
Excavation |
100 |
88 |
X number of Basement(s) and Plinth |
100 |
88 |
X number of Slabs of Super Structure |
100 |
88 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
88 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
88 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
88 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
88 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
88 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
89 |
Excavation |
100 |
89 |
X number of Basement(s) and Plinth |
100 |
89 |
X number of Slabs of Super Structure |
100 |
89 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
89 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
89 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
89 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
89 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
89 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
90 |
Excavation |
100 |
90 |
X number of Basement(s) and Plinth |
100 |
90 |
X number of Slabs of Super Structure |
100 |
90 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
90 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
90 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
90 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
90 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
90 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
91 |
X number of Slabs of Super Structure |
100 |
91 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
91 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
91 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
91 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
91 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
91 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
92 |
X number of Slabs of Super Structure |
100 |
92 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
92 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
92 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
92 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
92 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
92 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
93 |
X number of Slabs of Super Structure |
100 |
93 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
93 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
93 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
93 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
93 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
93 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
94 |
X number of Slabs of Super Structure |
100 |
94 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
94 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
94 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
94 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
94 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
94 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
95 |
X number of Slabs of Super Structure |
100 |
95 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
95 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
95 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
95 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
95 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
95 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
96 |
X number of Slabs of Super Structure |
100 |
96 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
96 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
96 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
96 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
96 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
96 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
97 |
X number of Slabs of Super Structure |
100 |
97 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
97 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
97 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
97 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
97 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
97 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
98 |
X number of Slabs of Super Structure |
100 |
98 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
98 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
98 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
98 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
98 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
98 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
99 |
X number of Slabs of Super Structure |
100 |
99 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
99 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
99 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
99 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
99 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
99 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
100 |
X number of Slabs of Super Structure |
100 |
100 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
100 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
100 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
100 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
100 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
100 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
101 |
X number of Slabs of Super Structure |
100 |
101 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
101 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
101 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
101 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
101 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
101 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
102 |
X number of Slabs of Super Structure |
100 |
102 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
102 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
102 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
102 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
102 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
102 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
103 |
X number of Slabs of Super Structure |
100 |
103 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
103 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
103 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
103 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
103 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
103 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
104 |
X number of Slabs of Super Structure |
100 |
104 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
104 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
104 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
104 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
104 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
104 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
105 |
X number of Slabs of Super Structure |
100 |
105 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
105 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
105 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
105 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
105 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
105 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
106 |
X number of Slabs of Super Structure |
100 |
106 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
106 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
106 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
106 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
106 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
106 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
107 |
X number of Slabs of Super Structure |
100 |
107 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
107 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
107 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
107 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
107 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
107 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
108 |
X number of Slabs of Super Structure |
100 |
108 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
108 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
108 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
108 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
108 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
108 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
109 |
X number of Slabs of Super Structure |
100 |
109 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
109 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
109 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
109 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
109 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
109 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
110 |
X number of Slabs of Super Structure |
100 |
110 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
110 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
110 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
110 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
110 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
110 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
111 |
X number of Slabs of Super Structure |
100 |
111 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
111 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
111 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
111 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
111 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
111 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
112 |
X number of Slabs of Super Structure |
100 |
112 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
112 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
112 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
112 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
112 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
112 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
113 |
X number of Slabs of Super Structure |
100 |
113 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
113 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
113 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
113 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
113 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
113 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
114 |
X number of Slabs of Super Structure |
100 |
114 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
114 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
114 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
114 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
114 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
114 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
115 |
Excavation |
100 |
115 |
X number of Basement(s) and Plinth |
100 |
115 |
X number of Slabs of Super Structure |
100 |
115 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
115 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
115 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
115 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
115 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
115 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
116 |
Excavation |
100 |
116 |
X number of Basement(s) and Plinth |
100 |
116 |
X number of Slabs of Super Structure |
100 |
116 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
116 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
116 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
116 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
116 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
116 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
117 |
X number of Slabs of Super Structure |
100 |
117 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
117 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
117 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
117 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
117 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
117 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
118 |
X number of Slabs of Super Structure |
100 |
118 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
118 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
118 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
118 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
118 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
118 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
119 |
X number of Slabs of Super Structure |
100 |
119 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
119 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
119 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
119 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
119 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
119 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
120 |
X number of Slabs of Super Structure |
100 |
120 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
120 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
120 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
120 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
120 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
120 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
121 |
X number of Slabs of Super Structure |
100 |
121 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
121 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
121 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
121 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
121 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
121 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
122 |
X number of Slabs of Super Structure |
100 |
122 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
122 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
122 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
122 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
122 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
122 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
123 |
X number of Slabs of Super Structure |
100 |
123 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
123 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
123 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
123 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
123 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
123 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
124 |
X number of Slabs of Super Structure |
100 |
124 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
124 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
124 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
124 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
124 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
124 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
125 |
X number of Slabs of Super Structure |
100 |
125 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
125 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
125 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
125 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
125 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
125 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
126 |
X number of Slabs of Super Structure |
100 |
126 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
126 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
126 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
126 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
126 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
126 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
127 |
X number of Slabs of Super Structure |
100 |
127 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
127 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
127 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
127 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
127 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
127 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
128 |
Excavation |
100 |
128 |
X number of Basement(s) and Plinth |
100 |
128 |
X number of Slabs of Super Structure |
100 |
128 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
128 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
128 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
128 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
128 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
128 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
129 |
X number of Slabs of Super Structure |
100 |
129 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
129 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
129 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
129 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
129 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
129 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
130 |
X number of Slabs of Super Structure |
100 |
130 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
130 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
130 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
130 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
130 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
130 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
131 |
X number of Slabs of Super Structure |
100 |
131 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
131 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
131 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
131 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
131 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
131 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
132 |
X number of Slabs of Super Structure |
100 |
132 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
132 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
132 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
132 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
132 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
132 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
133 |
X number of Slabs of Super Structure |
100 |
133 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
133 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
133 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
133 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
133 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
133 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
134 |
X number of Slabs of Super Structure |
100 |
134 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
134 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
134 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
134 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
134 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
134 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
135 |
X number of Slabs of Super Structure |
100 |
135 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
135 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
135 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
135 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
135 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
135 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
136 |
X number of Slabs of Super Structure |
100 |
136 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
136 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
136 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
136 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
136 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
136 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
137 |
X number of Slabs of Super Structure |
100 |
137 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
137 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
137 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
137 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
137 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
137 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
138 |
X number of Slabs of Super Structure |
100 |
138 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
138 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
138 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
138 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
138 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
138 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
139 |
X number of Slabs of Super Structure |
100 |
139 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
139 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
139 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
139 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
139 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
139 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
140 |
X number of Slabs of Super Structure |
100 |
140 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
140 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
140 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
140 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
140 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
140 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
141 |
X number of Slabs of Super Structure |
100 |
141 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
141 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
141 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
141 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
141 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
141 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
142 |
X number of Slabs of Super Structure |
100 |
142 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
142 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
142 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
142 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
142 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
142 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
143 |
X number of Slabs of Super Structure |
100 |
143 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
143 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
143 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
143 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
143 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
143 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
144 |
X number of Slabs of Super Structure |
100 |
144 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
144 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
144 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
144 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
144 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
144 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
145 |
X number of Slabs of Super Structure |
100 |
145 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
145 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
145 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
145 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
145 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
145 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
146 |
X number of Slabs of Super Structure |
100 |
146 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
146 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
146 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
146 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
146 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
146 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
147 |
X number of Slabs of Super Structure |
100 |
147 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
147 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
147 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
147 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
147 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
147 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
148 |
X number of Slabs of Super Structure |
100 |
148 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
148 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
148 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
148 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
148 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
148 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
149 |
X number of Slabs of Super Structure |
100 |
149 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
149 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
149 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
149 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
149 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
149 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
150 |
Excavation |
100 |
150 |
X number of Basement(s) and Plinth |
100 |
150 |
X number of Slabs of Super Structure |
100 |
150 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
150 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
150 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
150 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
150 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
150 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
151 |
X number of Slabs of Super Structure |
100 |
151 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
151 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
151 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
151 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
151 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
151 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
152 |
Excavation |
100 |
152 |
X number of Basement(s) and Plinth |
100 |
152 |
X number of Slabs of Super Structure |
100 |
152 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
152 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
152 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
152 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
152 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
152 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
153 |
X number of Slabs of Super Structure |
100 |
153 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
153 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
153 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
153 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
153 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
153 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
154 |
X number of Slabs of Super Structure |
100 |
154 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
154 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
154 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
154 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
154 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
154 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
155 |
X number of Slabs of Super Structure |
100 |
155 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
155 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
155 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
155 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
155 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
155 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
156 |
Excavation |
100 |
156 |
X number of Basement(s) and Plinth |
100 |
156 |
X number of Slabs of Super Structure |
100 |
156 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
156 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
156 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
156 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
156 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
156 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
157 |
Excavation |
100 |
157 |
X number of Basement(s) and Plinth |
100 |
157 |
X number of Slabs of Super Structure |
100 |
157 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
157 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
157 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
157 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
157 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
157 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
158 |
X number of Basement(s) and Plinth |
100 |
158 |
X number of Slabs of Super Structure |
100 |
158 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
158 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
158 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
158 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
158 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
158 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
159 |
X number of Basement(s) and Plinth |
100 |
159 |
X number of Slabs of Super Structure |
100 |
159 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
159 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
159 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
159 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
159 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
159 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
160 |
Excavation |
100 |
160 |
X number of Basement(s) and Plinth |
100 |
160 |
X number of Slabs of Super Structure |
100 |
160 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
160 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
160 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
160 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
160 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
160 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
161 |
X number of Basement(s) and Plinth |
100 |
161 |
X number of Slabs of Super Structure |
100 |
161 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
161 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
161 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
161 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
161 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
161 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
162 |
X number of Basement(s) and Plinth |
100 |
162 |
X number of Slabs of Super Structure |
100 |
162 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
162 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
162 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
162 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
162 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
162 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
163 |
X number of Basement(s) and Plinth |
100 |
163 |
X number of Slabs of Super Structure |
100 |
163 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
163 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
163 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
163 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
163 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
163 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
164 |
X number of Basement(s) and Plinth |
100 |
164 |
X number of Slabs of Super Structure |
100 |
164 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
164 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
164 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
164 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
164 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
164 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
165 |
X number of Basement(s) and Plinth |
100 |
165 |
X number of Slabs of Super Structure |
100 |
165 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
165 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
165 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
165 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
165 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
165 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
166 |
X number of Slabs of Super Structure |
100 |
166 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
166 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
166 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
166 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
166 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
166 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
167 |
X number of Slabs of Super Structure |
100 |
167 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
167 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
167 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
167 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
167 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
167 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
168 |
X number of Basement(s) and Plinth |
100 |
168 |
X number of Slabs of Super Structure |
100 |
168 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
168 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
168 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
168 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
168 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
168 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
169 |
X number of Basement(s) and Plinth |
100 |
169 |
X number of Slabs of Super Structure |
100 |
169 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
169 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
169 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
169 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
169 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
169 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
170 |
X number of Slabs of Super Structure |
100 |
170 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
170 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
170 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
170 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
170 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
170 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
171 |
X number of Slabs of Super Structure |
100 |
171 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
171 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
171 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
171 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
171 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
171 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
172 |
Excavation |
100 |
172 |
X number of Basement(s) and Plinth |
100 |
172 |
X number of Slabs of Super Structure |
100 |
172 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
172 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
172 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
172 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
172 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
172 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
173 |
X number of Slabs of Super Structure |
100 |
173 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
173 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
173 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
173 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
173 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
173 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
174 |
X number of Slabs of Super Structure |
100 |
174 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
174 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
174 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
174 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
174 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
174 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
175 |
Excavation |
100 |
175 |
X number of Basement(s) and Plinth |
100 |
175 |
X number of Slabs of Super Structure |
100 |
175 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
175 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
175 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
175 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
175 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
175 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
176 |
X number of Slabs of Super Structure |
100 |
176 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
176 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
176 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
176 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
176 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
176 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
177 |
X number of Slabs of Super Structure |
100 |
177 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
177 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
177 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
177 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
177 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
177 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
178 |
X number of Slabs of Super Structure |
100 |
178 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
178 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
178 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
178 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
178 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
178 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
179 |
X number of Slabs of Super Structure |
100 |
179 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
179 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
179 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
179 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
179 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
179 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
180 |
Excavation |
100 |
180 |
X number of Basement(s) and Plinth |
100 |
180 |
X number of Slabs of Super Structure |
100 |
180 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
180 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
180 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
180 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
180 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
180 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
181 |
Excavation |
100 |
181 |
X number of Basement(s) and Plinth |
100 |
181 |
X number of Slabs of Super Structure |
100 |
181 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
181 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
181 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
181 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
181 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
181 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
182 |
X number of Basement(s) and Plinth |
100 |
182 |
X number of Slabs of Super Structure |
100 |
182 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
182 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
182 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
182 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
182 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
182 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
183 |
X number of Basement(s) and Plinth |
100 |
183 |
X number of Slabs of Super Structure |
100 |
183 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
183 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
183 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
183 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
183 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
183 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
184 |
X number of Basement(s) and Plinth |
100 |
184 |
X number of Slabs of Super Structure |
100 |
184 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
184 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
184 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
184 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
184 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
184 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
185 |
X number of Basement(s) and Plinth |
100 |
185 |
X number of Slabs of Super Structure |
100 |
185 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
185 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
185 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
185 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
185 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
185 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
186 |
X number of Slabs of Super Structure |
100 |
186 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
186 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
186 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
186 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
186 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
186 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
187 |
X number of Basement(s) and Plinth |
100 |
187 |
X number of Slabs of Super Structure |
100 |
187 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
187 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
187 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
187 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
187 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
187 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
188 |
X number of Basement(s) and Plinth |
100 |
188 |
X number of Slabs of Super Structure |
100 |
188 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
188 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
188 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
188 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
188 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
188 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
189 |
X number of Basement(s) and Plinth |
100 |
189 |
X number of Slabs of Super Structure |
100 |
189 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
189 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
189 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
189 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
189 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
189 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
190 |
X number of Slabs of Super Structure |
100 |
190 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
190 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
190 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
190 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
190 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
190 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
191 |
X number of Slabs of Super Structure |
100 |
191 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
191 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
191 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
191 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
191 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
191 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
192 |
X number of Slabs of Super Structure |
100 |
192 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
192 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
192 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
192 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
192 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
192 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
193 |
X number of Slabs of Super Structure |
100 |
193 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
193 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
193 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
193 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
193 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
193 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
194 |
X number of Slabs of Super Structure |
100 |
194 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
194 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
194 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
194 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
194 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
194 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
195 |
X number of Slabs of Super Structure |
100 |
195 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
195 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
195 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
195 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
195 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
195 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
196 |
Excavation |
100 |
196 |
X number of Basement(s) and Plinth |
100 |
196 |
X number of Slabs of Super Structure |
100 |
196 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
196 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
196 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
196 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
196 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
196 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
197 |
X number of Slabs of Super Structure |
100 |
197 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
197 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
197 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
197 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
197 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
197 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
198 |
X number of Slabs of Super Structure |
100 |
198 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
198 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
198 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
198 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
198 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
198 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
199 |
X number of Slabs of Super Structure |
100 |
199 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
199 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
199 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
199 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
199 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
199 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
200 |
X number of Slabs of Super Structure |
100 |
200 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
200 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
200 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
200 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
200 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
200 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
201 |
X number of Slabs of Super Structure |
100 |
201 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
201 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
201 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
201 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
201 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
201 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
202 |
X number of Slabs of Super Structure |
100 |
202 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
202 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
202 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
202 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
202 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
202 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
203 |
X number of Slabs of Super Structure |
100 |
203 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
203 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
203 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
203 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
203 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
203 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
204 |
X number of Slabs of Super Structure |
100 |
204 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
204 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
204 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
204 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
204 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
204 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
205 |
X number of Slabs of Super Structure |
100 |
205 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
205 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
205 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
205 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
205 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
205 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
206 |
X number of Slabs of Super Structure |
100 |
206 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
206 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
206 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
206 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
206 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
206 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
207 |
X number of Slabs of Super Structure |
100 |
207 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
207 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
207 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
207 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
207 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
207 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
208 |
X number of Slabs of Super Structure |
100 |
208 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
208 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
208 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
208 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
208 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
208 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
209 |
X number of Slabs of Super Structure |
100 |
209 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
209 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
209 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
209 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
209 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
209 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
210 |
X number of Slabs of Super Structure |
100 |
210 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
210 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
210 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
210 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
210 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
210 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
211 |
Excavation |
100 |
211 |
X number of Basement(s) and Plinth |
100 |
211 |
X number of Slabs of Super Structure |
100 |
211 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
211 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
211 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
211 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
211 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
211 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
212 |
X number of Slabs of Super Structure |
100 |
212 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
212 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
212 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
212 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
212 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
212 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
213 |
Excavation |
100 |
213 |
X number of Basement(s) and Plinth |
100 |
213 |
X number of Slabs of Super Structure |
100 |
213 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
213 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
213 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
213 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
213 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
213 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
214 |
X number of Slabs of Super Structure |
100 |
214 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
214 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
214 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
214 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
214 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
214 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
215 |
X number of Slabs of Super Structure |
100 |
215 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
215 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
215 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
215 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
215 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
215 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
216 |
X number of Slabs of Super Structure |
100 |
216 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
216 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
216 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
216 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
216 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
216 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
217 |
X number of Slabs of Super Structure |
100 |
217 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
217 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
217 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
217 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
217 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
217 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
218 |
X number of Slabs of Super Structure |
100 |
218 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
218 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
218 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
218 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
218 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
218 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
219 |
X number of Slabs of Super Structure |
100 |
219 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
219 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
219 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
219 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
219 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
219 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
220 |
X number of Slabs of Super Structure |
100 |
220 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
220 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
220 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
220 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
220 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
220 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
221 |
X number of Slabs of Super Structure |
100 |
221 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
221 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
221 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
221 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
221 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
221 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
222 |
X number of Slabs of Super Structure |
100 |
222 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
222 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
222 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
222 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
222 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
222 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
223 |
X number of Slabs of Super Structure |
100 |
223 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
223 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
223 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
223 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
223 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
223 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
224 |
X number of Slabs of Super Structure |
100 |
224 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
224 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
224 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
224 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
224 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
224 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
225 |
X number of Slabs of Super Structure |
100 |
225 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
225 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
225 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
225 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
225 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
225 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
226 |
X number of Slabs of Super Structure |
100 |
226 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
226 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
226 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
226 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
226 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
226 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
227 |
X number of Slabs of Super Structure |
100 |
227 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
227 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
227 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
227 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
227 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
227 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
228 |
X number of Slabs of Super Structure |
100 |
228 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
228 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
228 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
228 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
228 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
228 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
229 |
X number of Slabs of Super Structure |
100 |
229 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
229 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
229 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
229 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
229 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
229 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
230 |
X number of Slabs of Super Structure |
100 |
230 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
230 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
230 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
230 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
230 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
230 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
231 |
X number of Slabs of Super Structure |
100 |
231 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
231 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
231 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
231 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
231 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
231 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
232 |
X number of Slabs of Super Structure |
100 |
232 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
232 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
232 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
232 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
232 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
232 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
233 |
Excavation |
100 |
233 |
X number of Basement(s) and Plinth |
100 |
233 |
X number of Slabs of Super Structure |
100 |
233 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
233 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
100 |
233 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
100 |
233 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
100 |
233 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
100 |
233 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |