MH
Sindhudurg
P52900031412
RERA ID: P52900031412
Project Name: Gangeshwar Plaza
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-12-31
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Gangowadi, Mumbai Goa Highway, Kankavali, Kankavli, Sindhudurg-416602

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
1714 1717 1718 1719 1720 1721 4388

Boundaries:
Adj City Survey No 1702 1713
DP RoadN Mumbai Goa Highaway
WE
S
Adj City Survey No1715

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 2042 sq.mt.
Sanctioned Built-up Area: 3449 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 2
No. of Floors sanctioned: 10
No. of Plinths: 2
No. of Stilts: 2
No. of Open Parking: 68
No. of Closed Parking: 15

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 429 to 538 sq ft 23 0
1RK 219 to 267 sq ft 6 0
2BHK 547 to 620 sq ft 4 0
Office 448 to 860 sq ft 3 0
Others 346 to 361 sq ft 2 0
Shop 62 to 270 sq ft 48 0
Project Developer:
Muralidhar Vishnu Naik c/o Vishnu Shankar Naik
Organization Type: Individual

Address: 12, Baba Sadan, Mumbai Goa Road, Bijali Nagar, Near B&C Office, Kankavali, Kankavli, Sindhudurg-416602

Office Phone: +91 23672 31986


Other Professionals involved:
Professional Name Professional Type
Suhas J Palav Chartered Accountant
Digambar Kanekar Engineer
Gitesh Mahendrakumar Murkar Architect


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Gangeshwar Plaza: A New Residential and Commercial Hub in Kankavli

Gangeshwar Plaza, a new project registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) under ID P52900031412, promises to redefine living and commercial spaces in the vibrant town of Kankavli. Located strategically on the Mumbai Goa Highway in Gangowadi, this project offers a unique blend of residential and commercial units, catering to a diverse range of needs and aspirations.

The project is spread across a spacious 2042 sq. meters of land, encompassing two buildings with a total sanctioned FSI of 3449. The project comprises two plinths, two stilts, and 10 floors, promising a modern and well-planned living experience.

A Haven for Every Lifestyle:

Gangeshwar Plaza offers a wide variety of units to suit different needs, ranging from compact 1RKs starting from 219 sq. ft. to spacious 2BHKs of up to 620 sq. ft. The project also features 1BHK apartments, office spaces, and shops, making it an attractive option for both individuals and families. The inclusion of 68 open parking spaces and 15 closed parking spaces ensures convenient and secure parking for residents and visitors.

Prime Location, Unmatched Convenience:

The project’s prime location on the Mumbai Goa Highway offers unmatched convenience, with easy access to all essential amenities, including schools, hospitals, banks, and markets. The proximity to the highway also ensures excellent connectivity to neighboring cities and towns.

Investment Opportunity:

Gangeshwar Plaza presents an excellent investment opportunity, particularly with the growing demand for residential and commercial spaces in Kankavli. The project’s well-planned design, prime location, and diverse unit options make it a promising venture for both end-users and investors.

Sustainability and Quality:

Gangeshwar Plaza is committed to sustainable practices and utilizes high-quality construction materials to ensure a durable and eco-friendly living environment. The project aims to provide residents with a comfortable and safe living experience.

Conclusion:

Gangeshwar Plaza is poised to become a prominent landmark in Kankavli, offering a unique blend of modern living, commercial opportunities, and strategic location. With its diverse unit options, convenient amenities, and commitment to quality, this project is set to cater to a wide range of needs and aspirations. The project’s completion in December 2025 will mark a new chapter in the development of Kankavli, offering residents and investors an unparalleled living and investment experience.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 39.92 6 0
1BHK 41.65 12 0
1BHK 42.11 2 0
1BHK 43.18 2 0
1BHK 49.99 1 0
1RK 20.42 2 0
1RK 24.86 3 0
1RK 24.87 1 0
2BHK 50.87 2 0
2BHK 57.66 2 0
Godown 32.16 1 0
Godown 33.6 1 0
Office space 41.65 1 0
Office space 49.41 1 0
Office space 79.9 1 0
Shop 13.27 1 0
Shop 17.12 1 0
Shop 18.58 2 0
Shop 18.59 1 0
Shop 18.68 8 0
Shop 20.24 1 0
Shop 20.89 2 0
Shop 21 1 0
Shop 21.15 10 0
Shop 21.24 1 0
Shop 21.81 6 0
Shop 23.49 6 0
Shop 25.17 1 0
Shop 5.82 3 0
Shop 6.06 2 0
Shop 9.25 1 0
Shop 9.28 1 0

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 as per plan
Water Supply : 100 bore well
Open Parking : 100 as per plan

 

New documents listed below were uploaded to the Documents section:

  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 85
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 85
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
2 Overall Percentage of Completion of the work done For the entire Building /Wing 85.5

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 15 0 100

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 80 as per plan
Water Supply : 75 bore well
Lift : 100 as per plan
Electrical Meter Room, Sub-Station, Receiving Station : 100 as per plan

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • Building Plan Approval / NA Order for plotted development [2]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • Proforma of Allotment letter [2]