RERA ID: P52900026109
Project Name: ATHANG HOMES Project By Morvekar Realtors
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-09-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Kandalgaon, Malvan Achara Road, Shemadranewadi, Malwan, Sindhudurg-416606

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
Survey No 4 Hissa No 11

Boundaries:
Survey No 11
Survey No 15N Achara Malvan Road
WE
S
Survey No 5

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 6400 sq.mt.
Sanctioned Built-up Area: 3200 sq.mt.
Recreational Open Space: 535 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 17
No. of Plinths: 5
No. of Open Parking: 32

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 400 sq ft 104 82
Project Developer:
CHANDRASHEKHAR SURYAKANT MORVEKAR c/o SURYAKANT DAJI MORVEKAR
Organization Type: Individual

Address: A-201, Pride Signature Building No 2, S K P Collage Road, Bharad, Near Pride Hotel, Malwan (M Cl), Malwan, Sindhudurg-416606

Office Phone: +91 23652 51224


Other Professionals involved:
Professional Name Professional Type
Sachin Morvekar Architect
Manoj Joshi Engineer
Satish S Dakare Chartered Accountant
Krishna Ghadi Engineer


Projects in the state by this developer:
P52900026109 - ATHANG HOMES Project By Morvekar Realtors - Sindhudurg
P52900006455 - SINDHUSHRUSHTI TOURISM VILLAGE PHASE II - Sindhudurg
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Athang Homes: A New Residential Project in Malvan, Maharashtra

Athang Homes, a new residential project by Morvekar Realtors, is set to redefine luxury living in Malvan, Maharashtra. With its strategic location and thoughtfully designed apartments, this project promises a unique blend of comfort, convenience, and natural beauty.

A Prime Location:

Athang Homes is situated in the idyllic village of Shemadranewadi, nestled in the heart of Malvan. The project enjoys easy access to Achara Malvan Road, connecting residents to the bustling town center and its various amenities. The project’s proximity to the serene Kandalgaon locality further enhances its appeal, offering residents a tranquil escape from city life.

A Well-Planned Development:

Spanning a total area of 6400 sq. meters, Athang Homes boasts a meticulously planned layout. The project is designed to accommodate 4 buildings, with 3 already sanctioned for construction. Each building will rise up to 17 floors, offering residents breathtaking views of the surrounding landscape.

Spacious and Functional Apartments:

Athang Homes offers a variety of apartment configurations, catering to diverse needs. The star attraction is the 1BHK apartment, spanning 400 sq. ft. and meticulously designed for maximum space optimization. These thoughtfully crafted homes are perfect for individuals, couples, or small families seeking a comfortable and contemporary living experience.

A Focus on Amenities:

Athang Homes prioritizes a comfortable and convenient lifestyle for its residents. The project offers a plethora of amenities, including:

  • Ample Parking: With a total of 32 open parking spaces allocated for both 4-wheelers and 2-wheelers, residents can be assured of convenient parking options.
  • Spacious Open Spaces: The project dedicates 535 sq. meters to recreational open spaces, providing a haven for relaxation and leisure activities.

Investment Opportunity:

Athang Homes presents an attractive investment opportunity. With its prime location, well-planned development, and focus on quality, this project is set to appreciate in value over time.

Trusted Developer:

Morvekar Realtors, the developer behind Athang Homes, is known for its commitment to quality and timely delivery. The project has been registered with MahaRERA under the ID P52900026109, providing assurance and transparency to prospective buyers.

Conclusion:

Athang Homes is not just a residential project; it’s a vision for a vibrant community. With its prime location, thoughtfully designed apartments, and an array of amenities, this project promises a fulfilling and enriching living experience. For those seeking a new home in Malvan, Athang Homes is an ideal choice.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 37.17 104 82

 

New documents listed below were uploaded to the Documents section:

  • 1 Architect’s Certificate on Completion of Project (Form 4)

 

New documents listed below were uploaded to the Documents section:

  • 2 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Electrical Meter Room, Sub-Station, Receiving Station : 100 Yet tobe done As per Approved plans
Internal Roads & Footpaths : 100 Yet tobe done As per Approved plans
Solid Waste Management And Disposal : 100
Treatment And Disposal Of Sewage And Sullage Water : 100
Street Lighting : 100 Yet tobe done As per Approved plans
Landscaping & Tree Planting : 100 Yet tobe done As per Approved plans
Storm Water Drains : 100 Yet tobe done As per Approved plans
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 Yet tobe done As per Approved plans

 

New documents listed below were uploaded to the Documents section:

  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 7 Disclosure of sold/ booked inventory
  • 8 Disclosure of sold/ booked inventory
  • 9 Disclosure of sold/ booked inventory
  • 10 Disclosure of sold/ booked inventory

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
4 Overall Percentage of Completion of the work done For the entire Building /Wing 90
5 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
5 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 37.17 104 82

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
1 Overall Percentage of Completion of the work done For the entire Building /Wing 80
2 Stilt Floor 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
2 Overall Percentage of Completion of the work done For the entire Building /Wing 80
3 Stilt Floor 100
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
3 Overall Percentage of Completion of the work done For the entire Building /Wing 80
4 Stilt Floor 100
4 X number of Slabs of Super Structure 75
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
4 Overall Percentage of Completion of the work done For the entire Building /Wing 60
5 Excavation 100
5 X number of Basement(s) and Plinth 100
5 X number of Podiums 0
5 Stilt Floor 100
5 X number of Slabs of Super Structure 75
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
5 Overall Percentage of Completion of the work done For the entire Building /Wing 60

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 37.17 104 76

 

New documents listed below were uploaded to the Documents section:

  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 6 Disclosure of sold/ booked inventory
  • 5 Disclosure of sold/ booked inventory
  • 1 b Details of encumbrances concerned to Legal
  • 4 Disclosure of sold/ booked inventory
  • 3 Disclosure of sold/ booked inventory
  • 2 Disclosure of sold/ booked inventory
  • 1 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 a Details of encumbrances concerned to Finance
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Storm Water Drains : 50 Yet tobe done As per Approved plans
Sewerage (Chamber, Lines, Septic Tank , STP) : 50 Yet tobe done As per Approved plans
Water Supply : 100 Completed
Internal Roads & Footpaths : 25 Yet tobe done As per Approved plans
Solid Waste Management And Disposal : 0
Treatment And Disposal Of Sewage And Sullage Water : 50

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Building Plan Approval / NA Order for plotted development
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • Other
  • Proforma of Allotment letter [2]