MH
Satara
P52700032922
RERA ID: P52700032922
Project Name: HerambASIA
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-12-30
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2022-11-25).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Agashivnagar, Dhebewadi Road, Malkapur (Np), Karad, Satara-415539

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
173/12

Boundaries:
Dhebewadi Road
Gat no 173 plot 11N Gat No 173 Plot 13
WE
S
Gat no 150

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 661 sq.mt.
Sanctioned Built-up Area: 1269 sq.mt.
Recreational Open Space: 250 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 5
No. of Plinths: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 362 to 623 sq ft 9 0
2BHK 590 to 623 sq ft 9 0
Shop 218 to 248 sq ft 12 0
Project Developer:
Heramb developers
Organization Type: Partnership

Address: 8, Yashotara, Jakhimwadi Road, Koyanavasahat, Behind Pachmandir, Karad, Satara-415539

Office Phone: +91 21642 58117


Member details:
Member Name Designation
Fattesingh Dhanajirao Jadhav Partner
Apasaheb Bhargav Pawar Partner


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
Atmaram Hanmant Pawar Individual Area Share
Sitaram Hanmant Pawar Individual Area Share
Arun Hanmant Pawar Individual Area Share


Other Professionals involved:
Professional Name Professional Type
Sidhiraj Desai Architect
Sourabh Sidharth Londhe Engineer
nikhil oswal Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing HerambASIA: A New Residential Oasis in Agashivnagar

Nestled in the tranquil neighborhood of Agashivnagar, Satara, HerambASIA emerges as an exciting new real estate project that promises to transform urban living. With its contemporary design and meticulously planned amenities, this project is set to redefine the standards of modern comfort and convenience.

Project Highlights

  • Registered with RERA (P52700032922), ensuring transparency and buyer protection
  • Project Type: Others
  • Proposed Date of Completion: November 25, 2022
  • No legal litigations related to the project

Location and Connectivity

Strategically located in Malkapur (NP), the project boasts excellent connectivity to major thoroughfares and social infrastructure. It is easily accessible by Dhebewadi Road, which provides seamless travel to the rest of the city and beyond.

Plot Details

Spread across a sprawling 661 square meters, the project’s plot offers ample space for open spaces and recreational amenities. It is bordered by Gat no 173 plot 13 to the east, Gat no 173 plot 11 to the west, Dhebewadi Road to the north, and Gat no 150 to the south.

Building and Amenities

The project consists of one proposed building with five sanctioned floors. The building is designed to provide a comfortable and secure living environment, featuring a host of amenities. These amenities include:

  • 1 Plinth level
  • Total Recreational Open Space: 250 square meters
  • Shops for convenient shopping and services

Unit Options

HerambASIA offers a range of unit options to cater to diverse buyer needs:

  • 1BHK units ranging from 362 to 623 square feet
  • 2BHK units ranging from 590 to 623 square feet
  • Shops ranging from 218 to 248 square feet

About the Developer

Heramb developers, a reputable partnership firm, is the driving force behind this project. Their commitment to quality construction and customer satisfaction is evident in every aspect of HerambASIA.

Conclusion

HerambASIA is a meticulously planned real estate project that offers a rare combination of convenience, comfort, and modern living. With its prime location, contemporary design, and array of amenities, this project is poised to become the epitome of urban living in Agashivnagar. Whether you’re a first-time homebuyer, an investor seeking a lucrative opportunity, or simply looking for a spacious and well-connected home, HerambASIA is the perfect choice for you.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 33.65 8 0
1BHK 57.9 1 0
2BHK 54.88 6 0
2BHK 57.9 3 0
Shop 20.33 4 0
Shop 20.42 2 0
Shop 20.6 2 0
Shop 22.63 2 0
Shop 23.08 2 0

 

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2024-12-30

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Supply : 80 BOARWELL

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 57.9 1 0
2BHK 57.9 3 0

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 0
1 X number of Slabs of Super Structure 80
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 0
1 Overall Percentage of Completion of the work done For the entire Building /Wing 44

 

New documents listed below were uploaded to the Documents section:

  • 2 Disclosure of sold/ booked inventory
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 4 Declaration in FORM B
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 1 Disclosure of sold/ booked inventory

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 0 UNDER CONSTRUCTION
Water Supply : 95 as per drawing
Internal Roads & Footpaths : 0 UNDER CONSTRUCTION

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [4]
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B [3]
  • Details of encumbrances [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [4]
  • Proforma of Allotment letter