2025-02-28
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Krishna Canal, Govare Road, Saidapur (Ct), Karad, Satara-415124

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
S. no. 244 5B 3 Plot no 3 and 4

Boundaries:
9 mtr Road
S No 246N S No244-5B-2
WE
S
9 Mtr Road

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 901 sq.mt.
Sanctioned Built-up Area: 1271 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 2
No. of Floors sanctioned: 6
No. of Plinths: 2
No. of Stilts: 2
No. of Closed Parking: 2

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 3454 to 5514 sq ft 13 3
Project Developer:
KANYARATNA INFRA
Organization Type: Partnership

Address: 244/5B, Plot No. 4, Govare Road, Krishna Canal, Near Maya Regency, Saidapur (Ct), Karad, Satara-415124

Office Phone: +91 98331 40019


Member details:
Member Name Designation
ADHIKRAO SHRIRANG PAWAR Authorized Signatory
KIRAN ADHIKRAO JADHAV Partner
SANJAY KHASHABA SHINDE Partner


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
Archana Sanjay Patil Individual Area Share


Other Professionals involved:
Professional Name Professional Type
Rauf Musa Sutar Architect
Mohammeali Bapu Pendhari Engineer
Vinayak Kumar Karade Contractor
NIKHIL INDRAMAL OSWAL Chartered Accountant
SAMEER SURESH PATIL Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

KANYARATNA ROW BUNGLOWS: A Luxurious Escape in the Heart of Satara

Introducing KANYARATNA ROW BUNGLOWS, a new residential project situated in the tranquil and picturesque locale of Saidapur (CT), Karad, Satara. Developed by KANYARATNA INFRA, a reputable partnership firm, this project promises a harmonious blend of modern living and serene natural beauty.

A Project of Distinction:

KANYARATNA ROW BUNGLOWS is registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) under the ID P52700031231, ensuring transparency and accountability throughout the development process. The project is strategically located in the Krishna Canal area, easily accessible via Govare Road, and is in close proximity to landmarks like Maya Regency.

Spacious and Luxurious Living:

Spanning across a total plot area of 901 sq. mtrs, the project comprises two elegantly designed buildings with a sanctioned FSI of 1271. Each building boasts a total of 6 floors, including 2 stilts, offering residents a range of spacious and well-ventilated apartments. The project also includes 2 closed parking spaces, providing convenience and security for vehicle owners.

A Tranquil Oasis:

KANYARATNA ROW BUNGLOWS is designed to offer a peaceful and serene living experience. The project’s location amidst the scenic beauty of Satara provides a welcome escape from the hustle and bustle of city life. Residents can enjoy the tranquility of their surroundings while still having access to all the conveniences of modern living.

Investing in the Future:

With its prime location, meticulous planning, and commitment to quality construction, KANYARATNA ROW BUNGLOWS presents a compelling investment opportunity. The project is expected to be completed by February 28, 2025, ensuring a timely handover of the finished homes to the residents.

Contact Us Today:

For further information and inquiries regarding KANYARATNA ROW BUNGLOWS, please contact KANYARATNA INFRA at 9833140019. We would be delighted to provide you with detailed information about the project and help you find your dream home in this serene and luxurious development.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 320.98 5 0
2BHK 512.3 8 3

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 80

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Street Lighting : 100 PROVIDED
Water Supply : 100 boarwell
Electrical Meter Room, Sub-Station, Receiving Station : 100 COMPLETED
Water Conservation, Rain water Harvesting : 100 COMPLETED
Storm Water Drains : 100 COMPLETED
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 drainage line installed & Underground Septic Tank

 

New documents listed below were uploaded to the Documents section:

  • 3 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

New documents listed below were uploaded to the Documents section:

  • 2 a Details of encumbrances concerned to Finance
  • 1 Proforma of Agreement for sale
  • 1 b Details of encumbrances concerned to Legal
  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Conservation, Rain water Harvesting : 9 wip
Water Supply : 90 boarwell
Sewerage (Chamber, Lines, Septic Tank , STP) : 90 drainage line installed & Underground Septic Tank
Street Lighting : 90 WIP

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
1 Overall Percentage of Completion of the work done For the entire Building /Wing 89
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
2 Overall Percentage of Completion of the work done For the entire Building /Wing 67

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 2 Disclosure of sold/ booked inventory
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • Building Plan Approval / NA Order for plotted development
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of Interest in Other Real Estate Organizations [3]
  • Disclosure of sold/ booked inventory
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)