MH
Satara
P52700027557
RERA ID: P52700027557
Project Name: SHIVGAD RESIDENCY
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2028-06-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Vikasnagar, Satara Koregaon Road, Khed (Ct), Satara-415003

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
S NO 64 2B AND PART OF 64 2A

Boundaries:
18 MTR DP ROAD
PLT NO 28 AND 56N S NO 64 2C
WE
S
S NO 64 4

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 5400 sq.mt.
Sanctioned Built-up Area: 5987 sq.mt.
Recreational Open Space: 533 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 15
No. of Plinths: 3

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 358 to 417 sq ft 48 36
2BHK 0 to 615 sq ft 44 34
Project Developer:
ADITI BUILDERS
Organization Type: Partnership

Address: Plot No 11, 21/1G, Kamlakar Empire, Satara Koregaon Road, Vikasnagar, Vanvasvadi, Vanvaswadi, Satara-415003

Office Phone: +91 21622 98704


Member details:
Member Name Designation
MAHESH KISAN MANE Partner
SAGAR NARAYAN GHORPADE Partner
KIRAN PRAKASH PATIL Partner
GAYATRI ABHIJIT SURYAWANSHI Partner
SAGAR CHANDRAKANT SHINDE Partner
VAIBHAV PANDURANG SHINDE Partner
ABHIJIT DASHRATH TAMBOLI Partner
HEMANT SHANKAR KADAM Partner
HEMANT SHANKAR KADAM Authorized Signatory
MAHESH KISAN MANE Authorized Signatory
SAGAR NARAYAN GHORPADE Authorized Signatory


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
ANITA SATISH YADAV Individual Area Share


Other Professionals involved:
Professional Name Professional Type
SAMEER CHANDRAKANT SHINDE Chartered Accountant
SUMIT SHIVAJI BAGAD E Architect
NITIN SUBHASHRAO JADHAV Engineer


Projects in the state by this developer:
P52700027557 - SHIVGAD RESIDENCY - Satara
P51700023797 - HIRA SADAN - Thane
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing SHIVGAD RESIDENCY: A New Residential Haven in the Heart of Satara

In the quaint and picturesque village of Khed, nestled amidst the vibrant landscape of Satara, a magnificent new residential project is taking shape. SHIVGAD RESIDENCY, a testament to the vision and expertise of ADITI BUILDERS, promises to redefine modern living in this charming locale.

Exceptional Location and Connectivity

SHIVGAD RESIDENCY is strategically situated along Satara Koregaon Road in the Vikasnagar neighborhood. Its prime location ensures seamless connectivity to the city center, major commercial hubs, and educational institutions. The project’s proximity to the 18-meter DP road provides convenient access to various modes of transportation.

Project Highlights

  • RERA Registration Number: P52700027557
  • Project Type: Residential
  • Total Plot Area: 5,400 square meters
  • Number of Buildings: 3 (out of 4 proposed)
  • Total Sanctioned FSI: 5,987 square meters

Exquisite Amenities and Open Spaces

SHIVGAD RESIDENCY offers a comprehensive range of amenities designed to enhance the quality of life for its residents. These include:

  • Ample recreational open space (533 square meters) for relaxation and rejuvenation
  • Three plinths and 15 sanctioned floors
  • State-of-the-art security features for peace of mind
  • Convenient parking facilities

Diverse Unit Options

SHIVGAD RESIDENCY caters to a wide range of lifestyle needs, offering a variety of unit options:

  • 1BHK units ranging from 358 to 417 square feet (48 units)
  • 2BHK units ranging from 0 to 615 square feet (44 units)

Each unit is meticulously designed to maximize space and functionality, ensuring a comfortable and luxurious living experience.

Prominent Developer

ADITI BUILDERS, a renowned real estate firm with an established track record of delivering exceptional projects, stands behind SHIVGAD RESIDENCY. The firm’s commitment to quality construction, innovative design, and customer satisfaction guarantees a hassle-free and rewarding homeownership experience.

Embrace the Future of Living

SHIVGAD RESIDENCY is not merely a residential development; it is a testament to the vibrant spirit and aspirations of Satara. By harmoniously blending modern conveniences with the charm of its surroundings, this project invites you to embrace the future of living and create lasting memories in this exceptional abode.

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
1 Overall Percentage of Completion of the work done For the entire Building /Wing 68.5
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 70
2 Overall Percentage of Completion of the work done For the entire Building /Wing 65
3 X number of Slabs of Super Structure 100
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
3 Overall Percentage of Completion of the work done For the entire Building /Wing 45

 

New documents listed below were uploaded to the Documents section:

  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 8 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 33.35 20 16
1BHK 38.76 8 3
2BHK 45.48 20 17
2BHK 57.18 24 17

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 40 0
Storm Water Drains : 40 work not started

 

New documents listed below were uploaded to the Documents section:

  • 7 Disclosure of sold/ booked inventory
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 60
1 Overall Percentage of Completion of the work done For the entire Building /Wing 58
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
2 Overall Percentage of Completion of the work done For the entire Building /Wing 56
3 X number of Slabs of Super Structure 80
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
3 Overall Percentage of Completion of the work done For the entire Building /Wing 42

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 33.35 20 13
1BHK 36.18 20 17
1BHK 38.76 8 4
2BHK 45.48 20 18
2BHK 57.18 24 15

 

New documents listed below were uploaded to the Documents section:

  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

New documents listed below were uploaded to the Documents section:

  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 Disclosure of sold/ booked inventory
  • 3 Disclosure of sold/ booked inventory
  • 4 Disclosure of sold/ booked inventory
  • 5 Disclosure of sold/ booked inventory
  • 6 Disclosure of sold/ booked inventory

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
1 Overall Percentage of Completion of the work done For the entire Building /Wing 50
2 Stilt Floor 100
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
2 Overall Percentage of Completion of the work done For the entire Building /Wing 46
3 Stilt Floor 100
3 X number of Slabs of Super Structure 60
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
3 Overall Percentage of Completion of the work done For the entire Building /Wing 38

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 20 0 30

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) [2]
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • Building Plan Approval / NA Order for plotted development [10]
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [2]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • Proforma of Allotment letter