RERA ID: P52700006345
Project Name: 4S Flower Valley
Project Type: Residential
Project Status: On-Going Project *
* Projects that were already under development in May 2017, when RERA was implemented.
2025-12-31
Extended Date of Completion
The project missed completion date 2 time(s) earlier (2019-12-31, 2019-12-31).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
, Ruighar, Jaoli, Satara-412805

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
497/7,8,9,10

Boundaries:
11
484N 6
WE
S
Internal Road

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 3934 sq.mt.
Sanctioned Built-up Area: 1814 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 4
No. of Floors sanctioned: 12
No. of Plinths: 4
No. of Stilts: 4
No. of Closed Parking: 4

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 140 to 361 sq ft 20 15
1RK 140 to 192 sq ft 24 19
2BHK 361 to 508 sq ft 19 17
Project Developer:
Dilip Sadashiv Ghadge c/o Sadashiv Krushnaji Ghadge
Organization Type: Individual

Address: 4, Karadkar Cottage, B Road, Panchgani, Near S.T.Stand, Panchgani (M Cl), Mahabaleshwar, Satara-412805

Office Phone: +91 21682 40655


Other Professionals involved:
Professional Name Professional Type
Matrix Engineers Architect


Litigations

Litigations related to the project ? No
Complaints

Complaint No Complainant Name
CC005000000085596 Jayashree Pandurang Sankpal
CC005000000095699 Amol Vilas Pawar
CC005000000095699 Madhushree Amol Pawar
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

An Introduction to 4S Flower Valley: A Flourishing Residential Project in the Heart of Maharashtra

4S Flower Valley, a meticulously planned residential project, promises a serene and comfortable living experience in the picturesque landscape of Ruighar, Maharashtra. With RERA ID P52700006345, this ongoing project is meticulously designed to offer a blend of modern amenities and natural beauty.

Located in the Jaoli Taluka of Satara district, 4S Flower Valley boasts a strategic location, encompassing a total plot area of 3934 sq m. The project consists of four planned buildings, all of which have received sanction, ensuring a seamless construction process. The project’s sanctioned built-up area of 1814 sq m offers a comfortable and well-defined living space for its residents.

The project promises a harmonious blend of modern living and nature’s tranquility. With 4 plinths, 12 sanctioned floors, and 4 stilts, the buildings are designed for optimum functionality and space utilization. Residents will enjoy the convenience of 4 closed parking spaces, ensuring the security of their vehicles.

4S Flower Valley offers a variety of unit types to cater to diverse needs and preferences. 1BHK units ranging from 140 to 361 sq ft, 1RK units ranging from 140 to 192 sq ft, and 2BHK units ranging from 361 to 508 sq ft ensure that every individual and family can find their perfect home within this project.

The project is backed by the Bank of Maharashtra (IFSC Code: MAHB0000219), ensuring financial stability and transparency. The proposed date of completion was 2019-12-31, but has been extended to 2025-12-31. However, it is important to note that there are no litigations related to the project, demonstrating its commitment to providing a hassle-free experience for its future residents.

With its strategic location, comprehensive amenities, and diverse unit offerings, 4S Flower Valley presents a compelling opportunity to experience comfortable and contemporary living in a serene and natural setting. As the project continues to progress towards completion, it promises to become a landmark residential development in the region, attracting residents seeking a harmonious and fulfilling lifestyle.

New documents listed below were uploaded to the Documents section:

  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Storm Water Drains : 50 Road Side Drain

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Landscaping & Tree Planting : 65 Tree Plantation
Storm Water Drains : 35 Road Side Drain
Street Lighting : 0 Nil
Sewerage (Chamber, Lines, Septic Tank , STP) : 75 Septic Tank
Solid Waste Management And Disposal : 0 Nil
Water Supply : 75 Well Water
Electrical Meter Room, Sub-Station, Receiving Station : 25 Meter Room
Water Conservation, Rain water Harvesting : 0 NIL
Internal Roads & Footpaths : 75 Paver Block

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Basement(s) and Plinth 100
1 X number of Podiums 100
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
1 Overall Percentage of Completion of the work done For the entire Building /Wing 95
2 X number of Basement(s) and Plinth 100
2 X number of Podiums 100
2 Stilt Floor 100
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
2 Overall Percentage of Completion of the work done For the entire Building /Wing 95
3 Excavation 100
3 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
3 Stilt Floor 100
3 X number of Slabs of Super Structure 70
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 34
3 Overall Percentage of Completion of the work done For the entire Building /Wing 54.9
4 X number of Basement(s) and Plinth 100
4 X number of Podiums 100
4 Stilt Floor 100
4 X number of Slabs of Super Structure 100
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
4 Overall Percentage of Completion of the work done For the entire Building /Wing 95

 

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2025-12-31

 

New documents listed below were uploaded to the Documents section:

  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 13.08 5 3
1BHK 18.44 4 1
2BHK 46.2 8 8
2BHK 46.2 4 3

 

New documents listed below were uploaded to the Documents section:

  • 2 Certificates of CA (Form 5)
  • 1 Disclosure of Interest in Other Real Estate Organizations
  • 1 CERSAI details
  • 2 Disclosure of sold/ booked inventory
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • 1 Declaration about Commencement Certificate
  • 2 Declaration in FORM B
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Building Plan Approval (IOD) [2]
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project) [13]
  • Certificates of CA (Form 5)
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project) [13]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Proforma of Allotment letter [2]