MH
Sangli
P53100035052
RERA ID: P53100035052
Project Name: RAVISH VASTUSHILP
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-04-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Chinmay Park, Sanjay Nagar Police Station Road, Sangli Miraj Kupwad (M Corp.), Miraj, Sangli-416416

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
NEW S NO 11/2, PLOT NO. 57

Boundaries:
PLOT NO 12
PLOT NO 8N LAND of S NO 11-2
WE
S
18 M WDIE DP ROAD

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 242 sq.mt.
Sanctioned Built-up Area: 594 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 6
No. of Plinths: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 422 sq ft 5 3
2BHK 660 sq ft 5 3
Project Developer:
VASTUSHILP
Organization Type: Partnership

Address: 520, -, Alkud (M), Kavathemahankal, Sangli-416419

Office Phone: +91 23302 34600


Member details:
Member Name Designation
MAHESH APPASAHEB PATIL Authorized Signatory
RAHUL RAMKRISHNA KULKARNI Authorized Signatory
NARENDRA JAYANT RANADE Authorized Signatory
SATISH MAHADEV NANAVARE Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
ABHISHEK VORA Architect
KEDAR A SABANE Chartered Accountant
SMITESH BABULAL SHAH Engineer


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

A Serene Haven in the Heart of Sangli: Introducing Ravish Vastushilp

Nestled in the tranquil Chinmay Park locality of Sangli, Maharashtra, Ravish Vastushilp emerges as a promising new residential project, promising a life of comfort and convenience. Developed by the esteemed Vastushilp partnership, this project offers a unique blend of modern living and traditional values, all within a serene and well-connected environment.

A Prime Location with Easy Access:

Situated on a 242 sq mt plot, Ravish Vastushilp boasts a strategic location in Sanjay Nagar Police Station Road, with convenient access to essential amenities. The project falls under the jurisdiction of Sangli Miraj Kupwad (M Corp.), ensuring seamless connectivity to the city’s vibrant pulse.

A Well-Designed Residential Complex:

Ravish Vastushilp is designed with a singular focus on providing comfortable and functional living spaces. The project comprises a single building with six sanctioned floors, offering a total sanctioned FSI of 594. This translates to a limited number of meticulously crafted apartments, ensuring a sense of exclusivity and privacy.

Tailored Choices for Diverse Needs:

The project offers a range of apartment configurations to cater to diverse preferences and lifestyles. Buyers can choose from either spacious 1BHK units spanning 422 sq ft or more expansive 2BHK units measuring 660 sq ft. With a total of 10 units available, each designed with careful consideration for functionality and aesthetics, residents can find their perfect abode within Ravish Vastushilp.

A Project Rooted in Trust and Transparency:

Ravish Vastushilp operates under the watchful eye of MahaRERA, carrying the registration ID P53100035052. This ensures transparency and accountability, providing prospective buyers with the assurance of a legally compliant and secure investment.

A Promise of Tranquility and Growth:

Ravish Vastushilp is poised to become a coveted address in Sangli. The project offers a harmonious blend of modern amenities and the serenity of a well-planned community. With its prime location, thoughtfully designed units, and commitment to transparency, Ravish Vastushilp represents an opportunity to secure a comfortable and fulfilling life in a flourishing city.

New documents listed below were uploaded to the Documents section:

  • 4 Disclosure of sold/ booked inventory
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 1 Architect’s Certificate on Completion of Project (Form 4)

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 5 5 100

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Storm Water Drains : 100 CONNECT TO GUTTER
Water Conservation, Rain water Harvesting : 100 RAIN WATER HERVESTING
Electrical Meter Room, Sub-Station, Receiving Station : 100 METER BOARD
Water Supply : 100 BORE WELL
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 SEPTIC TANK & SOAK PIT

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [3]
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory [3]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [3]
  • Proforma of Allotment letter