MH
Sangli
P53100032624
RERA ID: P53100032624
Project Name: VASTUSHRI
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-12-01
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2024-03-30).
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Near Petrol Pummp, 100 Ft Road, Sangli Miraj Kupwad (M Corp.), Miraj, Sangli-416416

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
10591

Boundaries:
CTS 10592
ROADN CSNO 10608 and 10609
WE
S
CSNO 10590

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 633 sq.mt.
Sanctioned Built-up Area: 1586 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 6
No. of Plinths: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 638 to 671 sq ft 20 9
Project Developer:
REAL LAND MARK DEVELOPERS LLP
Organization Type: Partnership

Address: Csno 8544, Sarang Apartment, Sawant Hospital Road, Near Khare Mangal Hall, Vishrambag, Sangli Miraj Kupwad (M Corp.), Miraj, Sangli-416416

Office Phone: +91 23300 00000


Member details:
Member Name Designation
SHITAL SUBHASH KAVATHEKAR Authorized Signatory
SANKET PRAMOD JADHAV Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
SACHIN G KANOJE Architect
PRAVIN PISE Engineer
SHOUNAK PAILWAN Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

VASTUSHRI: A New Residential Project in Sangli, Maharashtra

VASTUSHRI, a brand new residential project by REAL LAND MARK DEVELOPERS LLP, is set to redefine luxurious living in Sangli, Maharashtra. Located strategically near the Petrol Pump on 100 FT ROAD, this project offers a unique opportunity to own your dream home in a prime location.

Project Highlights:

  • RERA Approved: The project is registered with MahaRERA under the ID P53100032624, ensuring transparency and accountability.
  • Prime Location: Situated in the heart of Sangli Miraj Kupwad (M Corp.), VASTUSHRI offers easy access to essential amenities like schools, hospitals, markets, and recreational spaces.
  • Well-planned Layout: Spread across a spacious plot of 633 sq mts, VASTUSHRI comprises a single building with 6 sanctioned floors. This thoughtful design ensures ample open spaces and airy living.
  • Luxurious Amenities: The project boasts a host of amenities, including a comfortable living environment with multiple units on offer.
  • Completion Date: The project is expected to be completed by March 30, 2024, offering a convenient timeline for prospective buyers.

Units on Offer:

VASTUSHRI offers a variety of spacious and well-designed 2BHK apartments ranging from 638 to 671 sq ft, ensuring a comfortable living space for families and individuals alike.

Developer Profile:

REAL LAND MARK DEVELOPERS LLP, a reputable partnership firm, brings years of experience in the real estate sector. Their commitment to quality construction and customer satisfaction is evident in their other project, SARANG APARTMENT, located near KHARE MANGAL HALL in Sangli Miraj Kupwad (M Corp.).

Investing in VASTUSHRI:

VASTUSHRI presents an excellent investment opportunity for those seeking a comfortable and modern home in a rapidly developing area. With its prime location, meticulously planned layout, and quality construction, this project promises a rewarding experience for homeowners and investors alike.

For more information and inquiries, please contact REAL LAND MARK DEVELOPERS LLP at 2330000000.

Note: This essay provides a brief introduction to the VASTUSHRI project. For detailed information about floor plans, pricing, and other project specifics, please contact the developer directly.

New documents listed below were uploaded to the Documents section:

  • 1 Architect’s Certificate on Completion of Project (Form 4)

 

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2024-12-01

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 10 5 100

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Conservation, Rain water Harvesting : 100 RAIN WATER HERVESTING
Electrical Meter Room, Sub-Station, Receiving Station : 100 ELECTRIC METER BOARD
Water Supply : 100 BORE WELL
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 CONNECT TO DRAINAGE
Storm Water Drains : 100 CONNECT TO DRAINAGE

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 59.32 5 4
2BHK 59.39 5 0
2BHK 60.25 5 1
2BHK 62.35 5 4

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 4 Disclosure of sold/ booked inventory
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

New documents listed below were uploaded to the Documents section:

  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 59.32 5 4
2BHK 60.25 5 1
2BHK 62.35 5 4

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Basement(s) and Plinth 100
1 Stilt Floor 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
1 Overall Percentage of Completion of the work done For the entire Building /Wing 84

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [3]
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory [3]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [3]
  • Proforma of Allotment letter