MH
Sangli
P53100016993
RERA ID: P53100016993
Project Name: TRIMURTI NISARG
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2020-09-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Dattanagar, Dattanagar Road, Sangli Miraj Kupwad (M Corp.), Miraj, Sangli-416415

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
S NO 382 HISSA NO 2 PLOT NO 18

Boundaries:
P NO 10
P NO 17N P NO 19
WE
S
ROAD

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 283 sq.mt.
Sanctioned Built-up Area: 401 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 5
No. of Plinths: 1
No. of Stilts: 1
No. of Closed Parking: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 426 sq ft 4 4
2BHK 652 sq ft 4 4
Shop 145 sq ft 2 2
Project Developer:
TRIMURTI DEVELOPERS AND BUILDERS
Organization Type: Partnership

Address: 9516, Utkarshayatan, 100 Feet Road, Nagraj Colony, Nag Temple, Sangli Miraj Kupwad (M Corp.), Miraj, Sangli-416415

Office Phone: +91 23323 00193


Member details:
Member Name Designation
Sunil Nagesh Mhetri Partner
Rajit Balkrishna Ghalsasi Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
SACHIN KANOJE Architect


Projects in the state by this developer:
P53100047952 - Dwait Residency - Sangli
P53100016993 - TRIMURTI NISARG - Sangli
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

An Introduction to Trimurti Nisarg: A New Residential Development in Miraj

Trimurti Nisarg, a new residential project situated in the bustling town of Miraj, Sangli, Maharashtra, is poised to offer a contemporary living experience. Developed by Trimurti Developers and Builders, this project is registered with MahaRERA under the ID P53100016993 and is set for completion by September 30th, 2020.

Nestled in the serene Dattnagar locality, Trimurti Nisarg occupies a prime location in the heart of Miraj. Situated on Plot No. 18, Survey Number 382, Hisssa No. 2, the project enjoys convenient access to essential amenities and infrastructure. Its strategic location ensures residents enjoy a peaceful environment while being close to the vibrant pulse of the city.

Trimurti Nisarg boasts a modern and functional design, encompassing a single building with 5 sanctioned floors, including a stilt floor. The project offers a diverse range of unit configurations to cater to the needs of various families and individuals. These include 4 spacious 1BHK apartments spanning 426 square feet, 4 well-designed 2BHK apartments covering 652 square feet, and 2 commercial shops measuring 145 square feet.

With a focus on creating a comfortable and convenient living experience, Trimurti Nisarg provides a single closed parking space for each unit. The project utilizes a sanctioned FSI of 401, resulting in a total permissible built-up area of 401 square meters.

While specific details about recreational amenities are not provided, the project’s commitment to delivering a comfortable living experience suggests a focus on creating a functional and appealing residential environment.

For those looking to invest in a well-planned and strategically located property in Miraj, Trimurti Nisarg offers a compelling opportunity. The project’s proximity to key amenities, contemporary design, and diverse unit options make it an attractive proposition for both end-users and investors.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 BHK RESI 39.65 4 4
2 BHK RESI 60.59 4 4
COMM SHOP 13.54 2 2

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • 1 Disclosure of sold/ booked inventory
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 1 Architect’s Certificate on Completion of Project (Form 4)
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)
  • 1 Status of Conveyance
  • 1 Declaration about Commencement Certificate
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 BHK RESI 39.65 4 4
2 BHK RESI 60.59 4 4
COMM SHOP 13.54 2 2

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Building Plan Approval (IOD)
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Proforma of Allotment letter [2]