Project Name: Parmar Tiara Palace
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2026-06-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Nalasopara, Ghokhivare, Vasai-Virar City (M Corp), Vasai, Palghar-401208

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
S no 20 H no 4 S no 21 H no 1/2A 1/2B 1/2C 1/2D 2 3 plotB s no 255B 255C/ 1 2 3 4 5 Plot C Old S no. 255 H no. A1A A2B A4B A4C A4A A5A A5B A9 A10 A11 S no 256 H no 4 5 6 7 9 10

Boundaries:
20 M W Proposed D P Road
Recreational GardenN 20 M W D P Road S No 21
WE
S
20 M W Proposed D P Road

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 1295 sq.mt.
Sanctioned Built-up Area: 2142 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 8
No. of Plinths: 1
No. of Stilts: 1
No. of Open Parking: 23
No. of Closed Parking: 7

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 338 to 375 sq ft 34 23
2BHK 478 sq ft 4 3
Shop 98 to 131 sq ft 8 2
Project Developer:
Kailash Buildcon
Organization Type: Partnership

Address: 129/13,, Sita Nivas,, J.P. Road,, Andheri (West),, Opp. Shantawadi,, Andheri, Mumbai Suburban-400058

Office Phone: +91 22255 84957


Member details:
Member Name Designation
Sunil Devilal Pamecha Partner
Pradeepkumar Atmaprasad Chaturvedi Partner
Shankarlal Doongarmal Solanki Authorized Signatory
Nikin Devichand Jain Partner


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
Kailash Buildcon Partnership Area Share
Parmar Build Tech Partnership Area Share


Other Professionals involved:
Professional Name Professional Type
Sanjay Narang Architect
Sanajay S Narang Engineer
MNNY & Associates Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Unveiling Parmar Tiara Palace: A New Residential Haven in Nalasopara

Parmar Tiara Palace, a new residential project registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) under the ID P99000026918, promises to elevate living standards in Nalasopara, Vasai. Developed by Kailash Buildcon, a partnership firm with a strong track record, the project is set to be completed by June 30th, 2026.

Spanning across a 1295 sq. meter plot located in the Ghokhivare locality of Nalasopara, Parmar Tiara Palace comprises a single building encompassing eight floors, including a stilt level. The project boasts a thoughtfully designed layout with a total sanctioned built-up area of 2142 sq. meters, ensuring ample living space for its residents.

The project’s strategic location within Vasai-Virar City (M Corp) offers residents easy access to essential amenities and connectivity. The project’s eastern boundary borders the 20-meter wide DP Road, providing quick access to the bustling city. Furthermore, the project is surrounded by a recreational garden on the west and proposed DP roads on the north and south, ensuring a tranquil and serene environment.

Parmar Tiara Palace offers a variety of amenities to enhance the living experience. These include:

  • Spacious Parking: The project provides 23 open parking spaces for four-wheelers and two-wheelers, as well as 7 closed parking spots.
  • Elevated Living: The eight-storey building with a stilt level offers residents a panoramic view of the surrounding area.

With its strategic location, comprehensive amenities, and commitment to quality construction, Parmar Tiara Palace is poised to become a coveted address in Nalasopara. This project presents an excellent opportunity for families and individuals seeking a comfortable and convenient lifestyle. Interested parties are encouraged to reach out to Kailash Buildcon at 2225584957 for further details and inquiries.

New documents listed below were uploaded to the Documents section:

  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 1 CERSAI details
  • 1 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

New documents listed below were uploaded to the Documents section:

  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 90
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
1 Overall Percentage of Completion of the work done For the entire Building /Wing 86

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 31.46 8 7
1BHK 32.03 6 5
1BHK 33.97 7 3
1BHK 34.88 5 4
Shop 9.15 2 1

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Solid Waste Management And Disposal : 80 -
Treatment And Disposal Of Sewage And Sullage Water : 80 -
Street Lighting : 80 -
Landscaping & Tree Planting : 80 -
Storm Water Drains : 80 -
Sewerage (Chamber, Lines, Septic Tank , STP) : 80 -
Water Supply : 80 -
Electrical Meter Room, Sub-Station, Receiving Station : 80 -
Water Conservation, Rain water Harvesting : 80 -
Internal Roads & Footpaths : 80 -
Fire Protection And Fire Safety Requirements : 80 -

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 32.03 5 3
1BHK 33.08 1 1
1BHK 33.97 6 1

 

New documents listed below were uploaded to the Documents section:

  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

New documents listed below were uploaded to the Documents section:

  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
1 Overall Percentage of Completion of the work done For the entire Building /Wing 78

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Internal Roads & Footpaths : 30 -
Water Conservation, Rain water Harvesting : 30 -
Fire Protection And Fire Safety Requirements : 30 -
Electrical Meter Room, Sub-Station, Receiving Station : 30 -
Water Supply : 30 -
Sewerage (Chamber, Lines, Septic Tank , STP) : 30 -
Storm Water Drains : 30 -
Landscaping & Tree Planting : 30 -
Street Lighting : 30 -
Solid Waste Management And Disposal : 30 -
Treatment And Disposal Of Sewage And Sullage Water : 30 -
Community Buildings : 100 -

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 31.46 8 6
1BHK 32.6 1 1
1BHK 33.12 4 3
1BHK 33.92 3 3
1BHK 33.97 6 0
1BHK 34.1 2 2
1BHK 34.88 5 3
Shop 9.15 2 0

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [4]
  • Building Plan Approval / NA Order for plotted development [3]
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B [2]
  • Details of encumbrances
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [4]
  • Proforma of Allotment letter [2]