MH
Palghar
P99000024072
RERA ID: P99000024072
Project Name: Sunteck MaxxWorld 1, Tivri, Naigaon East
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-06-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Tivri, Tivari, Vasai, Palghar-401208

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
54/4-1, 54/4-2, 54/6, 54/7-2, 55/2, 55/3, 55/4, 55/5A, 56/1-2, 56/2, 56/3

Boundaries:
30 meter Road and Vasai Diwa Railway Line
30 meter wide RoadN 40 Meter Wide Road
WE
S
Rivulet

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 28201 sq.mt.
Sanctioned Built-up Area: 69058 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 9
No. of Floors sanctioned: 207
No. of Plinths: 9
No. of Stilts: 9
No. of Closed Parking: 115

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 306 sq ft 668 632
2BHK 506 sq ft 730 625
Others 902 to 1797 sq ft 9 0
Project Developer:
Sunteck Realty Limited
Organization Type: Company

Address: 5Th Floor, Sunteck Centre, 37-40 Subhash Road, Vile Parle East, Next To Sbi, Andheri, Mumbai Suburban-400057

Office Phone: +91 22428 77800
Website URL: www.sunteckindia.com


Member details:
Member Name Designation
Atul Madhav Poopal Authorized Signatory
Kamal Shrigopal Khetan Managing Director
Rachana Vipul Hingarajia Company Secretory


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
DDPL GLOBAL INFRASTRUCTURE PRIVATE LIMITED Company Revenue Share
UNICORN INFRAPROJECTS AND ESTATES PRIVATE LIMITED Company Revenue Share


Other Professionals involved:
Professional Name Professional Type
Sandeep Shikre & Associates Architect
Ajay Wade & Associates Architect
Sanjay More Engineer
Nidhi Somani & Co. Chartered Accountant
S G Construction Company Contractor


Projects in the state by this developer:
P99000033218 - Sunteck ONEWorld 4, Tivri, Naigaon East - Palghar
P99000033157 - Sunteck ONEWorld 5, Tivri, Naigaon East - Palghar
P99000033099 - Sunteck ONEWorld 3, Tivri, Naigaon East - Palghar
P99000032855 - Sunteck ONEWorld 1, Tivri, Naigaon East - Palghar
P99000032834 - Sunteck ONEWorld 2, Tivri, Naigaon East - Palghar
P99000027956 - Sunteck MaxxWorld 6, Tivri, Naigaon East - Palghar
P99000024562 - Sunteck MaxxWorld 5, Tivri, Naigaon East - Palghar
P99000024173 - Sunteck MaxxWorld 4, Tivri, Naigaon East - Palghar
P99000024111 - Sunteck MaxxWorld 3, Tivri, Naigaon East - Palghar
P99000024080 - Sunteck MaxxWorld 2, Tivri, Naigaon East - Palghar
…and 7 more
Litigations

Active Litigations related to the project ? Yes

Cases
Court Name Case Number Case Type Petition Name Year Present Status
NCLT 127 of 2019 Civil Other 2019 Pending
Complaints

Complaint No Complainant Name
CC006000000196328 Shalini Shirodkar
CC006000000199320 Kajal Singh
CC006000000198125 Sushant Suresh Lolikar
CC006000000292374 AKASH DEENANATH GIRI
CC006000000292374 VIKASH DEENANATH GIRI
CC006000000194056 dharmendra pandey
CC006000000395739 Daniel Eliyas Allam
CC006000000396609 Sunteck Realty Limited
CC006000000396609 DDPL Global Infrastructure Private Limited
CC006000000396609 Unicorn Infrastructure and Estate Private Limited
CC006000000396995 Sunteck Realty Limited
CC006000000396995 DDPL Global Infrastructure Private Limited
CC006000000396995 Unicorn Infrastructure and Estate Pvt. Ltd
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Sunteck MaxxWorld 1: A New Residential Development in Tivri, Naigaon East

Sunteck Realty Limited, a reputable real estate developer in India, is launching a new residential project, Sunteck MaxxWorld 1, in the burgeoning locality of Tivri, Naigaon East, Maharashtra. Registered under RERA ID P99000024072, this project promises to be a landmark development, offering residents a modern and comfortable lifestyle.

Location and Amenities:

Sunteck MaxxWorld 1 is strategically located in Tivri, a rapidly developing suburb of Mumbai, offering easy access to the Vasai Diwa Railway Line and major road networks. Surrounded by a 40-meter wide road to the east and a 30-meter wide road to the west, the project benefits from excellent connectivity. With a total plot area of 28201 sq. meters, the project encompasses 9 buildings, each rising to 207 floors, offering a multitude of residential units. The project also features 115 closed parking spaces, ensuring convenient parking for residents.

Project Details:

The project is currently under construction with an expected completion date of June 30th, 2025. Sunteck Realty Limited has obtained the necessary approvals and sanctions for the project, including a sanctioned FSI of 69058, leading to a permissible built-up area of 69058 sq. meters. The project also includes a considerable amount of open space, although details on the specific amenities provided are not available in the provided information.

Transparency and Legal Information:

While the project is currently in its early stages of development, it is important to note that there are litigations related to the project. Potential buyers should exercise due diligence and carefully review all project-related documents before making any investment decisions. Further information about the project and its legal status can be accessed via the provided RERA ID and the developer’s website, www.sunteckindia.com.

Conclusion:

Sunteck MaxxWorld 1 promises to be a significant residential development in Tivri, offering modern amenities and strategic location advantages. However, potential investors should be aware of the existing litigations and thoroughly investigate all project details before making a decision. The project’s location, developer’s reputation, and potential for future appreciation in the Tivri region make it a compelling option for those seeking a new home in the vibrant Mumbai suburbs.

New complaints added under Complaints section

Complaint No Complainant Name
CC006000000396995 Unicorn Infrastructure and Estate Pvt. Ltd
CC006000000396995 DDPL Global Infrastructure Private Limited
CC006000000396995 Sunteck Realty Limited

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 28.44 668 632
2BHK 47.03 730 625

 

New documents listed below were uploaded to the Documents section:

  • 2 Architect’s Certificate on Completion of Project (Form 4)
  • 1 Architect’s Certificate on Completion of Project (Form 4)

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 84.6
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 83.6
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 83.6
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
4 Overall Percentage of Completion of the work done For the entire Building /Wing 83.6
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
5 Overall Percentage of Completion of the work done For the entire Building /Wing 83.6
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
6 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
6 Overall Percentage of Completion of the work done For the entire Building /Wing 83.6
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 45
7 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
7 Overall Percentage of Completion of the work done For the entire Building /Wing 84.1
8 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
8 Overall Percentage of Completion of the work done For the entire Building /Wing 83.4
9 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
9 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 35
9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
9 Overall Percentage of Completion of the work done For the entire Building /Wing 83

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Treatment And Disposal Of Sewage And Sullage Water : 90 In Progress
Community Buildings : 85 In Progress
Landscaping & Tree Planting : 75 Work not Started
Solid Waste Management And Disposal : 90 In Progress
Internal Roads & Footpaths : 85 In Progress
Water Conservation, Rain water Harvesting : 90 In Progress

 

New documents listed below were uploaded to the Documents section:

  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

New complaints added under Complaints section

Complaint No Complainant Name
CC006000000396609 Sunteck Realty Limited
CC006000000396609 Unicorn Infrastructure and Estate Private Limited
CC006000000396609 DDPL Global Infrastructure Private Limited
CC006000000395739 Daniel Eliyas Allam

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 28.44 752 713
2BHK 47.03 822 697

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 Work Completed
Storm Water Drains : 98 In Progress
Landscaping & Tree Planting : 55 Work not Started
Street Lighting : 50 Work not Started
Water Supply : 95 In Progress
Fire Protection And Fire Safety Requirements : 90 In Progress
Electrical Meter Room, Sub-Station, Receiving Station : 80 In Progress
Internal Roads & Footpaths : 80 In Progress

 

New documents listed below were uploaded to the Documents section:

  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 2
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
1 Overall Percentage of Completion of the work done For the entire Building /Wing 77.3
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 1
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
2 Overall Percentage of Completion of the work done For the entire Building /Wing 77.2
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 19
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
3 Overall Percentage of Completion of the work done For the entire Building /Wing 79
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 22
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
4 Overall Percentage of Completion of the work done For the entire Building /Wing 79.3
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 8
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 93
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
5 Overall Percentage of Completion of the work done For the entire Building /Wing 77.2
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 17
6 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
6 Overall Percentage of Completion of the work done For the entire Building /Wing 78.8
7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 26
7 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
7 Overall Percentage of Completion of the work done For the entire Building /Wing 79.7
8 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 94
8 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 2
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
8 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
8 Overall Percentage of Completion of the work done For the entire Building /Wing 77.1
9 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 88
9 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 4
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
9 Overall Percentage of Completion of the work done For the entire Building /Wing 76.7

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [15]
  • Building Plan Approval / NA Order for plotted development
  • Commencement Certificates / NA Order for plotted development [24]
  • Copy of Layout Approval (in case of layout) [2]
  • Copy of the legal title report [10]
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances [3]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) [6]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [3]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [10]
  • Proforma of Allotment letter
  • Status of Formation of Legal Entity (Society/Co Op etc.)