MH
Nagpur
P50500049820
RERA ID: P50500049820
Project Name: CHHAYA ENCLAVE - I
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-06-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Narsala, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440034

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
Plot No. 1, Kh. No. 159/2, C.T.S. No. 159/2/1, NMC House No. 159/2/1,

Boundaries:
Khasra
Existing RoadN Road
WE
S
Wide Road

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 528 sq.mt.
Sanctioned Built-up Area: 1152 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 4
No. of Plinths: 1
No. of Open Parking: 39

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 7703 sq ft 12 0
Shop 810 sq ft 5 0
Project Developer:
MOHAN RAVINDRA CHIMURKAR c/o RAVINDRA NILKANTRAO CHIMURKAR
Organization Type: Individual

Address: A-2, -, Wardha Road, Chintamani Nagar, Somalwad, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440022

Office Phone: +91 80557 76421


Other Professionals involved:
Professional Name Professional Type
K P Shinde Engineer
K P Shinde Architect
VIJAY T BULDEO Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Chhaya Enclave I: A Prime Residential Haven

In the burgeoning metropolis of Nagpur, nestled amidst the tranquility of Narsala, is a new residential masterpiece that is set to redefine urban living. Chhaya Enclave I, a project by a renowned developer, is a testament to architectural excellence and unwavering commitment to creating dream homes.

With its strategically selected location, Chhaya Enclave I offers seamless connectivity to essential amenities, including educational institutions, healthcare facilities, and shopping destinations. The project boasts a spacious plot area of 528 square meters, ensuring ample green spaces and recreational areas.

The project features a single, meticulously designed building with four well-planned floors. Each floor offers a variety of spacious units, including 12 exquisite 2BHK apartments and 5 conveniently located shops. The 2BHK apartments boast a generous 7703 square feet of living space, providing ample room for families and individuals alike. The shops, measuring 810 square feet, are ideal for entrepreneurs seeking a prime location for their businesses.

Chhaya Enclave I adheres to the highest standards of construction and design. The building is designed to withstand the test of time, with durable materials and earthquake-resistant features. The project also features a host of modern amenities, including dedicated parking spaces for both four-wheelers and two-wheelers, ensuring convenience and peace of mind for residents.

The project has received the coveted RERA approval (P50500049820), assuring buyers of its legitimacy and transparency. Additionally, it is scheduled for completion within a reasonable timeframe, allowing purchasers to move into their dream homes sooner.

With its prime location, spacious units, thoughtful amenities, and commitment to quality, Chhaya Enclave I is an exceptional investment opportunity for discerning homebuyers and savvy investors. Its blend of comfort, convenience, and affordability makes it an ideal destination for those seeking a harmonious balance between urban living and tranquil surroundings.

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Architect’s Certificate on Completion of Project (Form 4)
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 715.72 12 0
Shop 75.34 5 0

 

Sanctioned FSI of the project applied for registration (Sanctioned Built-up Area) field under Firm Details section updated with new value 1152.07

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Electrical Meter Room, Sub-Station, Receiving Station : 50 AS PER SANCTION
Landscaping & Tree Planting : 100 AS PER SANCTION

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
1 Overall Percentage of Completion of the work done For the entire Building /Wing 88.5

 

New documents listed below were uploaded to the Documents section:

  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 Stilt Floor 80
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
1 Overall Percentage of Completion of the work done For the entire Building /Wing 84

 

New documents listed below were uploaded to the Documents section:

  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 1 Disclosure of sold/ booked inventory
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 2 Building Plan Approval / NA Order for plotted development
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Commencement Certificates / NA Order for plotted development
  • 2 Commencement Certificates / NA Order for plotted development
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [2]
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate [2]
  • Declaration in FORM B
  • Deviation Report with respect to Allotment letter
  • Deviation Report with respect to model copy of Agreement
  • Disclosure of Interest in Other Real Estate Organizations
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) [2]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [3]
  • Other – Legal
  • Proforma of Agreement for sale [2]
  • Proforma of Allotment letter
  • a Details of encumbrances concerned to Finance
  • b Details of encumbrances concerned to Legal