Project Name: GOVIND RESIDENCY-I
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-12-31
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Nara, Koradi Road, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440026

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
PLOT NO 3 & 4 KHASRA NO 145 (145/1) CTS NO 401, MOUZA NARA

Boundaries:
OTHER LAYOUT
ROADN ROAD
WE
S
OTHER LAYOUT

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 1059 sq.mt.
Sanctioned Built-up Area: 2961 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 6
No. of Plinths: 1
No. of Stilts: 1
No. of Open Parking: 1
No. of Closed Parking: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 640 sq ft 6 6
3BHK 876 to 883 sq ft 24 14
Project Developer:
BHAVYA INFRAVENTURES PRIVATE LIMITED
Organization Type: Company

Address: F-8C, Achraj Towers-Ii, Chhaoni, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440013

Office Phone: +91 70203 87041


Member details:
Member Name Designation
MURLIDHAR GOVINDRAM WADHWANI Authorized Signatory
MURLIDHAR GOVINDRAM WADHWANI Director


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
RAM GOVINDRAM WADHWANI Individual Revenue Share
MANJU RAM WADHWANI Individual Revenue Share


Other Professionals involved:
Professional Name Professional Type
LOKES KADU Architect
MURLIDHAR WADHWANI Engineer
ANKIT TALREJA Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Govind Residency-I: A New Residential Project in the Heart of Nagpur

Govind Residency-I, a new residential project located in Nara, Nagpur, promises a comfortable and convenient lifestyle for its residents. Developed by Bhavya Infraventures Private Limited, this project offers a unique opportunity to own a piece of prime real estate in one of the city’s most desirable locations.

The project, registered with MahaRERA under the ID P50500034342, is situated on Plot No 3 & 4, Khasra No 145 (145/1), CTS No 401, Mouza Nara. Its strategic location on Koradi Road, surrounded by other layouts and roads, ensures easy access to all essential amenities. The project is expected to be completed by December 31st, 2025, with no reported litigations.

Govind Residency-I: Key Features:

  • Spacious Apartments: The project will feature a single building with seven floors and one stilt. Residents can enjoy well-designed apartments with an abundance of natural light and ventilation.
  • Convenient Parking: The project offers limited parking options with one open parking space and one closed parking space available for each apartment.
  • Prime Location: Situated in Nara, Nagpur, the project boasts proximity to essential amenities such as schools, hospitals, shopping malls, and public transportation.
  • Reputable Developer: Bhavya Infraventures Private Limited, a reputable company known for its commitment to quality and timely delivery, is behind this project.
  • Secure Investment: The project’s strategic location, coupled with the developer’s reputation, makes it a promising investment opportunity.

Govind Residency-I is an excellent choice for those seeking a comfortable and modern lifestyle in a prime location. The project offers a combination of convenience, accessibility, and value, making it an attractive option for families and individuals alike.

For further inquiries and booking details, please contact:

Bhavya Infraventures Private Limited Office Number: 7020387041

Note: While this essay provides a concise overview of the project, potential buyers are encouraged to conduct thorough research and consult with experts before making any investment decisions.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 59.49 6 6
3BHK 81.41 6 3
3BHK 81.92 6 4
3BHK 82.04 6 4
3BHK 82.05 6 3

 

New documents listed below were uploaded to the Documents section:

  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 9 Disclosure of sold/ booked inventory

 

Number of Sanctioned Floors field under Building/Plot Details section updated with new value 6

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Storm Water Drains : 100 AS PER SANCTIONED PLAN
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 AS PER SANCTIONED PLAN
Water Supply : 100 BOREWELL/NMC WATER A FTER OC
Electrical Meter Room, Sub-Station, Receiving Station : 100 ELECTRIC PANEL SHALL BE PROVIDED
Fire Protection And Fire Safety Requirements : 100 AS PER SANCTIONED PLAN
Energy management : 100 AS PER SANCTIONED PLAN
Water Conservation, Rain water Harvesting : 100 AS PER SANCTIONED PLAN
Landscaping & Tree Planting : 100 AS PER SANCTIONED PLAN

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

New documents listed below were uploaded to the Documents section:

  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 7 Disclosure of sold/ booked inventory
  • 8 Disclosure of sold/ booked inventory
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 59.49 6 5
3BHK 82.05 6 1

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
3BHK 81.41 6 3
3BHK 82.04 6 3

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 92
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 88
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 82
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 55
1 Overall Percentage of Completion of the work done For the entire Building /Wing 81.2

 

New documents listed below were uploaded to the Documents section:

  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Energy management : 55 AS PER SANCTIONED PLAN
Water Conservation, Rain water Harvesting : 45 AS PER SANCTIONED PLAN
Sewerage (Chamber, Lines, Septic Tank , STP) : 75 AS PER SANCTIONED PLAN
Water Supply : 72 BOREWELL/NMC WATER A FTER OC
Electrical Meter Room, Sub-Station, Receiving Station : 62 ELECTRIC PANEL SHALL BE PROVIDED
Fire Protection And Fire Safety Requirements : 45 AS PER SANCTIONED PLAN
Storm Water Drains : 70 AS PER SANCTIONED PLAN
Landscaping & Tree Planting : 10 AS PER SANCTIONED PLAN

 

New documents listed below were uploaded to the Documents section:

  • 4 Disclosure of sold/ booked inventory
  • 5 Disclosure of sold/ booked inventory
  • 6 Disclosure of sold/ booked inventory
  • 3 Disclosure of sold/ booked inventory
  • 2 Disclosure of sold/ booked inventory
  • 1 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 59.49 6 1
3BHK 81.41 6 1
3BHK 81.92 6 4
3BHK 82.04 6 2

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [8]
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Proforma of Allotment letter [2]