RERA ID: P50500031555
Project Name: WADHWANI BLISS BY R SANDESH GROUP
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2026-09-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
New Colony, Byramji Town, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440013

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
PLOT NO. 5B/6/6C, CTS NO 1842

Boundaries:
NALLAH
CEMENTARY ROAD -PARTN PLOT NO 5C and 5D
WE
S
PART OF PLOT NO 5A AND 6B

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 3678 sq.mt.
Sanctioned Built-up Area: 17245 sq.mt.
Recreational Open Space: 852 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 28
No. of basements: 1
No. of Plinths: 1
No. of Podiums: 1
No. of Stilts: 1
No. of Closed Parking: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
4BHK 2231 sq ft 25 17
Others 2952 sq ft 25 17
Project Developer:
CHANDRA LAXMI INFRASTRUCTURE LLP
Organization Type: Partnership

Address: Corporation House 512, Empress Villa, Bayramji Town, New Colony, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440013

Office Phone: +91 70203 87041


Member details:
Member Name Designation
DILIP PRALHADRAI AGRAWAL Partner
RAMDEO PRALHADRAI AGRAWAL Partner
RAKESH OMPRAKASH HEMRAJANI Partner
RAJESH TAWARLAL CHHABRANI Partner
RUCHIR KUMAR AGRAWAL Partner
AMIT GOVINDPRASAD AGRAWAL Partner
SHRADDHA RAMDEO AGRAWAL Partner
PRADEEP OMPRAKASH PANJWANI Partner


Other Professionals involved:
Professional Name Professional Type
PRANAV AJAY LAKHOTIYA Architect
ADITYA WADHVA Engineer
CA AMIT RAJA Chartered Accountant
PURUSHOTTAM PATANKAR Other Professional
ADV SANDEEP SHASTRI Other Professional
CA ANKIT TALREJA Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Wadhvani Bliss by R Sandesh Group: A New Residential Oasis in Nagpur

Nestled in the heart of Nagpur’s vibrant New Colony, Wadhvani Bliss by R Sandesh Group is a new residential project poised to redefine luxurious living. With RERA ID P50500031555, this project assures transparency and accountability throughout its development.

Wadhvani Bliss is a testament to meticulous planning and quality construction, offering a unique blend of modern living and convenience. Developed by Chandra Laxmi Infrastructure LLP, a reputable partnership firm, the project boasts a single building spanning across a generous plot of 3678 square meters.

Prime Location and Connectivity:

Located in the sought-after New Colony area, Wadhvani Bliss enjoys excellent connectivity to various parts of the city. The project’s strategic positioning ensures easy access to major roadways, public transport options, and key commercial hubs. Its proximity to essential amenities like schools, hospitals, and shopping centers further enhances the appeal of this residential haven.

Modern Amenities for a Luxurious Lifestyle:

Wadhvani Bliss is designed to elevate the quality of life for its residents. The project incorporates a range of modern amenities, including:

  • Spacious Apartments: Offering a wide variety of configurations to cater to diverse needs.
  • Generous Open Spaces: With a dedicated 852 square meter recreational open space, residents can enjoy serene moments amidst lush greenery.
  • State-of-the-Art Infrastructure: Including 1 basement, 1 plinth, 1 podium, 28 floors, and 1 stilt, ensuring a comfortable and modern living experience.
  • Secure Parking: With 1 closed parking space, residents can rest assured about the safety of their vehicles.

A Promise of Quality and Trust:

Wadhvani Bliss by R Sandesh Group is a project backed by years of experience and commitment to delivering exceptional living spaces. The project is overseen by Chandra Laxmi Infrastructure LLP, ensuring that every aspect, from construction to amenities, adheres to the highest standards of quality and safety.

Investment Opportunity:

Wadhvani Bliss presents a unique investment opportunity in one of Nagpur’s most desirable locations. The project’s strategic location, high-quality construction, and comprehensive amenities ensure a high return on investment for discerning buyers.

With its prime location, modern amenities, and unwavering commitment to quality, Wadhvani Bliss by R Sandesh Group is set to redefine luxurious living in Nagpur. It promises a harmonious blend of convenience, comfort, and an unparalleled lifestyle experience.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
4BHK WITH SERV. ROOM 207.28 25 17
6BHK WITH SERV. ROOM 274.33 25 17

 

There are additions/modifications under Professionals section

Professional Name Professional Type
CA ANKIT TALREJA Chartered Accountant

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 82
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 60
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
1 Overall Percentage of Completion of the work done For the entire Building /Wing 78.7

 

New documents listed below were uploaded to the Documents section:

  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Fire Protection And Fire Safety Requirements : 15 As per sanction plan
Electrical Meter Room, Sub-Station, Receiving Station : 18 As per sanction plan
Water Supply : 55 As per sanction plan
Sewerage (Chamber, Lines, Septic Tank , STP) : 60 As per sanction plan
Storm Water Drains : 55 As per sanction plan
Water Conservation, Rain water Harvesting : 42 As per sanction plan

 

New documents listed below were uploaded to the Documents section:

  • 2 Declaration in FORM B
  • 3 Declaration in FORM B
  • 3 a Details of encumbrances concerned to Finance
  • 1 b Details of encumbrances concerned to Legal
  • 2 Details of encumbrances

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
4BHK WITH SERV. ROOM 207.28 25 17
6BHK WITH SERV. ROOM 274.33 25 17

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Conservation, Rain water Harvesting : 38 As per sanction plan
Electrical Meter Room, Sub-Station, Receiving Station : 15 As per sanction plan
Storm Water Drains : 45 As per sanction plan
Fire Protection And Fire Safety Requirements : 7 As per sanction plan
Water Supply : 52 As per sanction plan
Sewerage (Chamber, Lines, Septic Tank , STP) : 50 As per sanction plan

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 15
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 55
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 15
1 Overall Percentage of Completion of the work done For the entire Building /Wing 76

 

New documents listed below were uploaded to the Documents section:

  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
4BHK WITH SERV. ROOM 207.28 25 22

 

New documents listed below were uploaded to the Documents section:

  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 10
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 72
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 52
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
1 Overall Percentage of Completion of the work done For the entire Building /Wing 73.4

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Storm Water Drains : 42 As per sanction plan
Electrical Meter Room, Sub-Station, Receiving Station : 10 As per sanction plan
Fire Protection And Fire Safety Requirements : 5 As per sanction plan
Water Conservation, Rain water Harvesting : 35 As per sanction plan
Sewerage (Chamber, Lines, Septic Tank , STP) : 42 As per sanction plan
Water Supply : 45 As per sanction plan

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [4]
  • Building Plan Approval / NA Order for plotted development [5]
  • CERSAI details [2]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) [4]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [4]
  • Proforma of Allotment letter [2]
  • Status of Formation of Legal Entity (Society/Co Op etc.)