RERA ID: P50500029945
Project Name: Shiv Kailasa Phase II
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2026-12-25
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Opp. Aiims, Mihan, Nagpur, Plot No. 237/1, 238/1, 238/2, 239, 241, 242, 247/1, Mouza - Sondapar, Taluka - Hingna, Distt. - Nagpur - 441108, Sondapar, Hingna, Nagpur-441108

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
Plot No. 237/1, 238/1, 238/2, 239, 241, 242, 247/1, Mouza -Sondapar, Kh. No. 70/2, 71/2,72/2, 73/2, 74/2, 75/2, 76/1/A/2, 76/1/B/2, 76/2/B, 76/3/B/1, 76/3/B/2, Village - Sondapar, Taluka - Hingna, Distt. - Nagpur

Boundaries:
Another Layout
Existing MIHAN RoadN 18 Mtr Wide Road
WE
S
18 Mtr Wide Road

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 64992 sq.mt.
Sanctioned Built-up Area: 149903 sq.mt.
Recreational Open Space: 13398 sq.mt.
No. of Buildings sanctioned: 23
No. of Floors sanctioned: 414
No. of basements: 23
No. of Plinths: 23
No. of Stilts: 23
No. of Open Parking: 1554
No. of Closed Parking: 1553

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 819 to 851 sq ft 972 171
3BHK 1073 to 2101 sq ft 439 212
Project Developer:
Om Shivam Buildcon Private Limited
Organization Type: Company

Address: First Floor, Plot No. 10, Rohera Arcade, Nmc House No. 560-A-10, Wardha Road, Ajni, Ajni Square, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440015

Office Phone: +91 71222 29721
Website URL: www.osbpl.com


Member details:
Member Name Designation
Pramod Kisanrao Kapse Managing Director
Chandrashekar Kisanrao Kapse Managing Director
Ravindra Kisanrao Kapse Authorized Signatory


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
Kisanrao Mahadeorao Kapse Individual Area Share
Suruyakanta Kisanrao Kapse Individual Area Share
Ravindra KIsanrao Kapse Individual Area Share
Pallavi Ravindra Kapse Individual Area Share
PramodKisanrao Kapse Individual Area Share
Vaishali Pramod Kapse Individual Area Share
Chandrashekhar Kisanrao Kapse Individual Area Share
LaxmiChandrashekhar Kapse Individual Area Share


Other Professionals involved:
Professional Name Professional Type
Rishi Lashkare Chartered Accountant
Arch Sachin Sutar Architect
Anil Deshmukh Engineer


Projects in the state by this developer:
P50500029945 - Shiv Kailasa Phase II - Nagpur
P50500024271 - Shiv Brighton Phase III - Nagpur
P50500024193 - Shiv Brighton Phase IV - Nagpur
P50500018424 - Shiv Kailasa Phase I - Nagpur
P50500017835 - Shiv Elite Phase IV Geranium - Nagpur
P50500009639 - Shiv Elite Phase I - Nagpur
P50500009553 - Shiv Elite Phase IV - Nagpur
P50500007132 - Shiv Elite Phase II - Nagpur
P50500006295 - Shiv Brighton Phase II - Nagpur
P50500006203 - Shiv Brighton Phase I - Nagpur
…and 1 more
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Shiv Kailasa Phase II: An Epitome of Modern Living in Nagpur

Shiv Kailasa Phase II, a new residential project by Om Shivam Buildcon Private Limited, promises to redefine urban living in Nagpur. Situated in a prime location opposite AIIMS and MIHAN, this project offers a unique blend of luxury, convenience, and green spaces, making it an ideal choice for discerning homebuyers.

Spanning across a sprawling 64,992 sq. mtrs, Shiv Kailasa Phase II boasts an impressive array of 23 buildings, each meticulously designed to maximize comfort and functionality. The project offers a diverse range of units, including 966 spacious 2BHK apartments ranging from 819 to 851 sq. ft. and 439 well-appointed 3BHK apartments spanning 1073 to 2101 sq. ft., catering to varied lifestyle needs.

A Paradise for Residents:

The project emphasizes resident well-being with an extensive array of amenities. With a total of 414 floors, including 23 basements and 23 stilts, the project offers an abundance of space. The thoughtfully designed layout ensures a seamless flow of natural light and ventilation within every unit. The ample open and closed parking facilities, with a combined total of 3107 spots (1554 open + 1553 closed), ensure the convenience of every resident.

Embracing Sustainability:

Shiv Kailasa Phase II aligns with modern sustainability standards by incorporating a significant recreational open space of 13,398 sq. mtrs., promoting a healthy and vibrant community. This green expanse serves as a haven for relaxation and recreation, offering residents a respite from the urban hustle and bustle.

A Secure and Transparent Investment:

The project is registered with MahaRERA under the ID P50500029945, ensuring transparency and security for investors. With a completion date projected for December 25th, 2026, and no reported litigations, Shiv Kailasa Phase II offers a reliable and promising investment opportunity.

A Prime Location:

The strategic location of Shiv Kailasa Phase II in Sondapar, close to the bustling AIIMS and MIHAN, guarantees easy access to essential amenities, healthcare facilities, educational institutions, and employment hubs. This prime location adds immense value to the project, ensuring a comfortable and fulfilling lifestyle for residents.

A Dream Home Awaits:

Shiv Kailasa Phase II is not just an apartment complex; it is a testament to meticulous planning, modern amenities, and a commitment to sustainability. It represents a unique opportunity to own a piece of the thriving city of Nagpur, where every resident can enjoy a comfortable, convenient, and enriching lifestyle.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 76.09 32 19
2BHK 76.3 64 20
2BHK 76.32 16 14
2BHK 76.33 24 8
2BHK 76.67 24 8
2BHK 76.88 8 8
2BHK 76.89 62 28
2BHK 76.91 46 14
2BHK 78.3 8 2
2BHK 78.32 8 0
2BHK 78.34 88 3
2BHK 78.51 8 0
2BHK 78.69 8 0
2BHK 78.7 240 25
2BHK 78.71 8 1
2BHK 78.74 80 0
2BHK 78.9 8 0
2BHK 79.05 16 0
2BHK 79.08 224 21
3BHK 100.05 64 10
3BHK 100.08 32 10
3BHK 100.14 56 14
3BHK 100.17 11 8
3BHK 100.35 21 8
3BHK 100.68 21 8
3BHK 104.82 24 15
3BHK 104.88 24 15
3BHK 105.23 47 47
3BHK 105.26 24 7
3BHK 105.29 20 17
3BHK 105.32 24 8
3BHK 105.8 27 25
3BHK 195.25 1 1
3BHK 99.76 32 11
3BHK 99.84 11 8

 

New documents listed below were uploaded to the Documents section:

  • 3 Disclosure of sold/ booked inventory
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 30 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 29 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 28 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 27 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 26 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 25 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Landscaping & Tree Planting : 0 Work In progress
Street Lighting : 0 Work In progress
Treatment And Disposal Of Sewage And Sullage Water : 100 Work In progress
Open Parking : 0 Work In progress
Electrical Meter Room, Sub-Station, Receiving Station : 0 Work In progress
Internal Roads & Footpaths : 0 Work In progress
Energy management : 0 Work In progress
Aggregate area of recreational Open Space : 0 Work In progress

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
3BHK 99.84 11 8
3BHK 100.05 64 10
3BHK 100.35 21 8

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 90
1 X number of Basement(s) and Plinth 50
1 X number of Slabs of Super Structure 15
1 Overall Percentage of Completion of the work done For the entire Building /Wing 15.5
2 Excavation 90
2 X number of Basement(s) and Plinth 50
2 X number of Slabs of Super Structure 15
2 Overall Percentage of Completion of the work done For the entire Building /Wing 15.5

 

New documents listed below were uploaded to the Documents section:

  • 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 21 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 22 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 23 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 24 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Disclosure of sold/ booked inventory
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 76.09 32 19
2BHK 76.3 64 20
2BHK 76.32 16 14
2BHK 76.33 24 8
2BHK 76.66 8 4
2BHK 76.67 24 8
2BHK 76.88 8 8
2BHK 76.89 48 14
2BHK 76.91 46 14
2BHK 78.69 8 0
2BHK 78.7 240 18
2BHK 78.71 8 0
2BHK 79.08 224 13
3BHK 99.76 32 11
3BHK 100.14 56 17
3BHK 100.35 21 7
3BHK 100.68 21 8
3BHK 104.82 24 3
3BHK 104.88 24 5
3BHK 105.23 47 46
3BHK 105.29 20 12
3BHK 105.32 24 8
3BHK 195.25 1 0

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
12 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 15
12 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
12 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
12 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
13 X number of Slabs of Super Structure 75
13 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
13 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 15
13 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 15
13 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
13 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
13 Overall Percentage of Completion of the work done For the entire Building /Wing 34
14 X number of Slabs of Super Structure 75
14 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
14 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10
14 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
14 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
15 X number of Slabs of Super Structure 75
15 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
15 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
15 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 15
15 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
15 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
15 Overall Percentage of Completion of the work done For the entire Building /Wing 33
16 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
16 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 15
16 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
16 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
16 Overall Percentage of Completion of the work done For the entire Building /Wing 33
17 X number of Slabs of Super Structure 55
17 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 32
17 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
17 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 15
17 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
17 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 4
17 Overall Percentage of Completion of the work done For the entire Building /Wing 29.6
18 X number of Slabs of Super Structure 55
18 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
18 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
18 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 15
18 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
18 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
18 Overall Percentage of Completion of the work done For the entire Building /Wing 29
19 X number of Slabs of Super Structure 50
19 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
19 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 15
19 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
19 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
19 Overall Percentage of Completion of the work done For the entire Building /Wing 28.5
20 X number of Slabs of Super Structure 55
20 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
20 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
20 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
20 Overall Percentage of Completion of the work done For the entire Building /Wing 28.5
21 X number of Slabs of Super Structure 45
21 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
21 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
21 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
21 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
21 Overall Percentage of Completion of the work done For the entire Building /Wing 27
22 X number of Slabs of Super Structure 45
22 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
22 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
22 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 15
22 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
22 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
22 Overall Percentage of Completion of the work done For the entire Building /Wing 27.5
23 X number of Slabs of Super Structure 35
23 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
23 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
23 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10
23 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 5
23 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 5
23 Overall Percentage of Completion of the work done For the entire Building /Wing 26

 

New documents listed below were uploaded to the Documents section:

  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Disclosure of sold/ booked inventory

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [15]
  • Building Plan Approval / NA Order for plotted development [34]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report [5]
  • Declaration about Commencement Certificate [2]
  • Declaration in FORM B
  • Details of encumbrances [2]
  • Deviation Report with respect to Allotment letter
  • Deviation Report with respect to model copy of Agreement
  • Disclosure of Interest in Other Real Estate Organizations [3]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [5]
  • Proforma of Allotment letter [2]
  • a Details of encumbrances concerned to Finance [2]
  • b Details of encumbrances concerned to Legal [2]