MH
Nagpur
P50500019753
RERA ID: P50500019753
Project Name: SHASHIKALA NIWAS
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2022-03-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Besa House No 53, P H No 38-A, Besa Road, Besa, Nagpur (Rural), Nagpur-440034

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
GAOTHAN HOUSE NO 53

Boundaries:
24 MTR WIDE ROAD
6 MTR WIDE ROADN HOUSE of SHENDE
WE
S
LANE

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 315 sq.mt.
Sanctioned Built-up Area: 470 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 5
No. of Plinths: 1
No. of Open Parking: 1
No. of Closed Parking: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Others 352 to 495 sq ft 12 12
Shop 168 to 175 sq ft 2 2
Project Developer:
RAJ CREATION
Organization Type: Partnership

Address: Plot No 1, Om Shiv Sai Housing Society, Manewada Road, Banait Complex, Besa Square, Besa, Nagpur (Rural), Nagpur-440034

Office Phone: +91 99227 32621


Member details:
Member Name Designation
SANJAY GULBARAO BANAIT Authorized Signatory
ANIL GULABRAO BANAIT Partner
SURAJ MANOHAR KAPARTIWAR Partner
VIJAY WASUDEORAO KARWATKAR Partner


Other Professionals involved:
Professional Name Professional Type
NITIN B DANDEKAR Architect


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing the Serene Oasis of Shashikala Niwas: A Haven in the Heart of Besa

Nestled amidst the vibrant tapestry of Besa, SHASHIKALA NIWAS, a newly launched real estate project by the esteemed RAJ CREATION, offers a sanctuary of tranquility and convenience. Registered under the Maharashtra Real Estate Regulatory Authority (RERA) with ID P50500019753, this project promises peace of mind and a seamless homebuying experience.

The project encompasses a single building with 5 meticulously planned floors, offering a range of meticulously designed units to suit diverse lifestyles. The property boasts 12 elegantly appointed residential units, ranging from 352 to 495 square feet, and 2 seamlessly designed shops, measuring between 168 and 175 square feet. Each unit is meticulously crafted with an emphasis on space optimization, natural light, and ventilation.

Conveniently located on BESA ROAD, Besa House No. 53, P.H. No. 38-A, Nagpur - 440034, Shashikala Niwas enjoys excellent connectivity to essential amenities. The project’s strategic location ensures easy access to schools, hospitals, shopping centers, and public transportation.

The project boasts a host of amenities to enhance the comfort and well-being of its residents. The ground floor features dedicated open and closed parking spaces for both four-wheelers and two-wheelers, ensuring hassle-free parking. The building’s aesthetics and structural integrity are meticulously maintained by a dedicated maintenance staff.

Shashikala Niwas is committed to sustainability and mindful living. The project adheres to the principles of eco-friendly construction, utilizing energy-efficient materials and practices to minimize its environmental impact. This commitment ensures a healthier and more responsible living environment for future generations.

With a projected completion date of March 30, 2022, Shashikala Niwas offers a unique opportunity to invest in a prime residential property in the flourishing Besa neighborhood. Its meticulously planned units, convenient location, and thoughtful amenities make it an ideal haven for families, professionals, and investors alike.

New documents listed below were uploaded to the Documents section:

  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Architect’s Certificate on Completion of Project (Form 4)
  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 1 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
Flat1 46.02 4 4
SHOP 1 15.61 1 1
SHOP 2 16.26 1 1
flat2 45.83 4 4
flat3 32.77 4 4

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 X number of Podiums 100
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 100

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 COMPLETED
Open Parking : 100 COMPLETED
Water Supply : 100 COMPLETED

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Building Plan Approval (IOD)
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report [3]
  • Declaration in FORM B
  • Details of encumbrances
  • Proforma of Allotment letter