MH
Kolhapur
P53000021963
RERA ID: P53000021963
Project Name: Kedar Infra Housing
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2022-12-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Phulewadi, A Ward, Kolhapur (M Corp.), Karvir, Kolhapur-416010

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
R S No 1205/1/C

Boundaries:
Property of Vilas Nikam out of R S No 1205-1-C
R S No 1205-1-BN Road and R S No 1204-1-7
WE
S
R S No 1204-1-7

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 1125 sq.mt.
Sanctioned Built-up Area: 895 sq.mt.
Recreational Open Space: 400 sq.mt.
No. of Buildings sanctioned: 13
No. of Floors sanctioned: 26
No. of Plinths: 13
No. of Closed Parking: 12

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Others 705 sq ft 13 0
Project Developer:
Kedar infra
Organization Type: Partnership

Address: 1735, Narayan Niwas, Sakoli Corner, Sakoli Corner Kolhapur, A Ward Sakoli Corner Kolhapur, Kolhapur (M Corp.), Karvir, Kolhapur-416012

Office Phone: +91 23126 22938


Member details:
Member Name Designation
Shrikant Pandurang Patil Authorized Signatory
Palash Shrikant Patil Partner


Other Professionals involved:
Professional Name Professional Type
Shrikant Patil and Associates Architect
Pramod Ganpatrao Powar Engineer
Pramod Ganpatrao powar Other Professional
Puneet Kothari and Associates Chartered Accountant


Projects in the state by this developer:
P53000034249 - Kedar Park - Kolhapur
P53000021963 - Kedar Infra Housing - Kolhapur
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

A New Residential Haven in the Heart of Kolhapur: Introducing Kedar Infra Housing

Kedar Infra Housing, a new residential project under development in Kolhapur, Maharashtra, promises a comfortable and modern living experience. Registered under the MahaRERA with ID P53000021963, this project is set to be completed by December 30th, 2022.

Located in the desirable A Ward, Phulewadi area, the project sits on a plot of 1125 square meters, marked by R S No 1205/1/C. The land boasts a strategic location, bordered by a road to the east, R S No 1204-1-7 to the south and west, and property belonging to Vilas Nikam to the north.

Kedar Infra Housing will comprise 13 individual buildings, each with 2 floors, resulting in a total of 26 floors within the project. The project has been approved for a sanctioned built-up area of 895 square meters, allowing for a comfortable living space for residents.

The project offers a unique proposition with 13 units of 705 square feet each. The developer, Kedar Infra, a partnership firm based in Kolhapur, has a proven track record in the real estate sector. They are committed to delivering quality construction and a comfortable lifestyle for residents.

Key features and amenities include:

  • Strategic Location: Located in a prime area of Kolhapur, residents will have easy access to essential amenities, shopping centers, and transportation hubs.
  • Modern Architecture: The project boasts a modern architectural design, ensuring spacious and well-ventilated homes.
  • Limited Units: With only 13 units, residents can enjoy a sense of exclusivity and community within the project.
  • Open Space: The project incorporates 400 square meters of open space for residents to enjoy, promoting a healthy and relaxing environment.
  • Parking: The project offers 12 closed parking spaces for residents’ convenience.

Investing in Kedar Infra Housing presents a compelling opportunity for homebuyers seeking a well-designed, modern, and comfortable living experience in Kolhapur. The strategic location, limited units, and comprehensive amenities ensure a rewarding investment for the future.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
BUNGLOW NO B5 65.5 1 0
BUNGLOW NO B6 65.5 1 0
BUNGLOW NO. B1 65.5 1 0
BUNGLOW NO. B10 65.5 1 0
BUNGLOW NO. B11 65.5 1 0
BUNGLOW NO. B12 65.5 1 0
BUNGLOW NO. B13 65.5 1 0
BUNGLOW NO. B2 65.5 1 0
BUNGLOW NO. B3 65.5 1 0
BUNGLOW NO. B4 65.5 1 0
BUNGLOW NO. B7 65.5 1 0
BUNGLOW NO. B8 65.5 1 0
BUNGLOW NO. B9 65.5 1 0

 

New documents listed below were uploaded to the Documents section:

  • 2 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Internal Roads & Footpaths : 100 WBM ROAD COMPLETE
Electrical Meter Room, Sub-Station, Receiving Station : 100
Aggregate area of recreational Open Space : 100
Water Supply : 100 BOREWELL AND MUNICIPAL CONNECTION
Sewerage (Chamber, Lines, Septic Tank , STP) : 100
Storm Water Drains : 100
Landscaping & Tree Planting : 100
Street Lighting : 100
Community Buildings : 100
Treatment And Disposal Of Sewage And Sullage Water : 100

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 13 0 100

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 Stilt Floor 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90
2 Excavation 100
2 X number of Basement(s) and Plinth 100
2 Stilt Floor 100
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 90
3 Excavation 100
3 X number of Basement(s) and Plinth 100
3 Stilt Floor 100
3 X number of Slabs of Super Structure 100
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 90
4 Excavation 100
4 X number of Basement(s) and Plinth 100
4 Stilt Floor 100
4 X number of Slabs of Super Structure 100
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
4 Overall Percentage of Completion of the work done For the entire Building /Wing 90
5 Excavation 100
5 X number of Basement(s) and Plinth 100
5 Stilt Floor 100
5 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
5 Overall Percentage of Completion of the work done For the entire Building /Wing 90
6 Excavation 100
6 X number of Basement(s) and Plinth 100
6 Stilt Floor 100
6 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
6 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
6 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
6 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
6 Overall Percentage of Completion of the work done For the entire Building /Wing 90
7 Excavation 100
7 X number of Basement(s) and Plinth 100
7 Stilt Floor 100
7 X number of Slabs of Super Structure 100
7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
7 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
7 Overall Percentage of Completion of the work done For the entire Building /Wing 90
8 Excavation 100
8 X number of Basement(s) and Plinth 100
8 Stilt Floor 100
8 X number of Slabs of Super Structure 100
8 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
8 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
8 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
8 Overall Percentage of Completion of the work done For the entire Building /Wing 90
9 Excavation 100
9 X number of Basement(s) and Plinth 100
9 Stilt Floor 100
9 X number of Slabs of Super Structure 100
9 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
9 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
9 Overall Percentage of Completion of the work done For the entire Building /Wing 90
10 Excavation 100
10 X number of Basement(s) and Plinth 100
10 Stilt Floor 100
10 X number of Slabs of Super Structure 100
10 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
10 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
10 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
10 Overall Percentage of Completion of the work done For the entire Building /Wing 90
11 Excavation 100
11 X number of Basement(s) and Plinth 100
11 Stilt Floor 100
11 X number of Slabs of Super Structure 100
11 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
11 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
11 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
11 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
12 Excavation 100
12 X number of Basement(s) and Plinth 100
12 Stilt Floor 100
12 X number of Slabs of Super Structure 100
12 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
12 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
12 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
12 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
12 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
12 Overall Percentage of Completion of the work done For the entire Building /Wing 90
13 Excavation 100
13 X number of Basement(s) and Plinth 100
13 Stilt Floor 100
13 X number of Slabs of Super Structure 100
13 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
13 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
13 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
13 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
13 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
13 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Building Plan Approval (IOD) [3]
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project) [4]
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project) [4]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Form 2A
  • Other [2]
  • Other – Technical
  • Proforma of Allotment letter [2]