MH
Kolhapur
P53000003090
RERA ID: P53000003090
Project Name: Pinnac Shivalaya
Project Type: Residential
Project Status: On-Going Project *
* Projects that were already under development in May 2017, when RERA was implemented.
2026-03-31
Extended Date of Completion
The project missed completion date 2 time(s) earlier (2019-12-31, 2018-12-31).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
, Kolhapur (M Corp.), Karvir, Kolhapur-416012

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
CTS No - 1764A/3A, A-Ward

Boundaries:
Open Space
RoadN Road
WE
S
Road

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 313 sq.mt.
Sanctioned Built-up Area: 877 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 7
No. of basements: 1
No. of Plinths: 1
No. of Closed Parking: 10

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Others 448 to 1226 sq ft 13 9
Project Developer:
Suresh Rajaram Dharmadhikari c/o Rajaram Ganapati Dharmadhikari
Organization Type: Individual

Address: 2257/3, Pinnac Terrace, -, A-Ward, Near Babujamal, Kolhapur (M Corp.), Karvir, Kolhapur-416012

Office Phone: +91 23125 41878


Other Professionals involved:
Professional Name Professional Type
Mahesh Narayan Kumbhojkar Engineer
Madhav Jagdish Sarnaik Architect


Projects in the state by this developer:
P53000010828 - Pinnac Varsha Renaissance - Kolhapur
P53000003555 - Pinnac Shivanjana - Kolhapur
P53000003090 - Pinnac Shivalaya - Kolhapur
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Pinnac Shivalaya: A Haven of Tranquility in the Heart of Kolhapur

Introducing Pinnac Shivalaya, an exclusive residential project nestled in the vibrant city of Kolhapur, Maharashtra. Approved by RERA under the registration number P53000003090, this project promises a tranquil abode amidst the bustling urban landscape.

Pinnac Shivalaya, meaning “Temple of Shiva,” invites you to experience a sanctuary of serenity within the city limits. The project encompasses a single building, meticulously designed to offer discerning homebuyers a luxurious and comfortable living experience. With an envisaged completion date of December 2019, this project is poised to become a landmark in the real estate landscape of Kolhapur.

The meticulously planned layout ensures ample open spaces, creating a sense of spaciousness and tranquility. The 313-square-meter plot is strategically located in Kolhapur (M Corp.), providing easy access to all essential amenities and the city’s vibrant cultural scene.

The project boasts an array of modern amenities, including a dedicated basement, a spacious plinth, and seven sanctioned floors. Ten closed parking spaces ensure the safety and convenience of residents. A host of unit options are available, ranging from 448 to 1226 square feet, catering to diverse space requirements.

Pinnac Shivalaya is a testament to the developer’s unwavering commitment to quality and customer satisfaction. The project is backed by a reputable bank, Panchganga Bank, ensuring financial security and transparency.

Embrace the pinnacle of urban living at Pinnac Shivalaya, where luxury meets tranquility. This exclusive development offers an unparalleled opportunity to own a piece of paradise in the heart of Kolhapur. With its exceptional location, thoughtful design, and premium amenities, Pinnac Shivalaya promises to redefine the standards of urban living in the city.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
B 001 113.99 1 0
B 101 41.65 1 1
B 103 79.31 1 1
B 201 41.65 1 1
B 202 47.45 1 1
B 204 79.52 1 1
B 301 41.65 1 0
B 302 47.36 1 1
B 303 79.38 1 1
B 401 41.65 1 1
B 402 47.45 1 1
B 403 79.52 1 0
B 503 68.58 1 0

 

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2026-03-31

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 88
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 85
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
1 Overall Percentage of Completion of the work done For the entire Building /Wing 83.3

 

New documents listed below were uploaded to the Documents section:

  • 13 Disclosure of sold/ booked inventory
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 29 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 90 Completed
Electrical Meter Room, Sub-Station, Receiving Station : 90 completed
Water Supply : 90 Supply from KMC Available

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
B 103 79.31 1 1
B 202 47.45 1 1
B 204 79.52 1 1
B 302 47.36 1 1

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 100
1 X number of Slabs of Super Structure 98
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 75
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 72
1 Overall Percentage of Completion of the work done For the entire Building /Wing 78.5

 

New documents listed below were uploaded to the Documents section:

  • 12 Disclosure of sold/ booked inventory
  • 11 Disclosure of sold/ booked inventory
  • 10 Disclosure of sold/ booked inventory
  • 9 Disclosure of sold/ booked inventory
  • 8 Disclosure of sold/ booked inventory
  • 7 Disclosure of sold/ booked inventory
  • 6 Disclosure of sold/ booked inventory
  • 5 Disclosure of sold/ booked inventory
  • 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • 28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 4 Disclosure of sold/ booked inventory
  • 3 Disclosure of sold/ booked inventory
  • 2 Disclosure of sold/ booked inventory
  • 1 Disclosure of sold/ booked inventory
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 2 Declaration in FORM B
  • 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Building Plan Approval (IOD) [16]
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Proforma of Allotment letter