MH
Chandrapur
P50900019244
RERA ID: P50900019244
Project Name: CHAWHAN ROYALS
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-09-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Mul Road, Dewai Govindpur Ryt., Chandrapur (M Cl), Chandrapur-442401

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
107/43 PT

Boundaries:
107 40
107 43 PTN 107 42 a 1 1
WE
S
DP ROAD

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 9000 sq.mt.
Sanctioned Built-up Area: 5129 sq.mt.
Recreational Open Space: 666 sq.mt.
No. of Buildings sanctioned: 22
No. of Floors sanctioned: 62
No. of Plinths: 26
No. of Stilts: 3
No. of Open Parking: 23
No. of Closed Parking: 247

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 562 to 650 sq ft 56 51
3BHK 788 to 961 sq ft 48 47
Others 525 to 1295 sq ft 222 0
Shop 84 to 2152 sq ft 16 12
Project Developer:
MANGESH RATILAL CHAWHAN c/o RATILAL BHAWANJI CHAWHAN
Organization Type: Individual

Address: 1, Ratilal Chawhan, Mul Road, Mayur Coplex, Mayur Hotel, Chandrapur (M Cl), Chandrapur-442401

Office Phone: +91 79726 33941


Other Professionals involved:
Professional Name Professional Type
DEVENDRA KISHOR MOTWANI Architect
SHRAVAN KUMAR DEWANGAN Contractor


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Unveiling Chawhan Royals: A Residential Masterpiece in Chandrapur

Nestled amidst the vibrant city of Chandrapur, Chawhan Royals emerges as an exceptional residential project, meticulously planned to redefine urban living. Boasting a sprawling expanse of 9000 sqmts, this meticulously crafted development offers an array of exquisite units that cater to the diverse needs of discerning homebuyers.

Approved under RERA with ID P50900019244, Chawhan Royals exudes a sense of security and transparency. The project’s unwavering commitment to quality and legal compliance ensures a hassle-free homeownership experience.

Nestled in a highly sought-after location, the project enjoys excellent connectivity to major transportation hubs, educational institutions, healthcare facilities, and shopping centers. Its prime location offers seamless access to all that Chandrapur has to offer.

The project encompasses 26 elegantly designed buildings, featuring a blend of 2BHK, 3BHK, and spacious “Others” units. The thoughtfully planned floor plans provide ample living space, natural light, and ventilation, creating an airy and inviting ambiance. Additionally, the project boasts an exclusive collection of shops, ranging from 84 to 2152 sq ft, offering an ideal platform for businesses and entrepreneurs.

Chawhan Royals is also a haven of amenities that elevate everyday living. The project boasts a recreational open space of 666 sqmts, providing residents with a serene oasis to relax, socialize, and rejuvenate. Ample parking spaces, including 247 covered slots and 23 open slots, ensure that residents never have to worry about finding a spot for their vehicles. The project’s stringent adherence to environmental sustainability practices ensures a healthy and eco-friendly living environment.

With its exceptional location, well-planned units, and unparalleled amenities, Chawhan Royals stands as a testament to modern living at its finest. Its commitment to quality, transparencia, and sustainability makes it the perfect choice for those seeking a dream home in the heart of Chandrapur.

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
8 X number of Podiums 100
8 Stilt Floor 100
8 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
8 Overall Percentage of Completion of the work done For the entire Building /Wing 100
11 X number of Podiums 100
11 Stilt Floor 100
11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Podiums 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 100
2 Excavation 100
2 X number of Basement(s) and Plinth 100
2 X number of Podiums 100
2 Stilt Floor 100
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 100
3 X number of Podiums 100
3 Stilt Floor 100
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 100
4 Excavation 100
4 X number of Basement(s) and Plinth 100
4 X number of Podiums 100
4 Stilt Floor 100
4 X number of Slabs of Super Structure 100
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
4 Overall Percentage of Completion of the work done For the entire Building /Wing 100
5 X number of Podiums 100
5 Stilt Floor 100
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
5 Overall Percentage of Completion of the work done For the entire Building /Wing 100
6 X number of Podiums 100
6 Stilt Floor 100
6 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
6 Overall Percentage of Completion of the work done For the entire Building /Wing 100
7 X number of Podiums 100
7 Stilt Floor 100
7 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
7 Overall Percentage of Completion of the work done For the entire Building /Wing 100
9 X number of Podiums 100
9 Stilt Floor 100
9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
9 Overall Percentage of Completion of the work done For the entire Building /Wing 100
10 X number of Podiums 100
10 Stilt Floor 100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
10 Overall Percentage of Completion of the work done For the entire Building /Wing 100
12 X number of Podiums 100
12 Stilt Floor 100
12 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
12 Overall Percentage of Completion of the work done For the entire Building /Wing 100
13 Excavation 100
13 X number of Basement(s) and Plinth 100
13 X number of Podiums 100
13 Stilt Floor 100
13 X number of Slabs of Super Structure 100
13 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
13 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
13 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
13 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
13 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
13 Overall Percentage of Completion of the work done For the entire Building /Wing 100
14 Excavation 100
14 X number of Basement(s) and Plinth 100
14 X number of Podiums 100
14 Stilt Floor 100
14 X number of Slabs of Super Structure 100
14 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
14 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
14 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
14 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
14 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
14 Overall Percentage of Completion of the work done For the entire Building /Wing 100
15 Excavation 100
15 X number of Basement(s) and Plinth 100
15 X number of Podiums 100
15 Stilt Floor 100
15 X number of Slabs of Super Structure 100
15 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
15 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
15 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
15 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
15 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
15 Overall Percentage of Completion of the work done For the entire Building /Wing 100
16 Excavation 100
16 X number of Basement(s) and Plinth 100
16 X number of Podiums 100
16 Stilt Floor 100
16 X number of Slabs of Super Structure 100
16 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
16 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
16 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
16 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
16 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
16 Overall Percentage of Completion of the work done For the entire Building /Wing 100
17 Excavation 100
17 X number of Basement(s) and Plinth 100
17 X number of Podiums 100
17 Stilt Floor 100
17 X number of Slabs of Super Structure 100
17 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
17 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
17 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
17 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
17 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
17 Overall Percentage of Completion of the work done For the entire Building /Wing 100
18 Excavation 100
18 X number of Basement(s) and Plinth 100
18 X number of Podiums 100
18 Stilt Floor 100
18 X number of Slabs of Super Structure 100
18 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
18 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
18 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
18 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
18 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
18 Overall Percentage of Completion of the work done For the entire Building /Wing 100
19 Excavation 100
19 X number of Basement(s) and Plinth 100
19 X number of Podiums 100
19 Stilt Floor 100
19 X number of Slabs of Super Structure 100
19 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
19 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
19 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
19 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
19 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
19 Overall Percentage of Completion of the work done For the entire Building /Wing 100
20 Excavation 100
20 X number of Basement(s) and Plinth 100
20 X number of Podiums 100
20 Stilt Floor 100
20 X number of Slabs of Super Structure 100
20 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
20 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
20 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
20 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
20 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
20 Overall Percentage of Completion of the work done For the entire Building /Wing 100
21 Excavation 100
21 X number of Basement(s) and Plinth 100
21 X number of Podiums 100
21 Stilt Floor 100
21 X number of Slabs of Super Structure 100
21 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
21 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
21 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
21 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
21 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
21 Overall Percentage of Completion of the work done For the entire Building /Wing 100
22 Excavation 100
22 X number of Basement(s) and Plinth 100
22 X number of Podiums 100
22 Stilt Floor 100
22 X number of Slabs of Super Structure 100
22 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
22 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
22 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
22 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
22 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
22 Overall Percentage of Completion of the work done For the entire Building /Wing 100

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 52.3 14 13
2BHK 53.9 14 12
2BHK 58.9 14 13
2BHK 60.4 14 13
3BHK 73.3 6 6
3BHK 85.6 14 14
3BHK 87 14 13
3BHK 89.3 14 14
HEALTH CLUB 120.32 2 0
PROPOSED SHOP 1 200 1 0
PROPOSED SHOP 2 200 1 0
PROPOSED SHOP 3 200 1 0
PROPOSED SHOP 4 200 1 0
RH 10 48.81 20 0
RH 11 48.81 20 0
RH 12 48.81 20 0
RH 13 48.81 20 0
RH 14 48.81 20 0
RH 15 48.81 20 0
RH 16 48.81 20 0
RH 17 48.81 20 0
RH 18 48.81 20 0
RH 19 48.81 20 0
RH 20 48.81 20 0
Shop 7.83 12 12

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [8]
  • Building Plan Approval (IOD) [3]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [9]
  • Other
  • Proforma of Allotment letter [5]