MH
Bhandara
P50600025672
RERA ID: P50600025672
Project Name: KRISHNA NAGARI PHASE II
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-09-29
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2023-09-30).
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Near Mhada Colony, Khat Road, Bhandara (M Cl), Bhandara-441904

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
1068/1

Boundaries:
GAT NO 1061 AND GAT NO 1060
GAT NO 1067N GAT NO 1068
WE
S
GAT NO 1069

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 5800 sq.mt.
Sanctioned Built-up Area: 2998 sq.mt.
Recreational Open Space: 464 sq.mt.
No. of Buildings sanctioned: 30
No. of Floors sanctioned: 60
No. of Plinths: 30

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Bungalow 810 to 928 sq ft 30 0
Project Developer:
SUNNY CONSTRUCTIONS
Organization Type: Partnership

Address: 01, Sunny Tower, Khat Road, Kham Talao, Bhandara, Bhandara (M Cl)-441904

Office Phone: +91 71842 98930


Member details:
Member Name Designation
Anil Baburao Mendhe Partner
Siddharth Sunil Mendhe Partner


Other Professionals involved:
Professional Name Professional Type
Tikaram Shrawan Sonwane Architect
Anup Deorav Yelmule Engineer
Ajay Gandeja and Associates Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Embrace the Pinnacle of Residential Living: Introducing Krishna Nagari Phase II

In the heart of Bhandara, nestled amidst verdant surroundings and tranquil ambiance, a new residential masterpiece awaits you. Krishna Nagari Phase II, a project under construction by the esteemed SUNNY CONSTRUCTIONS, promises to redefine the standards of modern living. Bearing RERA ID P50600025672, this meticulously planned development epitomizes quality, convenience, and affordability.

A Haven of Tranquility and Comfort

Spanning an expansive 5800 square meters, Krishna Nagari Phase II boasts 30 thoughtfully designed buildings, each meticulously crafted to ensure maximum comfort and aesthetic appeal. The proposed date of completion is September 2023, with an extended deadline of September 2024. The project has no outstanding litigations, guaranteeing peace of mind for prospective investors.

Exquisite Bungalow Units at Your Disposal

Krishna Nagari Phase II offers an exclusive collection of 30 bungalow units, ranging in size from 810 to 928 square feet. These spacious and well-ventilated homes feature state-of-the-art amenities and modern finishes to cater to your every need.

Unparalleled Amenities

The project boasts an array of amenities designed to enhance your lifestyle. Ample recreational open space, totaling 464 square meters, provides the perfect setting for leisure and relaxation. With a dedicated team of professionals and a commitment to excellence, SUNNY CONSTRUCTIONS ensures that every aspect of Krishna Nagari Phase II meets the highest standards.

A Prime Location to Call Home

Situated in the rapidly developing Bhandara (M Cl), Krishna Nagari Phase II enjoys excellent connectivity to major roads and public transportation. Its proximity to essential services, such as schools, hospitals, and shopping centers, makes it a highly convenient location.

Embark on a Journey of Exceptional Living

Krishna Nagari Phase II is not merely a residential address; it is an invitation to experience a life filled with comfort, luxury, and convenience. We invite you to embark on a journey of exceptional living, surrounded by unparalleled amenities and the peace of mind that comes with investing in a RERA-registered project. Contact SUNNY CONSTRUCTIONS today to schedule a site visit and discover the home of your dreams.

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
2 Overall Percentage of Completion of the work done For the entire Building /Wing 50
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 80
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
4 Overall Percentage of Completion of the work done For the entire Building /Wing 68
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 70
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 70
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
5 Overall Percentage of Completion of the work done For the entire Building /Wing 66
6 Excavation 100
6 X number of Podiums 50
6 Overall Percentage of Completion of the work done For the entire Building /Wing 15
7 Excavation 100
7 X number of Podiums 50
7 Overall Percentage of Completion of the work done For the entire Building /Wing 15
21 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
21 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
21 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
21 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
21 Overall Percentage of Completion of the work done For the entire Building /Wing 80
22 Excavation 100
22 X number of Podiums 50
22 Overall Percentage of Completion of the work done For the entire Building /Wing 15
26 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
26 Overall Percentage of Completion of the work done For the entire Building /Wing 65

 

New documents listed below were uploaded to the Documents section:

  • 6 Disclosure of sold/ booked inventory
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [4]
  • Building Plan Approval / NA Order for plotted development [11]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report [2]
  • Declaration about Commencement Certificate
  • Declaration in FORM B [2]
  • Details of encumbrances
  • Disclosure of sold/ booked inventory [5]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) [2]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [4]
  • Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development [2]
  • Proforma of Allotment letter