Project Name: BHAGWANDAS NAGRI
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2026-06-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Bahirwadi,Adj. To New Mondha, Tq.Dist Beed, Survey No.30/1/2, Bid (M Cl), Bid, Beed-431122

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
Survey No 30/1/2,Bahirwadi, Beed

Boundaries:
LAND OF BANSODE
FIFTEEN METER WIDE ROADN LAND of NANAKRAM VERMA
WE
S
LAND OF MUKTAJI SALUNKE

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 11728 sq.mt.
Sanctioned Built-up Area: 17568 sq.mt.
Recreational Open Space: 1761 sq.mt.
No. of Buildings sanctioned: 16
No. of Floors sanctioned: 64

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 320 sq ft 448 140
Project Developer:
VAISHANAVI COTTON INDUSTRIES
Organization Type: Partnership

Address: Survey No. 30/1/2, Bahirwadi Adj To New Mondha, Taluka Beed, Dist Beed, Near Hanuman Mandir, Bid (Rural) (Ct), Bid, Beed-431122

Office Phone: +91 24024 84414


Member details:
Member Name Designation
DHARMENDRA SHANTILAL SISODIYA Authorized Signatory
HARISHCHANDRA SHRIPAT PATIL Partner


Other Professionals involved:
Professional Name Professional Type
VAISHANAVI COTTON INDUSTRIES Contractor
ARC ASSOCIATES Architect
KAILASH TODKARI Engineer
Rameshwar Ranbhare Chartered Accountant


Litigations

Litigations related to the project ? No

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [2]
  • Building Plan Approval / NA Order for plotted development
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory [3]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [2]