MH
Ahmednagar
P52200050092
RERA ID: P52200050092
Project Name: FATEMA ELITE
Project Type: Mixed (Plots & Buildings)
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2029-12-31
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Shrirampur, Weston City Road, Shrirampur (M Cl), Ahmednagar-413709

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
CTS NO 2183 S NO 96/121

Boundaries:
18 MTRS D P ROAD
ADJ FATEMA HOUSING SOCIETYN JIRANGE VASTI
WE
S
ADJ FATEMA HOUSING SOCIETY

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 9000 sq.mt.
Sanctioned Built-up Area: 8656 sq.mt.
Recreational Open Space: 811 sq.mt.
No. of Buildings sanctioned: 10
No. of Floors sanctioned: 4
No. of Plinths: 5
No. of Closed Parking: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1RK 0 sq ft 0 0
2BHK 1002 to 1323 sq ft 34 7
Office 0 sq ft 0 0
Others 835 sq ft 1 0
Project Developer:
SAMEENA ANJUM SHAIKH c/o JALILKHAN KARIMKHAN PATHAN
Organization Type: Individual

Address: , Nafees Palace, Anglo High School Road, Ward No 2, Anglo High School Opposite, Shrirampur (M Cl), Shrirampur, Ahmednagar-413709

Office Phone: +91 93700 64666


Other Professionals involved:
Professional Name Professional Type
Sonal Nikhil Agrawal Architect
Abid Ayyub Kureshi Engineer
Sanjay Pagare Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing FATEMA ELITE: A New Era of Luxury Living in Shrirampur

FATEEMA ELITE, a promising new mixed-use development project in Shrirampur, Maharashtra, is set to redefine luxury living in the region. This ambitious project, registered with RERA ID: P52200050092, boasts a prime location on WESTON CITY ROAD, nestled between JIRANGE VASTI to the east and ADJ FATEMA HOUSING SOCIETY to the west and south.

Spanning across a total area of 9000 sq mts, FATEMA ELITE will feature a total of 10 buildings, meticulously designed to offer a harmonious blend of residential and commercial spaces. The project offers a wide range of meticulously crafted 2BHK units, ranging in size from 695 to 1594 sq ft, with a total of 83 units available. Additionally, a single, unique unit of 835 sq ft caters to diverse needs.

FATEEMA ELITE goes beyond the ordinary by prioritizing recreational spaces, allocating 811 sq mts for the enjoyment of residents. The project is sanctioned for a total built-up area of 8656 sq mts with a FSI of 8656. With 22 sanctioned floors and 10 plinths, FATEEMA ELITE offers a unique vertical living experience. The project further provides convenience with 42 closed parking spaces.

This project, currently under construction, is scheduled for completion by December 31st, 2029. FATEMA ELITE is backed by HDFC BANK, adding an extra layer of financial security and credibility.

With its exceptional location, diverse unit offerings, and focus on modern amenities, FATEEMA ELITE is poised to set a new benchmark for luxury living in Shrirampur. Whether you’re seeking a spacious and luxurious residence or a profitable investment opportunity, FATEEMA ELITE promises a rewarding experience.

New documents listed below were uploaded to the Documents section:

  • 1 Other – Legal
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
3 Overall Percentage of Completion of the work done For the entire Building /Wing 52
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
4 Overall Percentage of Completion of the work done For the entire Building /Wing 62
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
5 Overall Percentage of Completion of the work done For the entire Building /Wing 62
9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
9 Overall Percentage of Completion of the work done For the entire Building /Wing 62

 

Building/Plot Details section updated for field(s) as below:

Field updated New value
Number of Plinth 5
Number of Sanctioned Floors 4
Number of Closed Parking 1

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1RK 0 0 0
2BHK 111.87 1 1
2BHK 122.99 1 1
2BHK 93.15 7 2
2BHK 93.2 7 1
2BHK 96.16 9 2
Office space 0 0 0

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 2 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 64.59 1 0
2BHK 65.06 3 0
2BHK 65.53 3 0
2BHK 66.26 3 0
2BHK 66.43 3 0
2BHK 73.55 2 0
2BHK 74.28 2 0
2BHK 77.4 3 0
2BHK 77.93 3 0
2BHK 87.26 5 0
2BHK 88.1 5 0
2BHK 89.78 10 0
2BHK 93.15 7 2
2BHK 93.2 7 1
2BHK 93.35 8 0
2BHK 96.16 9 2
2BHK 99.28 5 0
2BHK 108.78 1 0
2BHK 111.87 1 1
2BHK 122.99 1 1
2BHK 148.13 1 0
Club house 77.6 1 0

 

New documents listed below were uploaded to the Documents section:

  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 35
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
3 Overall Percentage of Completion of the work done For the entire Building /Wing 36.5
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 35
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
4 Overall Percentage of Completion of the work done For the entire Building /Wing 46.5
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 35
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
5 Overall Percentage of Completion of the work done For the entire Building /Wing 46.5
9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 35
9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
9 Overall Percentage of Completion of the work done For the entire Building /Wing 46.5

 

New documents listed below were uploaded to the Documents section:

  • 1 Disclosure of sold/ booked inventory

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [4]
  • Building Plan Approval / NA Order for plotted development [10]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Deviation Report with respect to Allotment letter
  • Deviation Report with respect to model copy of Agreement
  • Disclosure of Interest in Other Real Estate Organizations
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [5]
  • Other – Finance
  • Other – Technical
  • Proforma of Agreement for sale
  • Proforma of Allotment letter
  • a Details of encumbrances concerned to Finance [2]
  • b Details of encumbrances concerned to Legal [2]