2024-06-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Savedi, Vadgaon Gupta Road, , Nagar, Ahmednagar-414003

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
3/256/4

Boundaries:
9 M ROAD
PLOT NO 2N OPEN SPACE
WE
S
S NO 256-6

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 552 sq.mt.
Sanctioned Built-up Area: 1349 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 5
No. of Plinths: 1
No. of Stilts: 1
No. of Closed Parking: 39

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 415 to 423 sq ft 10 0
2BHK 610 sq ft 10 0
Project Developer:
TRIMURTI CONSTRUCTIONS
Organization Type: Partnership

Address: 105, Krushna Towers, Pipeline Road, Savedi, Parijat Corner, , Nagar, Ahmednagar-414003

Office Phone: +91 24135 90841


Member details:
Member Name Designation
NITIN ARJUN SHINDE Authorized Signatory
SONAL RAOSAHEB BARASKAR Partner
SUNIL BHANUDAS SARODE Partner
ROHAN BABAN SARODE Partner


Other Professionals involved:
Professional Name Professional Type
ROHAN BABAN SARODE Engineer
B B SALAPURE Chartered Accountant
AMBADAS D LODHE Other Professional
Adv SUNIL HARISHCHANDRE Other Professional
SNEHAL KALYAN SONAWNE Architect


Projects in the state by this developer:
P52200030627 - TRIMURTI RESIDENCY - Ahmednagar
P51700028899 - PURVA PRIME - Thane
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Trimurti Residency: A Premium Residential Haven

In the vibrant city of Ahmednagar, Trimurti Constructions, a renowned real estate firm, proudly unveils Trimurti Residency, an exceptional residential project thoughtfully designed to elevate living standards.

Nestled in the serene neighborhood of Saveli, Trimurti Residency occupies a prime location, offering easy access to essential amenities and recreational facilities. The project has been meticulously planned and approved by MahaRERA (P52200030627), ensuring transparency and compliance with industry standards.

This newly launched project is scheduled for completion by June 30, 2024, and features a single residential building consisting of five well-planned floors, including one stilt level. Trimurti Residency boasts a range of thoughtfully curated amenities, including a spacious open space (0 sqmts) for relaxation and recreation, dedicated parking for residents and visitors (39 closed parking spaces), and a host of other features to enhance comfort and convenience.

With a total plot area of 552 sqmts, Trimurti Residency offers a range of apartment options to cater to diverse needs. The project boasts ten meticulously crafted 1BHK units ranging from 415 to 423 sq ft and ten spacious 2BHK units with an ample area of 610 sq ft.

The project’s commitment to quality construction and sustainable design is evident in every aspect of its execution. Trimurti Constructions, with its unwavering focus on customer satisfaction, has meticulously chosen a distinguished financial partner, Federal Bank, to ensure financial stability and peace of mind for its esteemed residents.

Trimurti Residency is an ideal choice for families and individuals seeking a modern and comfortable living experience. Its prime location, premium amenities, and exceptional craftsmanship set it apart as an exceptional residential project that promises to redefine urban living in Ahmednagar.

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 1 Disclosure of sold/ booked inventory
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Architect’s Certificate on Completion of Project (Form 4)
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 39 30 100

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 85

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 38.61 5 0
1BHK 39.3 5 0
2BHK 56.72 10 0

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 Septic Tank to Municipal Drainage
Water Supply : 100 BOREWELL AND MUNICIPAL WATER CONNECTION
LIFT WITH BACKUP : 100 AS REQUIRED
Electrical Meter Room, Sub-Station, Receiving Station : 100 METER ROOM IN PARKING
Water Conservation, Rain water Harvesting : 100 AS PER NORMS
Storm Water Drains : 100 AS PER NORMS
Landscaping & Tree Planting : 100 AS PER NORMS
Street Lighting : 100 AS PER NORMS

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances [2]
  • Deviation Report with respect to Allotment letter
  • Disclosure of Interest in Other Real Estate Organizations
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • Other [3]
  • Proforma of Agreement for sale
  • Proforma of Allotment letter [3]
  • a Details of encumbrances concerned to Finance
  • b Details of encumbrances concerned to Legal